PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Friday, March 15, 2019
.
Number of inspections:
17
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC18-01244
General Inspection
3/14/2019
3/15/2019
3/19/2019 9:00:28 PM
P
PEND
Conference to review correction requests from 3/12.
- perimeter sediment controls have been re-installed. Several sections need more backfill and must be staked with pins provided with gatorguard. Reviewed installation with RP.
- trash has been picked up and bin emptied
- request to install energy dissipation where roof runoff is hitting ground. Need to install check dams in channel next driveway that directs roof water to the sidewalk and gutter. Will recommend trying compost or sod.
- reviewed requirement to file eNOI for CGP 2017 coverage
Follow up 3/22
ESC18-00241
Aging Inspection
3/15/2019
3/15/2019
3/19/2019 2:30:18 PM
CANC
ESC18-00322
Aging Inspection
3/15/2019
3/15/2019
3/19/2019 2:23:27 PM
PASS
ESC17-01782
BMP Violation
3/7/2019
3/15/2019
3/19/2019 1:33:58 PM
A
CANC
trash control @ old hickory
ESC17-01782
BMP Violation
3/7/2019
3/15/2019
3/19/2019 1:33:10 PM
A
PART
trash control and dumped materials
Some trash picked up. Concrete washout waste and other debris was cleaned and removed.
Still need to pick up trash in stormwater pond.
Notificiation to Joey to work on better trash control for all DHETH sites, especially on south side of Parkcenter Blvd.
ESC18-00207
Aging Inspection
3/15/2019
3/15/2019
3/18/2019 4:43:51 PM
CANC
ESC18-00206
Aging Inspection
3/15/2019
3/15/2019
3/18/2019 4:43:41 PM
CANC
ESC18-00204
Aging Inspection
3/15/2019
3/15/2019
3/18/2019 4:43:29 PM
CANC
ESC18-01687
General Inspection
3/15/2019
3/15/2019
3/15/2019 4:40:44 PM
P
PASS
Construction entrance installed properly.
Notified project manager about possilbly using compost for erosion control and sediment control berms.
ESC18-00618
General Inspection
3/15/2019
3/15/2019
3/15/2019 4:39:26 PM
CANC
ESC18-01002
Random Inspection
3/15/2019
3/15/2019
3/15/2019 4:35:30 PM
P
FAIL
No construction entrance installed.
Phone call to RP to install next week. Will follow up
ESC18-00079
General Inspection
3/15/2019
3/15/2019
3/15/2019 4:25:14 PM
PASS
ESC18-01636
General Inspection
3/14/2019
3/15/2019
3/15/2019 3:42:04 PM
P
PEND
Water that was flowing through site has now been diverted for bypass around disturbed areas. Dewatering water in channels within site is being land applied to the adjacent pasture.
Follow up next week
Trucking operation upsetting neighbors, request to check that loads are not overfull and route is appropriate.
ESC19-00156
Site Preparation
3/15/2019
3/15/2019
3/15/2019 3:20:55 PM
P
CANC
Jason Phone #: ###-####
rescheduled
ESC18-01739
BMP Violation
3/15/2019
3/15/2019
3/15/2019 3:15:37 PM
P
FAIL
Trackout, trash, incomplete permit sign
Multiple violations.
Warning to Berkely Builders about conditions
Warning to RP Marc via VM that if conditions do not improve parcel holds and fines will be implemented.
ESC18-01469
BMP Violation
3/15/2019
3/15/2019
3/15/2019 3:12:57 PM
P
FAIL
Trash, trackout. No housekeeping.
Warning to RP Marc that parcel holds will be issued if trash pickup and other violations are observed during any inspection.
ESC18-01134
BMP Violation
3/15/2019
3/15/2019
3/15/2019 3:06:28 PM
P
FAIL
2089954637 Jarod Nelson
Trash, trackout, multiple violations