PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Friday, March 10, 2017
.
Number of inspections:
23
Percentage of inspections complete:
96 %
Percentage of inspections not complete:
4 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC15-01420
General Inspection
2/28/2017
3/9/2017
P
ESC16-00761
Site Final
3/9/2017
3/10/2017
3/17/2017 3:32:05 PM
P
CANC
rescheduled
ESC16-00973
General Inspection
3/8/2017
3/10/2017
3/13/2017 7:59:11 AM
A
CANC
ESC16-00556
General Inspection
3/10/2017
3/10/2017
3/10/2017 1:44:07 PM
CANC
ESC16-00414
DOC - Permit Finaled
3/10/2017
3/10/2017
3/10/2017 1:42:35 PM
P
PASS
ESC15-00031
General Inspection
3/10/2017
3/10/2017
3/10/2017 1:42:11 PM
CANC
ESC15-00955
General Inspection
3/10/2017
3/10/2017
3/10/2017 1:42:04 PM
CANC
ESC16-00741
Site Preparation
3/9/2017
3/10/2017
3/10/2017 1:41:56 PM
A
PASS
work already started. GRD permit issued; BLD not issued. ESI is contractor.
Work commenced was for offsite utility connections by Idaho Power and Track Utilities. All storm drain inlets now have sediment filter bags installed. No trackout or discharges.
Provided RP Jason contact info to call regarding site preparation inspection
ESC16-01446
General Inspection
3/10/2017
3/10/2017
3/10/2017 1:40:09 PM
P
FAIL
Significant trackout to bike bike lane and traffic lane on Myrtle.
Correction request to RP Chris with Headwaters and Tom with Alta:
- provide new rock to improve muddy construction access
- sweep Myrtle sidewalk, gutter, and north traffic lane to remove trackout and accumulated sediment.
RP stated new rock has now been ordered, Curtis Clean Sweep to sweep Myrtle at the end of the day.
Posted green ESC sign on 13th Street entrance.
Will re-inspect Monday
ESC16-01354
General Inspection
3/10/2017
3/10/2017
3/10/2017 1:24:39 PM
P
PASS
WIP on vertical construction for parking garage. Using Myrtle entrance and exit on 11th. No trackout. RP on site. No corrections requested.
ESC16-00490
Site Final
3/10/2017
3/10/2017
3/10/2017 10:25:05 AM
A
PASS
Disturbed area along access driveway is now vegetated. Site is stabilized, no temporary BMPs remaining. ESC conditions satisfied.
ESC16-00778
Aging Inspection
3/10/2017
3/10/2017
3/10/2017 10:22:44 AM
PASS
WIP on frame. Permit sign posted. Long paved driveway preserved, no trackout or discharges observed to Rose HIll. Flat lot within developed/vegetated area.
ESC16-00974
Aging Inspection
3/10/2017
3/10/2017
3/10/2017 10:09:29 AM
CANC
ESC16-01678
Site Final
3/10/2017
3/10/2017
3/10/2017 10:08:05 AM
A
PASS
Carports installed. No construction activity or temp BMPs remaining. BLD finaled. ESC conditions satisfied.
ESC14-00983
Site Final
3/10/2017
3/10/2017
3/10/2017 10:06:49 AM
A
PASS
Construction on both buildings complete and units are occupied. Parking lot and permanent stormwater system installed, common areas landscaped. No trash, loose materials on site. All temporary BMPs removed. ESC conditions satisfied.
ESC14-00983
General Inspection
3/10/2017
3/10/2017
3/10/2017 10:05:26 AM
PASS
ESC16-01250
Site Final
3/9/2017
3/10/2017
3/10/2017 9:35:44 AM
A
PASS
The project is located within a secured area. If you need access please call me 30 prior to the inspection and I can escort you in the area. Phone #: ###-#### Inspection requested via web by Eldon Oyadomari
No ESC requests. Project complete, conditions satisfied.
ESC04-01059
DOC - Permit Finaled
3/10/2017
3/10/2017
3/10/2017 8:21:12 AM
P
PASS
old expired permit removed from system
ESC04-01056
DOC - Permit Finaled
3/10/2017
3/10/2017
3/10/2017 8:20:53 AM
P
PASS
old expired permit removed from system
ESC16-00423
DOC - Permit Finaled
3/10/2017
3/10/2017
3/10/2017 8:14:01 AM
P
PASS
demo complete. New SFH covered under ESC16-00271
ESC15-01532
General Inspection
3/10/2017
3/10/2017
3/10/2017 7:52:06 AM
CANC
project complete, wattles along path will need to be removed this Spring. No inpection
ESC16-00329
General Inspection
3/10/2017
3/10/2017
3/10/2017 7:49:16 AM
CANC
ESC16-00225
General Inspection
3/10/2017
3/10/2017
3/10/2017 7:48:50 AM
CANC