Inspections for the day of: Wednesday, March 15, 2017.
Number of inspections: 8
Percentage of inspections complete: 88 %
Percentage of inspections not complete: 13 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-01420 General Inspection2/28/20173/9/2017 P 
ESC16-01520 Tracking Control3/2/20173/15/20173/23/2017 11:51:16 AMPCANC
ESC16-00966 General Inspection3/9/20173/15/20173/23/2017 11:26:20 AMACANC
ESC16-00208 General Inspection3/15/20173/15/20173/15/2017 2:22:03 PM PASS
No activity currently. Plaza bricks installed, will resume rest of project once the Centre on Grove expansion project is complete - see ESC15-01613.
ESC15-00976 General Inspection3/15/20173/15/20173/15/2017 10:29:58 AM PASS
WIP on Idaho Street townhomes. Construction access through paved alley. Idaho Street sidewalk and landscaping installed. No trackout or discharges. Site perimeter is clean.
ESC16-00948 General Inspection3/15/20173/15/20173/15/2017 10:17:49 AMAPASS
Subdivision development complete, parcels ready for SFH construction. Site preparations conducted for Edgemoor Lane for Legacy Development. Neff Street homes to be later this year. WIP on Odom Estates to east of development. Newly installed storm drains and MS4 on 28th have sediment protection. No corrections requested.
ESC16-01582 General Inspection3/15/20173/15/20173/15/2017 10:15:17 AMAPASS
WIP on utilities. Limited BMPs installed, permit sign posted. WIP installing communications utilities. No significant trackout or complaints received. No corrections requested
ESC17-00147 Site Preparation3/14/20173/15/20173/15/2017 10:01:07 AMAPASS
Grant Phone #: ###-####

Permit sign posted. MS4 inlet at 28th and Edgemoor installed. Outpak concrete washout onsite. Approved to start.

Correction request:
- install sediment protection on private storm drain on Edgemoor Lane
- sweep street and request workers not to park on open lots to prevent trackout