Inspections for the day of: Friday, March 13, 2020.
Number of inspections: 9
Percentage of inspections complete: 89 %
Percentage of inspections not complete: 11 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC19-00303 General Inspection3/11/20203/11/2020 P 
ESC19-00529 Site Final3/12/20203/13/20203/20/2020 2:06:20 PMPPASS
ESC20-00067 Site Preparation3/13/20203/13/20203/16/2020 1:13:31 PMPCANC
ESC19-00995 Conference3/13/20203/13/20203/16/2020 11:45:49 AMPPASS
WIP on installing railings, repairing existing pathways, prepping for new pathways for lookout piers. This week bridges are being painted, tarp containment areas have been set up under the bridge.

All in water work is complete, but they do need to finish placing the walkway platform loop. Crews removed the silt fence turbidity curtain at the drainage ditch outlet as requested.

Request to provide concrete washout pan prior to any cement pathway work. No trackout, permit posted. BMPs installed, ESC trained staff on site.

Approved. Current project manager is Kyle G 208 ###-####
ESC16-00406 General Inspection3/13/20203/13/20203/13/2020 8:25:23 AM CANC
rescheduled
ESC18-01527 General Inspection3/13/20203/13/20203/13/2020 8:23:00 AM CANC
rescheduled
ESC18-00498 General Inspection3/13/20203/13/20203/13/2020 8:22:21 AM CANC
rescheduled
ESC19-00781 General Inspection3/13/20203/13/20203/13/2020 8:20:13 AM CANC
rescheduled for site final
ESC18-01411 General Inspection3/13/20203/13/20203/13/2020 8:19:17 AM CANC
see also ESC18-00117