PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Monday, March 2, 2020
.
Number of inspections:
15
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC19-01710
Site Preparation
2/28/2020
3/2/2020
3/3/2020 9:57:40 AM
A
PASS
Site meeting with RP Randy and project superintendant Seth.
-ESC permit sign posted
-SWPPP binder onsite
-Silt fence properly installed along north border to protect Fivemile Creek
-Will have water truck onsite for dust control
-Will use an above ground pan service for concrete washout
-Will have dumpster for trash containment
Grading has already started as well as canal infrastructure work around the perimter.
No trackout or fugitive dust occuring
Correction requests:
- update SWPPP binder with inspection reports
- install full size construction entrance
- clean up debris pile and dried concrete washout dumps
- prevent dumping with gate or no trespassig sign
Follow up inspection scheduledm 3/11
ESC19-00402
General Inspection
3/2/2020
3/2/2020
3/2/2020 3:47:31 PM
PASS
Near completion. Used concrete washout for driveway. Needs landscaping. BLD open.
No corrections requested.
ESC18-00809
Aging Inspection
3/2/2020
3/2/2020
3/2/2020 3:41:15 PM
CANC
ESC16-01457
General Inspection
3/2/2020
3/2/2020
3/2/2020 3:14:44 PM
PASS
ESC19-00292
General Inspection
3/2/2020
3/2/2020
3/2/2020 12:52:57 PM
P
PASS
No trackout. Myrtle and 2nd street staging lanes are clean and regularly swept.. Recieving storm drains have sediment protection.
No ESC requests at this time.
No ESC requests at this time.
ESC19-01058
Site Preparation
2/28/2020
3/2/2020
3/2/2020 12:44:14 PM
A
PASS
11 AM
Onsite meeting with site stormwater team. ESC permit posted, RP designated. Review ESC site plan. Site is approved for construction.
Correction request/action items to check for next inspection:
- install sediment protection on storm drain inlet west of site on Front Street
- keep 6th street staging area and pavement clean, add additional surface level storm drain protection to reduce maintenance of DI bag and add additional protection. Sugged bloksom fiber mat or sandbag/weighted wattle
- have spill kit on site ASAP
- designate location of ecopans for washout away from storm drain on level area
- post additional ESC sign next to SWPPP box
- relocate portapots > 50 ft from storm drain.
- prevent wind blown trash from site
ESC16-01472
Site Final
3/2/2020
3/2/2020
3/2/2020 12:35:20 PM
P
DONE
Site stormwater, landscaping, and construction of home on city parcel are complete. BLD permit has been finaled with conditions of the hillside drainage/stabilization bond satisfied PW.
ESC Responsible Person/GC will notify homeowner requirement to remove all temporary BMPs installed offsite (in Logan alley).this includes black silt fence and gator guard wattle. If the homeowner and neighbors choose to leave them through Spring, that is at their discretion. No further requests or ESC inspections
*BMPs installed for the Logan alley sewer project (orange/wire back silt fence and straw wattle) should remain unltil alley issues are resolved by ACHD and Boise Public Works, which have been notified. ESC division does not have authority of the Logan alley ROW..
ESC16-01472
DOC - Permit Finaled
3/2/2020
3/2/2020
3/2/2020 12:27:15 PM
P
PASS
ESC16-01457
DOC - Permit Finaled
3/2/2020
3/2/2020
3/2/2020 12:20:32 PM
P
PASS
(This activity was added in error so we have changed the case status back to Issued.)
ESC16-01457
Site Final
3/2/2020
3/2/2020
3/2/2020 12:20:04 PM
P
CANC
ESC19-00567
Site Final
3/2/2020
3/2/2020
3/2/2020 9:55:22 AM
P
PASS
Parking lot complete and landscaped. No temporary BMPs left on or around site. All permits finaled.
ESC19-00557
General Inspection
3/2/2020
3/2/2020
3/2/2020 9:47:54 AM
PASS
ESC39-00001
Aging Inspection
3/2/2020
3/2/2020
3/2/2020 8:14:21 AM
CANC
test case
ESC19-00524
General Inspection
3/2/2020
3/2/2020
3/2/2020 8:12:43 AM
CANC
see ESC19-00542
ESC19-00525
General Inspection
3/2/2020
3/2/2020
3/2/2020 8:12:25 AM
CANC
see ESC19-00542