ESC18-01525
| Complaint Inspection | 3/18/2019 | 3/18/2019 | | P | |
|
|
|
ESC16-01650
| General Inspection | 3/20/2019 | 3/25/2019 | 3/28/2019 3:48:24 PM | P | PASS |
|
|
WIP on framing last round of homes on northwest end of street.
Concrete washout pit has been removed. Will check on rear slope vegetation next inspeciton.
|
ESC17-01687
| General Inspection | 3/20/2019 | 3/25/2019 | 3/27/2019 3:14:02 PM | P | PASS |
|
|
follow up inspection to requests on 3/20
Trash and debris along Ash Street picked up. No trackout to River. Approved.
|
ESC18-00652
| General Inspection | 3/25/2019 | 3/25/2019 | 3/26/2019 4:17:24 PM | | PART |
|
|
No trackout or disharges.
Correction request to pick up trash and order trash haul off sent to RP Andy via phone. Follow up scheduled for Friday.
|
ESC18-00509
| Site Final | 3/22/2019 | 3/25/2019 | 3/26/2019 4:12:55 PM | P | PASS |
|
|
Project complete. No ESC issues or requests.
|
ESC17-00018
| General Inspection | 3/25/2019 | 3/25/2019 | 3/26/2019 2:28:37 PM | | PASS |
|
|
Subdivsion storm drains have sediment protection installed, streets and gutters are clean. SFHs permitted seperately. Most remaining construction is along Rivernest by Blackrock Homes.
|
ESC18-01515
| Conference | 3/25/2019 | 3/25/2019 | 3/25/2019 4:07:39 PM | P | DONE |
|
|
Onsite meeting with RP/GC Vince.
Sidewalk and gutter was swept, filter fabric install in storm drain, and trash picked up.
Still alot of loose dirt on sidewalk and street.
Correction request to have street sweeper sweep guttters and re-sweep sidewalk.
|