Inspections for the day of: Friday, March 16, 2018.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-00649 General Inspection3/16/20183/16/20183/20/2018 12:06:55 PM FAIL
Correction request:

- sweep culdesac
- repair damaged dumpster on north side of culdesac and pick up any loose trash
ESC16-01561 General Inspection3/16/20183/16/20183/20/2018 10:41:47 AM PART
No trackout or uncontained washouts around site. Storm drains have sediment filter bags installed that have remaining capacity.

No significant amount of trash along Walling Creek, lots of wind blown trash from full dumpsters along Barber Valley Drive.

Corrections request to Brighton Homes trash crew to perfom pick up along sidewalk and road and to have full dumpsters emptied asap.
ESC16-00935 Conference3/14/20183/16/20183/19/2018 8:25:45 AMPDONE
130 PM

Lined drainage trench has been cleaned out and relaid to improve flow to drain and prevent overtopping. Front of site is clean, no trackout and trash container has been emptied.

Corrections requested:
- landscaper foreman/crew to discuss tree replacement and revegetation with downhill neighbor
- install wattle U-hooks/check dams along bottom fence line to slow any water flowing along the fence liner.
- clean up old/unused wattles at discharge point at corner of fence.
- install section of wattle on slope between the drainage trench and bottom corner of lot.
ESC17-00648 General Inspection3/16/20183/16/20183/16/2018 3:29:34 PM CANC
ESC15-01288 General Inspection3/16/20183/16/20183/16/2018 3:29:20 PM CANC
ESC17-00616 Aging Inspection3/16/20183/16/20183/16/2018 3:29:05 PM DONE
BLD finaled. Temp BMP and Harris Crossing subdivision clean up ESC13-01279
ESC17-00616 DOC - Permit Finaled3/16/20183/16/20183/16/2018 3:28:59 PMPPASS
ESC17-00613 Aging Inspection3/16/20183/16/20183/16/2018 3:28:53 PM DONE
BLD finaled. Temp BMP and Harris Crossing subdivision clean up ESC13-01279
ESC17-00613 DOC - Permit Finaled3/16/20183/16/20183/16/2018 3:28:45 PMPPASS
ESC17-00559 DOC - Permit Finaled3/16/20183/16/20183/16/2018 3:28:28 PMPPASS
ESC17-00610 Aging Inspection3/16/20183/16/20183/16/2018 3:26:30 PM DONE
BLD finaled. Temp BMP and Harris Crossing subdivision clean up ESC13-01279
ESC17-00610 DOC - Permit Finaled3/16/20183/16/20183/16/2018 3:19:21 PMPPASS
ESC17-01157 Conference3/15/20183/16/20183/16/2018 8:29:26 AMAPEND
Project is in Boise and Eagle, working out if Boise has jurisdiction over all disturbed areas.

Need to improve sediment protection along Walling Creek and check for 404 permit.
ESC17-01185 BMP Violation3/15/20183/16/20183/15/2018 2:46:53 PMAPEND
RP called to state he will have site cleaned up and permits posted by next Monday AM