ESC13-01279
| General Inspection | 3/15/2018 | 3/15/2018 | 3/20/2018 11:43:52 AM | P | PART |
|
|
No trackout or discharges in subdivision. Storm drains have sediment protection. Concrete washout facility provided for this round of foundations.
Correction request to be completed this week: - pick up trash to the west of project in vegetated and woody natural area between project and old Eckert Road.
RP Kyle said it will be picked up this week. Follow up inspection scheduled.
|
ESC15-01579
| General Inspection | 3/15/2018 | 3/15/2018 | 3/19/2018 4:13:15 PM | P | PEND |
|
|
|
ESC17-00641
| General Inspection | 3/15/2018 | 3/15/2018 | 3/16/2018 3:29:15 PM | | CANC |
|
|
|
ESC17-00559
| Aging Inspection | 3/15/2018 | 3/15/2018 | 3/16/2018 3:28:37 PM | | DONE |
|
|
BLD finaled. Temp BMP and Harris Crossing subdivision clean up ESC13-01279
|
ESC15-00504
| Site Final | 3/9/2018 | 3/15/2018 | 3/16/2018 8:26:03 AM | P | CANC |
|
|
|
ESC17-01346
| Tracking Control | 3/15/2018 | 3/15/2018 | 3/15/2018 2:51:39 PM | P | PEND |
|
|
Site is muddy with unmaintained rock entrance. Sidewalk and left lane of 9th street have trackout
Corrections needed to reduce trackout:
- install new construction rock. 1.5-3" angular or crushed rock -sweep sidewalk and apron on 9th street
RP agreed to clean up today and request more rock.
|
ESC16-01108
| General Inspection | 3/15/2018 | 3/15/2018 | 3/15/2018 2:47:26 PM | | CANC |
|
|
rescheduled
|
ESC17-01754
| General Inspection | 3/15/2018 | 3/15/2018 | 3/15/2018 2:27:51 PM | P | PART |
|
|
Bob ###-####
Road has trackout within first 50 yards from entrance onto Hudson. Rock construction entrance is installed with liner, but round rocks instead of angular are installed. Entrance is compacted with mud. Lots of mud within site with potential to be tracked out.
Storm drains around site have sediment filter bags installed. Permit sign posted.
Small crew onsite installing culvert for irrigation ditch, project near completion. Once complete this entrance will be closed and a new entrance installed for next phase
Correction Request: - improve/maintain construction entrance and extend fencing or alternative to make sure all vehicles pass over the rock. Any new rock add shall be angular rock per ESC plan details for construction entrance.
|
ESC16-00935
| General Inspection | 3/15/2018 | 3/15/2018 | 3/15/2018 12:22:03 PM | P | PEND |
|
|
Site inspection conducted to check up and initiate repair of lined drainage swale. As of 11 15 AM no work had been conducted. Called Roth Homes Cleve, onsite crew member Dave started to work on cleaning out swale, directing water to drain and to vegetated area, pull up lining and remove dirt/mud causing obstruction of flow to drain. Follow up scheduled for tomorrow.
|
ESC14-00206
| General Inspection | 3/15/2018 | 3/15/2018 | 3/15/2018 11:45:16 AM | | CANC |
|
|
|
ESC17-00556
| Aging Inspection | 3/15/2018 | 3/15/2018 | 3/15/2018 8:09:01 AM | | PASS |
|
|
BLD complete, temporary BMP removal for Harris Crossing, final cleanup and stabilization is covered under main site permit, ESC13-01279
|
ESC17-00556
| DOC - Permit Finaled | 3/15/2018 | 3/15/2018 | 3/15/2018 8:08:54 AM | P | PASS |
|
|
|
ESC17-00554
| Aging Inspection | 3/15/2018 | 3/15/2018 | 3/15/2018 8:08:43 AM | | PASS |
|
|
BLD complete, temporary BMP removal for Harris Crossing, final cleanup and stabilization is covered under main site permit, ESC13-01279
|
ESC17-00554
| DOC - Permit Finaled | 3/15/2018 | 3/15/2018 | 3/15/2018 8:08:30 AM | P | PASS |
|
|
BLD complete, temporary BMP removal for Harris Crossing, final cleanup and stabilization is covered under main site permit, ESC13-01279
|
ESC17-00555
| Aging Inspection | 3/15/2018 | 3/15/2018 | 3/15/2018 8:08:18 AM | | PASS |
|
|
BLD complete, temporary BMP removal for Harris Crossing, final cleanup and stabilization is covered under main site permit, ESC13-01279
|
ESC17-00555
| DOC - Permit Finaled | 3/15/2018 | 3/15/2018 | 3/15/2018 8:08:11 AM | P | PASS |
|
|
|
ESC17-00558
| Aging Inspection | 3/15/2018 | 3/15/2018 | 3/15/2018 8:07:58 AM | | PASS |
|
|
BLD complete, temporary BMP removal for Harris Crossing, final cleanup and stabilization is covered under main site permit, ESC13-01279
|
ESC17-00558
| DOC - Permit Finaled | 3/15/2018 | 3/15/2018 | 3/15/2018 8:05:57 AM | P | PASS |
|
|
|