Inspections for the day of: Thursday, March 15, 2018.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-01279 General Inspection3/15/20183/15/20183/20/2018 11:43:52 AMPPART
No trackout or discharges in subdivision. Storm drains have sediment protection. Concrete washout facility provided for this round of foundations.

Correction request to be completed this week:
- pick up trash to the west of project in vegetated and woody natural area between project and old Eckert Road.

RP Kyle said it will be picked up this week. Follow up inspection scheduled.
ESC15-01579 General Inspection3/15/20183/15/20183/19/2018 4:13:15 PMPPEND
ESC17-00641 General Inspection3/15/20183/15/20183/16/2018 3:29:15 PM CANC
ESC17-00559 Aging Inspection3/15/20183/15/20183/16/2018 3:28:37 PM DONE
BLD finaled. Temp BMP and Harris Crossing subdivision clean up ESC13-01279
ESC15-00504 Site Final3/9/20183/15/20183/16/2018 8:26:03 AMPCANC
ESC17-01346 Tracking Control3/15/20183/15/20183/15/2018 2:51:39 PMPPEND
Site is muddy with unmaintained rock entrance. Sidewalk and left lane of 9th street have trackout

Corrections needed to reduce trackout:

- install new construction rock. 1.5-3" angular or crushed rock
-sweep sidewalk and apron on 9th street

RP agreed to clean up today and request more rock.
ESC16-01108 General Inspection3/15/20183/15/20183/15/2018 2:47:26 PM CANC
rescheduled
ESC17-01754 General Inspection3/15/20183/15/20183/15/2018 2:27:51 PMPPART
Bob ###-####



Road has trackout within first 50 yards from entrance onto Hudson. Rock construction entrance is installed with liner, but round rocks instead of angular are installed. Entrance is compacted with mud. Lots of mud within site with potential to be tracked out.


Storm drains around site have sediment filter bags installed. Permit sign posted.



Small crew onsite installing culvert for irrigation ditch, project near completion. Once complete this entrance will be closed and a new entrance installed for next phase

Correction Request:
- improve/maintain construction entrance and extend fencing or alternative to make sure all vehicles pass over the rock. Any new rock add shall be angular rock per ESC plan details for construction entrance.
ESC16-00935 General Inspection3/15/20183/15/20183/15/2018 12:22:03 PMPPEND
Site inspection conducted to check up and initiate repair of lined drainage swale. As of 11 15 AM no work had been conducted. Called Roth Homes Cleve, onsite crew member Dave started to work on cleaning out swale, directing water to drain and to vegetated area, pull up lining and remove dirt/mud causing obstruction of flow to drain. Follow up scheduled for tomorrow.
ESC14-00206 General Inspection3/15/20183/15/20183/15/2018 11:45:16 AM CANC
ESC17-00556 Aging Inspection3/15/20183/15/20183/15/2018 8:09:01 AM PASS
BLD complete, temporary BMP removal for Harris Crossing, final cleanup and stabilization is covered under main site permit, ESC13-01279
ESC17-00556 DOC - Permit Finaled3/15/20183/15/20183/15/2018 8:08:54 AMPPASS
ESC17-00554 Aging Inspection3/15/20183/15/20183/15/2018 8:08:43 AM PASS
BLD complete, temporary BMP removal for Harris Crossing, final cleanup and stabilization is covered under main site permit, ESC13-01279
ESC17-00554 DOC - Permit Finaled3/15/20183/15/20183/15/2018 8:08:30 AMPPASS
BLD complete, temporary BMP removal for Harris Crossing, final cleanup and stabilization is covered under main site permit, ESC13-01279
ESC17-00555 Aging Inspection3/15/20183/15/20183/15/2018 8:08:18 AM PASS
BLD complete, temporary BMP removal for Harris Crossing, final cleanup and stabilization is covered under main site permit, ESC13-01279
ESC17-00555 DOC - Permit Finaled3/15/20183/15/20183/15/2018 8:08:11 AMPPASS
ESC17-00558 Aging Inspection3/15/20183/15/20183/15/2018 8:07:58 AM PASS
BLD complete, temporary BMP removal for Harris Crossing, final cleanup and stabilization is covered under main site permit, ESC13-01279
ESC17-00558 DOC - Permit Finaled3/15/20183/15/20183/15/2018 8:05:57 AMPPASS