Inspections for the day of: Wednesday, March 11, 2020.
Number of inspections: 14
Percentage of inspections complete: 93 %
Percentage of inspections not complete: 7 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC19-01710 General Inspection3/3/20203/11/20203/18/2020 12:11:23 PMACANC
check for construciton entrance etc
ESC16-00935 General Inspection3/11/20203/11/20203/17/2020 12:03:01 PM CANC
ESC19-00584 General Inspection3/11/20203/11/20203/11/2020 12:41:27 PMPPASS
WIP excavating stormwater ponds. Currently no offsite disharge because crew is working on stormwater vault at east end where water was discharging.

Well pumped water being held in the east pond currently. No outlet. No overflow, plenty of capacity.

Knife River RP Rex monitoring. Street sweeper unit circulating site. No fugitive dust plumes observed.

No corrections requested at this time.
ESC18-01682 General Inspection3/11/20203/11/20203/11/2020 12:36:34 PM CANC
ESC20-00067 Site Preparation3/10/20203/11/20203/11/2020 12:27:44 PMAPEND
Lindsay PM w/ Farwest

2088911787 at 9 AM

to be rescheduled by contractor, site not ready for construction
ESC19-00763 General Inspection3/11/20203/11/20203/11/2020 12:26:17 PM CANC
ESC19-00044 Aging Inspection3/11/20203/11/20203/11/2020 12:26:08 PM CANC
ESC19-00045 Aging Inspection3/11/20203/11/20203/11/2020 12:25:56 PM CANC
ESC19-00509 General Inspection3/11/20203/11/20203/11/2020 11:10:02 AMPPASS
No trackout. No activity at time of inspection. Concrete washout utilized. Permit sign posted. No loose trash. Approved
ESC19-01084 Site Preparation3/9/20203/11/20203/11/2020 10:50:06 AMAPASS
Shayne 10 AM

Site start-up & initial BMPs are installed:
- Responsible Person on duty
- ESC permit sign posted
- Constructtion entrance had adequate length, under lying fabric, and angular rock
- Clearing limits have been staked, site perimeter has chain link fence and preserved sidewalks and vegetation strips
- Pusher Excavation (Dante) will provide lined concrete washout prior to any concrete work
- Notified that they will need a water truck onsite to manage fugitive dust
- Surrounding storm drains have sediment bags installed.

RP Shayne to provide dewatering plan prior to dewatering work. Follow up inspection scheduled

Approved for construciton
ESC19-00041 General Inspection3/11/20203/11/20203/11/2020 8:38:29 AM CANC
ESC18-01687 General Inspection3/11/20203/11/20203/11/2020 8:29:43 AM PASS
Bike park complete. Storm drains along Mtn Cove Road have inlet protection installed for until full stabilization. Permit open to monitor temp BMPs and revegetation with Parks n Rec.

Provided contact card to facility manager to discuss any ESC issues. There are a few spots within the park. Also recommmend surrounding the rocky swales perimeter sediment control wattle to keep fine material out of the free draining areas
ESC18-01171 General Inspection3/11/20203/11/20203/11/2020 8:26:19 AM CANC
ESC19-00303 General Inspection3/11/20203/11/2020 P