Inspections for the day of: Monday, March 11, 2019.
Number of inspections: 13
Percentage of inspections complete: 77 %
Percentage of inspections not complete: 23 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-01749 General Inspection3/7/20193/7/2019   
ESC16-00225 General Inspection3/7/20193/7/2019 P 
ESC17-00791 General Inspection3/6/20193/7/2019 P 
ESC14-00788 Aging Inspection3/11/20193/11/20193/19/2019 2:22:55 PM PASS
3 homes in progress, permitted seperately. Subdivision BMPs installed. No trackout or hillside erosion observed.

Recommend a neighborhood designated washout containment.
ESC16-00489 General Inspection3/11/20193/11/20193/19/2019 1:34:35 PM PASS
ESC17-01389 General Inspection3/11/20193/11/20193/19/2019 1:33:42 PM CANC
ESC17-00013 General Inspection3/11/20193/11/20193/19/2019 1:16:40 PM CANC
ESC17-00519 Aging Inspection3/11/20193/11/20193/15/2019 3:16:00 PM CANC
ESC18-01636 General Inspection3/8/20193/11/20193/14/2019 3:27:25 PMACANC
ESC17-01360 BMP Violation3/8/20193/11/20193/13/2019 5:27:01 PMPPEND
corrections in progress. Follow up inspection scheduled
ESC18-00946 General Inspection3/11/20193/11/20193/12/2019 8:16:51 AMPFAIL
Corrections needed:

- Rills on slope need raking, tracking, and either temporary vegetation, ground cover or erosion control blankets.

- all gator guard wattles need to be properly installed with staking and backfill per specifications

- fix silt fence, conduct maintenance.

Call made to Damion to inform that corrective actions are still needed. Fees have not been paid.
ESC17-01200 General Inspection3/11/20193/11/20193/12/2019 8:13:28 AM CANC
ESC18-01408 Site Preparation3/11/20193/11/20193/11/2019 11:28:20 AMAPASS
Mark w/ Wright Bros (mid afternoon)

Rock construction entrance installed for Broadway access. ESC permit signs posted. Trucks to pull in off Broadway and exit via alley. Request for regular sweeping of the paved stretch of alley (north and south are dirt/gravel).

Dewatering for basement excavation is in progress. Water is clear and well point hose is connected to dewatering tank with baffles.

Reviewed concrete washout requirements. Follow up inspection scheduled.