Inspections for the day of: Wednesday, March 18, 2015.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-00846 General Inspection3/18/20153/18/20153/18/2015 4:46:03 PM PASS
ESC13-00592 General Inspection3/17/20153/18/20153/18/2015 3:54:54 PMAPEND
No issues at site, need to remove or repair damaged silt fence areas to be used by future development...
ESC14-00788 Aging Inspection3/18/20153/18/20153/18/2015 3:53:45 PM CANC
rescheduled for full site walkthrough
ESC14-00888 Site Preparation3/18/20153/18/20153/18/2015 3:20:41 PMPNR
No grading or excavation has commenced for new alumni center. Old building already demolished and materials removed.

Only MS4 is on University and Denver and appearss to be clogged (full of water). May need to consider alternative sediment control.

No site prep requested, checking to see work hadn't already started without inpsection.
ESC14-00549 General Inspection3/18/20153/18/20153/18/2015 2:55:07 PM PASS
Permit finaled.
ESC14-00549 DOC - Permit Finaled3/18/20153/18/20153/18/2015 2:53:13 PMPPASS
Yard graded/prepped for landscaping to be completed by homeowner. Temp BMPs utilized for project do not need to be removed due to ongoing work at Somerset Village. No further inspections required for this permit. No issues or sediment runoff.
ESC14-00635 Aging Inspection3/18/20153/18/20153/18/2015 2:44:37 PM PASS
Duplex is near completion. No further earthwork and no loose sediment. Will need to conduct final site cleanup and removal of construction materials.
ESC14-00859 General Inspection3/18/20153/18/20153/18/2015 2:37:23 PM PASS
WIP on basement vault project addition on St. Lukes/ MSTI. Permit is posted, receiving MS4 drop inlet has sediment protection, concrete washout bin service is being utilized, and work area surrounded by security fence. No trackout or discharges from site. No corrections necessary. Other phases of project covered by ESC14-01105-06
ESC14-00952 Aging Inspection3/18/20153/18/20153/18/2015 2:08:54 PM PASS
ESC14-00529 General Inspection3/18/20153/18/20153/18/2015 1:51:22 PM PASS
Project Beverly landscaping and stabilization is in progress. All vertical construction is complete on building #2 and the open faced storage shed. Some work and TI in building #1 is ongoing.

Onsite stormwater DIs and MS4 on Beverly have sediment protection. Irrigation is still not flowing. After landscaping parking lots will be swept and temp BMPs may be removed. Clear to remove rear silt fence.

No trackout or illicit discharges observed.No corrections at this time; check for temp BMP removal on next inspection.
ESC14-00528 General Inspection3/18/20153/18/20153/18/2015 1:44:24 PM PASS
Building #2 at Beverly project is complete. All permits finaled. No further inspections on this permit. Remaining work on building #1 and area landscaping is covered under ESC14-00529
ESC14-00528 DOC - Permit Finaled3/18/20153/18/20153/18/2015 1:43:05 PMPPASS
ESC14-00845 General Inspection3/18/20153/18/20153/18/2015 1:26:23 PM PASS
Carport complete and surrounding area is landscaped. Construction materials and most loose sediment has been swept. Additional sweeping will occur this week or next for final striping. Permit finaled.
ESC14-00845 DOC - Permit Finaled3/18/20153/18/20153/18/2015 1:24:59 PMPPASS