PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Thursday, March 17, 2016
.
Number of inspections:
14
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC14-00356
DOC - Permit Finaled
3/17/2016
3/17/2016
3/17/2016 12:49:24 PM
P
PASS
ESC15-00463
General Inspection
3/17/2016
3/17/2016
3/17/2016 12:44:39 PM
PASS
No trackout. No discharges. Trackout from last week was cleaned up and new rock installed on construction entrance. Front slope vegetation was preserved and perimeter wattle installed as well as DI sediment bag. Approved.
ESC15-01210
General Inspection
3/17/2016
3/17/2016
3/17/2016 12:40:36 PM
P
PASS
Re-inspection to lift SWO and check for corrections issued 3/14
Gutters and storm drain inlets were cleaned out and sediment filters re-installed as requested.
Additional sediment control wattles and check dams were installed at bottom of site to filter runoff.
Graded area that was added to permit has had slope stabilization and sediment control wattles installed. RP stated that disturbed slopes no longer with work remaining are to be hydroseeded this April.
SWO lifted, remaining corrections include:
- pay re-inspection fee
- install new temporary retention pond somewhere in middle of the project to capture and slow down runoff from the upper end of project so that there is not some much runoff exitting site at bottom all at once.
Pat stated he will make these corrections asap.
Approved for construction to resume. GRD and ESC permit now in compliance with submitted plans.
ESC15-00177
DOC - Permit Finaled
3/17/2016
3/17/2016
3/17/2016 12:34:04 PM
P
PASS
ESC12-01066
General Inspection
3/17/2016
3/17/2016
3/17/2016 12:19:42 PM
PASS
No futher ESC inspections. DI bag on private drain to be removed by 951 property manager. DI on Front is utilized for the bridge staging yard and can be removed at later date. Has a lot of capactity. No futher inspections on this permit.
ESC12-01066
DOC - Permit Finaled
3/17/2016
3/17/2016
3/17/2016 12:13:22 PM
P
PASS
ESC15-01058
Aging Inspection
3/17/2016
3/17/2016
3/17/2016 11:22:14 AM
PASS
WIP. Subdivsion BMPs installed. No trackout or discharges. No corrections.
ESC15-01056
Aging Inspection
3/17/2016
3/17/2016
3/17/2016 11:22:02 AM
PASS
WIP. Subdivsion BMPs installed. No trackout or discharges. No corrections.
ESC15-01062
Aging Inspection
3/17/2016
3/17/2016
3/17/2016 11:01:59 AM
PASS
Home construction complete and sale pending. BLD finaled. ACtive homes in progress all around house with same builder with ESC permits. Subdivsion BMPs installed.
Yard to be landscaped by homeowner. No further ESC inspections on this permit.
ESC15-01062
DOC - Permit Finaled
3/17/2016
3/17/2016
3/17/2016 11:00:30 AM
P
PASS
ESC15-01291
Site Final
3/16/2016
3/17/2016
3/17/2016 10:59:22 AM
A
PASS
Victor Phone #: ###-####
Paving work is complete. Minor landscaping and irrigation occuring within site. No temp BMPs installed. NO further ESC inspections required.
ESC15-01291
DOC - Permit Finaled
3/17/2016
3/17/2016
3/17/2016 10:57:18 AM
P
PASS
ESC15-00033
BMP Violation
3/16/2016
3/17/2016
3/17/2016 9:33:26 AM
P
PEND
Verbal CN to install check dam filter bags to the east of the access point to the Honda parking lot that is being finished. This will be okay instead of installing DI bag on inlet on Auto Drive that is 1/4 mile from site.
Need to sweep up track out to Gratz.
24 HR compliance time. RP Tony said it will be done ###-####
ESC16-00323
Site Preparation
3/17/2016
3/17/2016
3/17/2016 9:23:21 AM
P
PASS
Please call Jill prior to going out. Phone #: ###-####
Demolition within industrial/commercial staging yard. No MS4 in area.