Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-00904 General Inspection3/20/20183/20/20183/23/2018 10:18:11 AMPPEND
WIP on corrections. RP/GC to pay re-inspection fee and schedule compliance inspection Monday AM.
ESC17-00102 General Inspection3/20/20183/20/20183/23/2018 10:18:00 AMPPEND
WIP on corrections. RP/GC to pay re-inspection fee and schedule compliance inspection Monday AM.
ESC16-01108 General Inspection3/15/20183/20/20183/23/2018 8:04:23 AMPCANC
ESC17-00102 Stop Work Order3/20/20183/20/20183/20/2018 4:53:05 PMPDONE
Parcel hold/Stop Work Order for all City Inspection requests at Cimarron Apartments until site can show compliance with ESC permit conditions
Violations include:
.

- trackout to Bird and all along sidewalk and gutter
- inside of site extremely dirty
- need to remove all stockpiles off hard surfaces, store in area with perimeter sediement control


- pick up all loose trash, cover trash containers when not in use
ESC17-00904 Stop Work Order3/20/20183/20/20183/20/2018 4:52:54 PMPDONE
Parcel hold/Stop Work Order for all City Inspection requests at Cimarron Apartments until site can show compliance with ESC permit conditions
Violations include:
.

- trackout to Bird and all along sidewalk and gutter
- inside of site extremely dirty
- need to remove all stockpiles off hard surfaces, store in area with perimeter sediement control


- pick up all loose trash, cover trash containers when not in use
ESC17-01157 General Inspection3/16/20183/20/20183/20/2018 3:24:07 PMAPEND
CGP tracking # IDR1000CG

pete.wilson@idahomaterials.com
ESC17-00018 General Inspection3/20/20183/20/20183/20/2018 1:17:02 PM PEND
Subdivision streets are free of significant trackout. Most inlets have sediment filter bags installed.

Corrections requested:
- Clint w/ BlackRock, pick up trash on east side of Eckert blown over from projects
- Kyle w/ Hunter, relocate concrete washout bin away from storm drain, or install protection or barrier to prevent washout entering storm drain.
ESC18-00241 General Inspection3/20/20183/20/20183/20/2018 1:10:39 PMPPART
Subdivision BMPs installed. No muddy runoff or trackout outside of subdivision.

Correction:
- trash pick up needed in stormwater retention area and on south side of Warm Springs
ESC15-00976 General Inspection3/20/20183/20/20183/20/2018 1:03:58 PM PASS
WIP on east townhomes. No trackout, no discharges. Trash contained, clean site.
ESC15-00306 Complaint Inspection3/20/20183/20/20183/20/2018 1:03:15 PMPDONE
complaint about track out from Whitewater Park/Esther Simplot Park

ACHD cleaning up pond. Will be responsible for any trackout. Only minor trackout observed.
ESC17-00249 General Inspection3/20/20183/20/20183/20/2018 1:02:30 PM PASS
No trackout onto Warm Springs. Trash picked up around site. Common driveway not yet paved, no landscaping. Will continue to monitor. Request to check for trash blown down road next inspection and before site final.
ESC16-01650 General Inspection3/20/20183/20/20183/20/2018 12:51:45 PMPPASS
Inlets protected, lined concrete washout for BlackRock HOmes is in place. Perimeter is protected by permanent fence, wattles and earthen berm to contain stormwater on site.
ESC14-00657 Site Final3/20/20183/20/20183/20/2018 12:00:11 PMPPASS
All parcels complete and stabilized. Temporary storm drain sediment protection has been removed from all inlets in River Heights phase 6. ESC permit conditions satisfied.
ESC15-01579 General Inspection3/19/20183/20/20183/20/2018 11:27:05 AMAPART
Corrections have been made at site to address trash and material containment issues.

-Dumpster now has tarp to cover during nights and weekends when site is inactive.
- Straw wattles have been installed around perimeter that is disturbed and in process of being landscaped.

Correction request:
- pick up staging area below south building around muddy tracks and stockpile.

ESC17-01491 General Inspection3/20/20183/20/20183/20/2018 10:54:20 AMPPASS
WIP on bridge deck. No trackout to Warm Springs bypass or BV Drive. Staging area is clean, no spills , loose trash, or mud. Dewatering water is clear passing out of settling chamber.

RP stated that within in the next few weeks disturbed areas within creek area will be seeded with an approved wetland plant & seed mix (per Parks and Rec)
ESC14-01083 General Inspection3/20/20183/20/20183/20/2018 10:51:04 AMPFAIL
Significant amount trash along Barber Valley drive and open stockpile staging area to the west of the active phase.

Correction request to Braxton to have trash crew do a thourough pick up around the stockpiles, road/sidewalk, and drainage swale bordering the site.
ESC17-01362 General Inspection3/20/20183/20/20183/20/2018 10:49:04 AMPPASS
Construction entrances are lined and are preventing trackout at both locations. Perimeter wattles are installed as well as chain link fence to control area of disturbance.

No loose trash within site, some trash around perimeter, most likely from adjacent condo projects. Request to do permiter trash pick up once per week.

Pollution prevention BMPs are implemented at site including:
- signage prohibiting track out
- covered material storage container
- secondary containment area for temporary storage of oils and other chemicals needed during the day
- spill kit with signage
- large dumpster emptied weekly to prevent overfilling
- SWPPP and ESC permit sign posted at entrance


No dewatering has occured yet, RP states that dewatering plan will be submitted prior to the sewer work that is required on the west side of site.
ESC17-01018 General Inspection3/20/20183/20/20183/20/2018 10:42:57 AMPPART
No trackout or uncontained washouts around site. Storm drains have sediment filter bags installed that have remaining capacity.

No significant amount of trash along Walling Creek, lots of wind blown trash from full dumpsters along Barber Valley Drive.

Corrections request to Brighton Homes trash crew to perfom pick up along sidewalk and road and to have full dumpsters emptied asap.
ESC17-00011 General Inspection3/20/20183/20/20183/20/2018 8:15:20 AMPCANC
data entry error
ESC17-00377 Aging Inspection3/20/20183/20/20183/20/2018 7:58:24 AM CANC
ESC17-00661 General Inspection3/20/20183/20/20183/20/2018 7:57:30 AM PASS
Work complete, BLD finaled. Project located within secure IPC staging and equipment yard. ESC permit closed
ESC17-00661 DOC - Permit Finaled3/20/20183/20/20183/20/2018 7:57:29 AMPPASS