PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Tuesday, March 14, 2017
.
Number of inspections:
15
Percentage of inspections complete:
93 %
Percentage of inspections not complete:
7 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC15-01420
General Inspection
2/28/2017
3/9/2017
P
ESC15-00434
General Inspection
3/14/2017
3/14/2017
3/16/2017 2:43:19 PM
CANC
ESC16-00339
Aging Inspection
3/14/2017
3/14/2017
3/15/2017 2:33:52 PM
CANC
ESC14-00719
General Inspection
3/14/2017
3/14/2017
3/15/2017 2:31:02 PM
P
PEND
Vertical construction of SWHQ is complete, with much of the building occupied. Some site improvements, landscaping, and final clean up remains. No active construction at time of inspection, construction access is at 11th & Myrtle. Temporary MS4 inlet protect around Front, Myrtle, 11th, & 9th has been removed.
Correction needed:
- need to address clean up of concrete washout and debris in offsite laydown area #3 west of 13th Street
ESC16-00966
General Inspection
3/9/2017
3/14/2017
3/15/2017 2:27:49 PM
P
CANC
ESC15-01613
General Inspection
3/13/2017
3/14/2017
3/15/2017 2:27:26 PM
P
FAIL
Corrections required:
- continue sweep up of closed traffic lane and parking lane on Front in between 8th & 9th. Lots of dust and dirt accumulated
- install sediment protection on MS4 inlet on 9th Street at Front. Note: - drain on 8th & Front grate is unable to be removed. Increase sweeping frequency in this area en lieu of no inlet protection - recommend daily
- Post new ESC permit sign at 8th & Grove entrance area (provided sign to flagger to giver to RP Adam)
Corrections issued verbally to RP Adam with ESI. Follow up inspection for corrections on Friday 3/17
ESC16-00350
Aging Inspection
3/14/2017
3/14/2017
3/14/2017 11:45:58 AM
CANC
ESC16-00350
DOC - Permit Finaled
3/14/2017
3/14/2017
3/14/2017 11:45:52 AM
P
PASS
no activity on BLD since October 2016. Permit expired.
ESC15-01175
General Inspection
3/14/2017
3/14/2017
3/14/2017 11:44:07 AM
PASS
ESC03-00534
DOC - Permit Finaled
3/14/2017
3/14/2017
3/14/2017 11:42:19 AM
P
PASS
old expired permit removed from database
ESC12-00403
General Inspection
3/14/2017
3/14/2017
3/14/2017 10:59:57 AM
PEND
MS4 inlets on Myrtle and 9th street have had filter bags removed. Perimeter and landscaping is mostly complete. Some construction access and activity is ongoing Myrtle and 11th. No trackoout observed.
Correction needed:
Remove concrete chunks and and clean up waste materials from laydown yard # 3 west of 13th street.
ESC16-00325
Aging Inspection
3/14/2017
3/14/2017
3/14/2017 8:28:57 AM
PASS
Earth disturbance stabilzed. BLD still open but no activity. ESC permit finaled.
ESC16-00325
DOC - Permit Finaled
3/14/2017
3/14/2017
3/14/2017 8:27:28 AM
P
PASS
ESC13-00806
General Inspection
3/14/2017
3/14/2017
3/14/2017 8:26:25 AM
CANC
ESC16-00973
Site Final
3/13/2017
3/14/2017
3/13/2017 10:15:28 AM
A
NR
No violations at site. Perimeter landscaping on the north border not yet established. Parking lot paved and stormwater retention installed. Some stockpiles remain on site and minor activity. Will monitor through Spring