Inspections for the day of: Monday, March 25, 2019.
Number of inspections: 7
Percentage of inspections complete: 86 %
Percentage of inspections not complete: 14 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-01525 Complaint Inspection3/18/20193/18/2019 P 
ESC16-01650 General Inspection3/20/20193/25/20193/28/2019 3:48:24 PMPPASS
WIP on framing last round of homes on northwest end of street.

Concrete washout pit has been removed. Will check on rear slope vegetation next inspeciton.
ESC17-01687 General Inspection3/20/20193/25/20193/27/2019 3:14:02 PMPPASS
follow up inspection to requests on 3/20

Trash and debris along Ash Street picked up. No trackout to River. Approved.
ESC18-00652 General Inspection3/25/20193/25/20193/26/2019 4:17:24 PM PART
No trackout or disharges.

Correction request to pick up trash and order trash haul off sent to RP Andy via phone. Follow up scheduled for Friday.
ESC18-00509 Site Final3/22/20193/25/20193/26/2019 4:12:55 PMPPASS
Project complete. No ESC issues or requests.
ESC17-00018 General Inspection3/25/20193/25/20193/26/2019 2:28:37 PM PASS
Subdivsion storm drains have sediment protection installed, streets and gutters are clean. SFHs permitted seperately. Most remaining construction is along Rivernest by Blackrock Homes.
ESC18-01515 Conference3/25/20193/25/20193/25/2019 4:07:39 PMPDONE
Onsite meeting with RP/GC Vince.

Sidewalk and gutter was swept, filter fabric install in storm drain, and trash picked up.

Still alot of loose dirt on sidewalk and street.

Correction request to have street sweeper sweep guttters and re-sweep sidewalk.