PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Wednesday, March 16, 2016
.
Number of inspections:
9
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC14-01011
General Inspection
3/16/2016
3/16/2016
3/17/2016 12:58:42 PM
PASS
WIP on large foothills mansion. No significant trackout, no discharges. MS4 inlets have sediment filters installed. No disturbance outside of limits of disturbance and surrounding vegetation has been preserved. No corrections at this time.
ESC13-00684
General Inspection
3/16/2016
3/16/2016
3/16/2016 4:21:22 PM
CANC
ESC15-00871
General Inspection
3/16/2016
3/16/2016
3/16/2016 4:00:23 PM
PASS
Permit sign posted. Construction entrance installed. No trackout or discharges. No activity at time of inspection.
ESC15-00509
General Inspection
3/16/2016
3/16/2016
3/16/2016 3:55:38 PM
CANC
ESC15-00857
Site Preparation
3/16/2016
3/16/2016
3/16/2016 2:18:49 PM
A
PASS
SWO correction requests for Eyrie Canyon #9 have been addressed by developer.
Walk through inspection of BMPs required to lift SWO conducted with Connell Development stormwater team.
1. BMPs properly re-installed, including DI sediment filter bags, earthen berm diversions, construction entrance rock stockpile now onsite, temporary retention ponds; lined concrete washout for SFHs in progress in EC phase #7 by Canyon Crest; all installed per current ESC site map of BMPs at EC #9.
2. Sidewalks and gutters are clean with no loose sediment or dirty runoff evident. No trackout onto Arrow Villa from construction area
3. Graded hillsides through out the phase were hydroseeded early March. Extra applications were put on sensitive/steep slopes. The hydroseeding from November 2015 is showing signs of establishing well and stabilizing hillsides.
4. No significant erosion rills or gullies observed due to recent rain events. No BMP failures observed. 5. Revised and updated ESC plan submitted and approved by ESC division.
6.Special Investigation fees paid.
Eyrie Canyon #9
Site now approved for construction activity and proceeding with plans to compete sewer and roads of phase 9. Work is tentatively scheduled to start in mid April.
Note: Connell Development will submit plan for staging lot at Eyrie Way to get an ESC permit for limited construction activity on this parcel, which they own.
ESC14-01063
Site Preparation
3/16/2016
3/16/2016
3/16/2016 2:04:23 PM
A
CANC
SWO correction requests for Eyrie Canyon phase #8 have been addressed by developer.
]
Walk through inspection to lift SWO conducted with Connell Development stormwater team.
1. BMPs re-installed, including DI sediment filter bags, perimter sediment controls installed properly around Goshawk culdesac (wattles & silt fence)
2. Sidewalks and gutters are clean with no loose sediment or dirty runoff evident.
3. Temporary retention ponds and earthen berms have been installed on the lots on north side of Goshawk
4. Graded hilliside between phase 8 & 9 was hydroseeded last November and grass is showing signs of establishing well.
4. No significant erosion rills or gullies observed due to recent rain events. No BMP failures observed.
5.Special Investigation fees paid.
Eyrie Canyon # 8 now approved for construction activity and proceeding with plat process prior to SFH construction.
ESC15-00853
General Inspection
3/16/2016
3/16/2016
3/16/2016 1:48:34 PM
PASS
Retaining wall work and dirt removal/off haul in progress at North Hill sub. Existing pavement/asphalt has been preserved and a rock construction entrance/loading pad has been installed within site. No trackout or polluted runoff observed flowing from site to Hill Road. MS4 on Hill has sediment bags and gravel bag check dams.
Stockpile area at east end of site is contained by straw wattle weighed down by sandbag to trap any loose dirt that makes it to the pavement. No issues observed.
Approved, site is in ESC compliance.
ESC15-00858
Aging Inspection
3/16/2016
3/16/2016
3/16/2016 10:04:06 AM
PASS
WIP. DI filter installed on corner. No significant trackout. No corrections issued.
ESC15-01124
DOC - Permit Finaled
3/16/2016
3/16/2016
3/16/2016 8:35:24 AM
P
PASS