ESC18-00920
| General Inspection | 3/5/2020 | 3/10/2020 | 3/17/2020 12:02:51 PM | P | CANC |
|
|
|
ESC18-01692
| Site Final | 3/10/2020 | 3/10/2020 | 3/10/2020 3:56:57 PM | P | PASS |
|
|
Remodel/renovation complete. Homeowner completing landscaping/stabiilzat. No temporary BMPs left behind. No ESC requests, permit finaled. BLD already finaled.
|
ESC19-00809
| Site Final | 3/10/2020 | 3/10/2020 | 3/10/2020 3:46:14 PM | P | PASS |
|
|
|
ESC19-00921
| Site Final | 3/10/2020 | 3/10/2020 | 3/10/2020 3:45:54 PM | P | PASS |
|
|
|
ESC19-00922
| Site Final | 3/10/2020 | 3/10/2020 | 3/10/2020 3:45:35 PM | P | PASS |
|
|
|
ESC19-00690
| Site Final | 3/10/2020 | 3/10/2020 | 3/10/2020 3:45:17 PM | P | PASS |
|
|
|
ESC19-00690
| Site Final | 3/10/2020 | 3/10/2020 | 3/10/2020 3:45:08 PM | P | CANC |
|
|
|
ESC19-00808
| Site Final | 3/10/2020 | 3/10/2020 | 3/10/2020 3:44:38 PM | P | PASS |
|
|
|
ESC19-00688
| Site Final | 3/10/2020 | 3/10/2020 | 3/10/2020 3:44:21 PM | P | PASS |
|
|
|
ESC19-00032
| Site Final | 3/10/2020 | 3/10/2020 | 3/10/2020 3:44:03 PM | P | PASS |
|
|
|
ESC19-00043
| Aging Inspection | 3/10/2020 | 3/10/2020 | 3/10/2020 3:30:52 PM | | PASS |
|
|
|
ESC19-00042
| Aging Inspection | 3/10/2020 | 3/10/2020 | 3/10/2020 3:30:38 PM | | PASS |
|
|
|
ESC19-01007
| Site Final | 3/10/2020 | 3/10/2020 | 3/10/2020 3:24:41 PM | P | PASS |
|
|
Home complete and landscaped. Subdivision BMPs to remain installed for active construction
|
ESC18-01089
| General Inspection | 3/10/2020 | 3/10/2020 | 3/10/2020 3:20:06 PM | P | PASS |
|
|
No debris or material in road on Foxgrove. Road appears to be recently swept. Trash contained. Concrete washout pans being utilized, good construction entrance. Storm drains have sediment protection installed. RP on duty. No corrections at this time for Foxgrove (phase 3)
|
ESC19-00823
| Site Final | 3/10/2020 | 3/10/2020 | 3/10/2020 3:16:23 PM | P | PASS |
|
|
Home complete and landscaped. Subdivision BMPs to remain installed for active construction
|
ESC19-00755
| Site Final | 3/10/2020 | 3/10/2020 | 3/10/2020 3:16:06 PM | P | PASS |
|
|
Home complete and landscaped. Subdivision BMPs to remain installed for active construction
|
ESC19-01006
| Site Final | 3/10/2020 | 3/10/2020 | 3/10/2020 3:08:27 PM | P | PASS |
|
|
Home complete and landscaped. Subdivision BMPs to remain installed for active construction
|
ESC19-00203
| General Inspection | 3/10/2020 | 3/10/2020 | 3/10/2020 12:15:27 PM | P | PASS |
|
|
Permit posted. No trackout, large dumpster on site. No spills, discharges or dumped material.
Correction needed is to pick up any loose remaining loose trash on the perimeter and inside of site.
|
ESC20-00168
| Site Preparation | 3/10/2020 | 3/10/2020 | 3/10/2020 11:08:41 AM | P | PASS |
|
|
ESC permit sign posted. General ESC permit, excavation started, perimeter vegetation preserved, ESC permit sign posted.
Reviewed requirements with Seth project foreman with Complete Property management
Approved for construction.
|
ESC20-00169
| Site Preparation | 3/10/2020 | 3/10/2020 | 3/10/2020 11:08:25 AM | P | PASS |
|
|
ESC permit sign posted. General ESC permit, excavation started, perimeter vegetation preserved, ESC permit sign posted.
Reviewed requirements with Seth project foreman with Complete Property management
Approved for construction.
|
ESC19-01138
| Tracking Control | 3/10/2020 | 3/10/2020 | 3/10/2020 10:50:04 AM | P | FAIL |
|
|
Lots of accumulated mud in gutter. Street dirty. Loose trash around site, multiple units and only one trash container/trailor
Verbal correction notice to RP-GC Carl. Notify ESC 3rd party inspector JEC to fix inlet.
Storm drain protection improperly installed, no block for curb cut.
Multiple repeat violations & lack of clean up at site through duration of project. Compliance date is Thursday 3 PM
|
ESC19-00156
| Tracking Control | 3/9/2020 | 3/10/2020 | 3/10/2020 10:48:02 AM | A | FAIL |
|
|
Lots of accumulated mud in gutter. Street dirty. Loose trash around site, multiple units and only one trash container/trailor
Verbal correction notice to RP-GC Carl. Notify ESC 3rd party inspector JEC to fix inlet.
Storm drain protection improperly installed, no block for curb cut.
Multiple repeat violations & lack of clean up at site through duration of project. Compliance date is Thursday 3 PM
|