ESC18-01432
| General Inspection | 3/26/2019 | 3/26/2019 | 4/1/2019 12:51:43 PM | P | PASS |
|
|
|
ESC19-00133
| BMP Violation | 3/21/2019 | 3/26/2019 | 3/28/2019 5:18:07 PM | P | PASS |
|
|
Site cleaned up.
|
ESC18-01515
| BMP Violation | 3/18/2019 | 3/26/2019 | 3/28/2019 5:14:54 PM | A | PASS |
|
|
Streets and sidewalks were swept. Inlet fabic installed on Hilton and trash has been picked up around sites.
Site is still on warning for more frequent housekeeping.
|
MIS19-00074
| ESC-Conference | 3/20/2019 | 3/26/2019 | 3/28/2019 5:13:29 PM | A | FAIL |
|
|
NO trash or demolition debris picked up as requested.
|
ESC18-01197
| BMP Violation | 3/21/2019 | 3/26/2019 | 3/28/2019 5:10:40 PM | A | FAIL |
|
|
follow up
No trash and demolition debris picked up.
|
ESC18-01228
| General Inspection | 3/21/2019 | 3/26/2019 | 3/28/2019 4:35:59 PM | P | PASS |
|
|
follow up
Trash picked up. Erosion issue not yet addressed. No new corrections.
|
ESC17-00954
| General Inspection | 3/26/2019 | 3/26/2019 | 3/28/2019 3:56:05 PM | P | PEND |
|
|
Corrections and report detailing corrective actions received. Inspection of subdivsion during rain event showed that changes were effective.
Full walk through inspeciton scheduled.
|
ESC18-01244
| Complaint Inspection | 3/26/2019 | 3/26/2019 | 3/28/2019 3:54:21 PM | P | FAIL |
|
|
Roof top runoff causing onsite erosion and offsite sediment runoff to street and gutter.
RP-GC needs to correct and schedule conference.
|
ESC18-00243
| Aging Inspection | 3/26/2019 | 3/26/2019 | 3/28/2019 3:50:38 PM | | PASS |
|
|
|
ESC18-00242
| Aging Inspection | 3/26/2019 | 3/26/2019 | 3/28/2019 3:49:47 PM | | PASS |
|
|
|
ESC18-00239
| Aging Inspection | 3/26/2019 | 3/26/2019 | 3/28/2019 3:49:36 PM | | PASS |
|
|
WIP. Trash contained. No trackout.
|
ESC16-00242
| General Inspection | 3/26/2019 | 3/26/2019 | 3/28/2019 8:20:25 AM | | CANC |
|
|
|
ESC17-01755
| General Inspection | 3/26/2019 | 3/26/2019 | 3/26/2019 10:43:11 PM | | CANC |
|
|
see ESC17-01754
|
ESC17-01200
| General Inspection | 3/26/2019 | 3/26/2019 | 3/26/2019 10:41:46 PM | | CANC |
|
|
|
ESC18-01179
| Site Final | 3/26/2019 | 3/26/2019 | 3/26/2019 4:06:58 PM | P | PASS |
|
|
Home complete and landscaped. Subdivisoin BMPs to remain installed. ESC permit finaled.
|
ESC18-00709
| Site Final | 3/26/2019 | 3/26/2019 | 3/26/2019 3:48:06 PM | P | PASS |
|
|
Home complete and landscaped. Subdivisoin BMPs to remain installed. ESC permit finaled.
|
ESC18-00649
| Site Final | 3/25/2019 | 3/26/2019 | 3/26/2019 3:45:43 PM | P | PASS |
|
|
Home complete and landscaped. Subdivsion BMPs to remain installed.
|
ESC18-00296
| Site Final | 3/26/2019 | 3/26/2019 | 3/26/2019 2:50:32 PM | P | PASS |
|
|
Home complete and landscaped. Subdivisoin DI bags to be removed once construction on Rivernest in Barber Junction is complete.
|
ESC18-00207
| Site Final | 3/26/2019 | 3/26/2019 | 3/26/2019 2:50:20 PM | P | PASS |
|
|
Home complete and landscaped. Subdivisoin DI bags to be removed once construction on Rivernest in Barber Junction is complete.
|
ESC18-00206
| Site Final | 3/26/2019 | 3/26/2019 | 3/26/2019 2:50:07 PM | P | PASS |
|
|
Home complete and landscaped. Subdivisoin DI bags to be removed once construction on Rivernest in Barber Junction is complete.
|
ESC18-01597
| General Inspection | 3/19/2019 | 3/26/2019 | 3/26/2019 2:20:37 PM | P | PEND |
|
|
follow up
corrections not completed. No new issues. Subdvision landscaping using stockpile and causing minor trackout from stockpile.
|
ESC18-00667
| General Inspection | 3/26/2019 | 3/26/2019 | 3/26/2019 2:12:44 PM | P | FAIL |
|
|
Landscapers driving equipment through open lots in subdivsion causing trackout and potential future erosion issues.
Alerted subdivsion RP. Appears could be for SFH project.
|
ESC18-01266
| BMP Violation | 3/26/2019 | 3/26/2019 | 3/26/2019 12:37:08 PM | P | FAIL |
|
|
Concrete washout dumped onto pile of loose trash. Trackout from site.
Multiple warning have been issued at this site.
Parcel hold and re-inspection fee issued.
|
ESC18-01020
| BMP Violation | 3/26/2019 | 3/26/2019 | 3/26/2019 12:36:52 PM | P | FAIL |
|
|
Concrete washout dumped onto pile of loose trash. Trackout from site.
Multiple warning have been issued at this site.
Parcel hold and re-inspection fee issued.
|