ESC15-00857
| General Inspection | 2/27/2017 | 3/2/2017 | 3/6/2017 2:44:19 PM | P | CANC |
|
|
rescheduled 3/7
|
ESC14-01063
| General Inspection | 3/2/2017 | 3/2/2017 | 3/6/2017 2:44:08 PM | | CANC |
|
|
rescheduled 3/7
|
ESC16-00561
| General Inspection | 3/2/2017 | 3/2/2017 | 3/6/2017 1:23:43 PM | | PASS |
|
|
No trackout or loose materials leaving site. Trash contained Discussed rear silt fence installation with RP-GC. Grass starting to row. Will check on conditions next inspection. No corrections at this time.
|
ESC16-00713
| General Inspection | 3/2/2017 | 3/2/2017 | 3/6/2017 1:16:11 PM | | PASS |
|
|
|
ESC16-00808
| General Inspection | 3/2/2017 | 3/2/2017 | 3/6/2017 1:15:54 PM | | PEND |
|
|
revegetation monitoring. May need to apply hydroseed to disturbed area used to access rear yard and retaining wall. No sediment runoff or discharges.
|
ESC16-00209
| Tracking Control | 2/28/2017 | 3/2/2017 | 3/6/2017 11:31:20 AM | A | FAIL |
|
|
see if trackout in alley has been cleaned....
Trackout observed last week in alley from site to 15th was not swept.
Site inlet protection is installed and in good condition. WIP by crew collectiong loose trash, supervisor reported new dumpsters are being delivered today.
Correction request to new site superindendent: - sweep up dried tracking in alley and parking lot west of building used for unloading - provide improved construction entrance/tracking pad in and out of site. More rock needed.
|
ESC15-00541
| General Inspection | 3/2/2017 | 3/2/2017 | 3/3/2017 1:38:16 PM | | CANC |
|
|
|
ESC16-00938
| General Inspection | 3/2/2017 | 3/2/2017 | 3/2/2017 4:37:13 PM | | PEND |
|
|
revegetation of access road to backyard not yet complete...
|
ESC16-01612
| Site Preparation | 3/2/2017 | 3/2/2017 | 3/2/2017 1:58:31 PM | P | PASS |
|
|
Call hour to meet // Jill Phone #: ###-####
Perimeter BMPs installed (inlet protection, wattles on west end of project. Plan is to preserve existing parking lot surface and curbing for stabilized construction access on south end of project. Permit sign and CGP NOI posted.
Notified project managers about trackout, dewatering, and fugitive dust regulations.
Approved to start.
|
ESC16-01451
| General Inspection | 3/2/2017 | 3/2/2017 | 3/2/2017 11:50:23 AM | P | FAIL |
|
|
Need to clean up concrete washout pit on Bagley and provide new washout facility.
Verbal correction to Matt w/ Dave Evans Construction
|
ESC16-00753
| Aging Inspection | 3/2/2017 | 3/2/2017 | 3/2/2017 11:40:14 AM | | PASS |
|
|
Home complete, landscaped and occupied. No corrections for this site. BLD finaled.
|
ESC16-00753
| DOC - Permit Finaled | 3/2/2017 | 3/2/2017 | 3/2/2017 11:39:38 AM | P | PASS |
|
|
|
ESC16-01522
| General Inspection | 3/2/2017 | 3/2/2017 | 3/2/2017 11:32:11 AM | A | FAIL |
|
|
Excessive dirt and loose sediment on street. No perimeter sediment controls or regular sweeping occuring. RP listed is for Wood Brothers excavation and is no longer on site. Working with Mandi @ Wood Bros. ###-#### and builder EEC Mike Kaufman ###-####
|
ESC16-01520
| General Inspection | 3/2/2017 | 3/2/2017 | 3/2/2017 11:32:10 AM | A | FAIL |
|
|
Excessive dirt and loose sediment on street. No perimeter sediment controls or regular sweeping occuring. RP listed is for Wood Brothers excavation and is no longer on site. Working with Mandi @ Wood Bros. ###-#### and builder EEC Mike Kaufman ###-####
|
ESC16-00936
| General Inspection | 3/2/2017 | 3/2/2017 | 3/2/2017 8:00:48 AM | | CANC |
|
|
rescheduled; inspection conducted at adjacent site 3/1 with no violations observed
|