ESC17-00904
| General Inspection | 3/20/2018 | 3/20/2018 | 3/23/2018 10:18:11 AM | P | PEND |
|
|
WIP on corrections. RP/GC to pay re-inspection fee and schedule compliance inspection Monday AM.
|
ESC17-00102
| General Inspection | 3/20/2018 | 3/20/2018 | 3/23/2018 10:18:00 AM | P | PEND |
|
|
WIP on corrections. RP/GC to pay re-inspection fee and schedule compliance inspection Monday AM.
|
ESC16-01108
| General Inspection | 3/15/2018 | 3/20/2018 | 3/23/2018 8:04:23 AM | P | CANC |
|
|
|
ESC17-00102
| Stop Work Order | 3/20/2018 | 3/20/2018 | 3/20/2018 4:53:05 PM | P | DONE |
|
|
Parcel hold/Stop Work Order for all City Inspection requests at Cimarron Apartments until site can show compliance with ESC permit conditions Violations include: .
- trackout to Bird and all along sidewalk and gutter - inside of site extremely dirty - need to remove all stockpiles off hard surfaces, store in area with perimeter sediement control
- pick up all loose trash, cover trash containers when not in use
|
ESC17-00904
| Stop Work Order | 3/20/2018 | 3/20/2018 | 3/20/2018 4:52:54 PM | P | DONE |
|
|
Parcel hold/Stop Work Order for all City Inspection requests at Cimarron Apartments until site can show compliance with ESC permit conditions Violations include: .
- trackout to Bird and all along sidewalk and gutter - inside of site extremely dirty - need to remove all stockpiles off hard surfaces, store in area with perimeter sediement control
- pick up all loose trash, cover trash containers when not in use
|
ESC17-01157
| General Inspection | 3/16/2018 | 3/20/2018 | 3/20/2018 3:24:07 PM | A | PEND |
|
|
CGP tracking # IDR1000CG
pete.wilson@idahomaterials.com
|
ESC17-00018
| General Inspection | 3/20/2018 | 3/20/2018 | 3/20/2018 1:17:02 PM | | PEND |
|
|
Subdivision streets are free of significant trackout. Most inlets have sediment filter bags installed.
Corrections requested: - Clint w/ BlackRock, pick up trash on east side of Eckert blown over from projects - Kyle w/ Hunter, relocate concrete washout bin away from storm drain, or install protection or barrier to prevent washout entering storm drain.
|
ESC18-00241
| General Inspection | 3/20/2018 | 3/20/2018 | 3/20/2018 1:10:39 PM | P | PART |
|
|
Subdivision BMPs installed. No muddy runoff or trackout outside of subdivision.
Correction: - trash pick up needed in stormwater retention area and on south side of Warm Springs
|
ESC15-00976
| General Inspection | 3/20/2018 | 3/20/2018 | 3/20/2018 1:03:58 PM | | PASS |
|
|
WIP on east townhomes. No trackout, no discharges. Trash contained, clean site.
|
ESC15-00306
| Complaint Inspection | 3/20/2018 | 3/20/2018 | 3/20/2018 1:03:15 PM | P | DONE |
|
|
complaint about track out from Whitewater Park/Esther Simplot Park
ACHD cleaning up pond. Will be responsible for any trackout. Only minor trackout observed.
|
ESC17-00249
| General Inspection | 3/20/2018 | 3/20/2018 | 3/20/2018 1:02:30 PM | | PASS |
|
|
No trackout onto Warm Springs. Trash picked up around site. Common driveway not yet paved, no landscaping. Will continue to monitor. Request to check for trash blown down road next inspection and before site final.
|
ESC16-01650
| General Inspection | 3/20/2018 | 3/20/2018 | 3/20/2018 12:51:45 PM | P | PASS |
|
|
Inlets protected, lined concrete washout for BlackRock HOmes is in place. Perimeter is protected by permanent fence, wattles and earthen berm to contain stormwater on site.
|
ESC14-00657
| Site Final | 3/20/2018 | 3/20/2018 | 3/20/2018 12:00:11 PM | P | PASS |
|
|
All parcels complete and stabilized. Temporary storm drain sediment protection has been removed from all inlets in River Heights phase 6. ESC permit conditions satisfied.
|
ESC15-01579
| General Inspection | 3/19/2018 | 3/20/2018 | 3/20/2018 11:27:05 AM | A | PART |
|
|
Corrections have been made at site to address trash and material containment issues.
-Dumpster now has tarp to cover during nights and weekends when site is inactive. - Straw wattles have been installed around perimeter that is disturbed and in process of being landscaped.
Correction request: - pick up staging area below south building around muddy tracks and stockpile.
|
ESC17-01491
| General Inspection | 3/20/2018 | 3/20/2018 | 3/20/2018 10:54:20 AM | P | PASS |
|
|
WIP on bridge deck. No trackout to Warm Springs bypass or BV Drive. Staging area is clean, no spills , loose trash, or mud. Dewatering water is clear passing out of settling chamber.
RP stated that within in the next few weeks disturbed areas within creek area will be seeded with an approved wetland plant & seed mix (per Parks and Rec)
|
ESC14-01083
| General Inspection | 3/20/2018 | 3/20/2018 | 3/20/2018 10:51:04 AM | P | FAIL |
|
|
Significant amount trash along Barber Valley drive and open stockpile staging area to the west of the active phase.
Correction request to Braxton to have trash crew do a thourough pick up around the stockpiles, road/sidewalk, and drainage swale bordering the site.
|
ESC17-01362
| General Inspection | 3/20/2018 | 3/20/2018 | 3/20/2018 10:49:04 AM | P | PASS |
|
|
Construction entrances are lined and are preventing trackout at both locations. Perimeter wattles are installed as well as chain link fence to control area of disturbance.
No loose trash within site, some trash around perimeter, most likely from adjacent condo projects. Request to do permiter trash pick up once per week.
Pollution prevention BMPs are implemented at site including: - signage prohibiting track out - covered material storage container - secondary containment area for temporary storage of oils and other chemicals needed during the day - spill kit with signage - large dumpster emptied weekly to prevent overfilling - SWPPP and ESC permit sign posted at entrance
No dewatering has occured yet, RP states that dewatering plan will be submitted prior to the sewer work that is required on the west side of site.
|
ESC17-01018
| General Inspection | 3/20/2018 | 3/20/2018 | 3/20/2018 10:42:57 AM | P | PART |
|
|
No trackout or uncontained washouts around site. Storm drains have sediment filter bags installed that have remaining capacity.
No significant amount of trash along Walling Creek, lots of wind blown trash from full dumpsters along Barber Valley Drive.
Corrections request to Brighton Homes trash crew to perfom pick up along sidewalk and road and to have full dumpsters emptied asap.
|
ESC17-00011
| General Inspection | 3/20/2018 | 3/20/2018 | 3/20/2018 8:15:20 AM | P | CANC |
|
|
data entry error
|
ESC17-00377
| Aging Inspection | 3/20/2018 | 3/20/2018 | 3/20/2018 7:58:24 AM | | CANC |
|
|
|
ESC17-00661
| General Inspection | 3/20/2018 | 3/20/2018 | 3/20/2018 7:57:30 AM | | PASS |
|
|
Work complete, BLD finaled. Project located within secure IPC staging and equipment yard. ESC permit closed
|
ESC17-00661
| DOC - Permit Finaled | 3/20/2018 | 3/20/2018 | 3/20/2018 7:57:29 AM | P | PASS |
|
|
|