ESC17-00406
| General Inspection | 3/28/2018 | 3/28/2018 | 4/4/2018 2:54:24 PM | | CANC |
|
|
rescheduled
|
ESC13-01279
| General Inspection | 3/27/2018 | 3/28/2018 | 4/2/2018 2:41:12 PM | A | PASS |
|
|
trash etc
Trash in drain area and wooded area at NE corner of project has been picked up.
|
ESC17-00102
| General Inspection | 3/26/2018 | 3/28/2018 | 3/30/2018 2:10:08 PM | P | PART |
|
|
Site condiitions have not gotten worse.
WIP on pouring sidewalks. Still significant amout of loose dirt and dirt piles on perimeter of Bird STreet. All DIs have sediment bags installed.
Correction request: - pick up trash next to ESC permit sign board - sweep north end of Bird STreet and push dirt back towards site. Clean around sediment bags in storm drain.
|
ESC17-00748
| Tracking Control | 3/26/2018 | 3/28/2018 | 3/30/2018 1:46:05 PM | P | PART |
|
|
New rock installed at entrance. Rock is round and not angular, unable to tell if fabric is underneath.
Trackout from apron and loose dirt in the gutter.
Warned about stockpiles being source of dust. Need to stabilize or move. Stated they need to be screened and dirt will be reused.
|
ESC17-00026
| Site Final | 3/7/2018 | 3/28/2018 | 3/30/2018 9:48:44 AM | A | PASS |
|
|
Temporary sediment bag in receiving storm drain removed. ESC permit conditions satisfied.
|
ESC18-00264
| Tracking Control | 3/27/2018 | 3/28/2018 | 3/29/2018 5:06:45 PM | A | PASS |
|
|
Trackout cleaned up. Permit sign posted. Crews onsite.
Reviewed next step of hillside erosion installment and placement of check dams on the driveway to slow velocity of runoff.
Approved for now
|
ESC16-01553
| Conference | 3/28/2018 | 3/28/2018 | 3/29/2018 4:29:23 PM | P | DONE |
|
|
1:30 Discuss erosion occruing along lot line
RP Bobby has cleaned up loose dirt on sidewalk. Trench to deliver water has been filled in with rock. Correction request to install hillside wattles to slow velocity of runoff before entering the rock channel.
|
ESC17-00441
| Aging Inspection | 3/28/2018 | 3/28/2018 | 3/28/2018 1:16:44 PM | | CANC |
|
|
|
ESC17-01362
| Conference | 3/28/2018 | 3/28/2018 | 3/28/2018 1:13:52 PM | P | DONE |
|
|
RP called to notify that intial excavation for sewer and water has some dewatering required. Onsite infiltration pit has been dug to remove water. Plans for offsite discharge are not yet confirmed.
Notified him about ACHD dewatering permit and turbidity standards in going offsite. Inspection scheduled to review dewatering plans onsite either today or tomorrow.
|
ESC17-00954
| Conference | 3/28/2018 | 3/28/2018 | 3/28/2018 12:40:57 PM | P | DONE |
|
|
Neighbor at 3317 Winsome below the subdivsion notified ESC Inspectors he would hold the City liable if his basement is flooded due to runoff from this site.
Follow up ESC inspection schedule to make sure RSCI is continuing work on site to increase retention of water on site, slow down runoff velocity, and allow settling to discharge clean water to gutter and not neighboring properties.
|
ESC16-01553
| General Inspection | 3/28/2018 | 3/28/2018 | 3/28/2018 11:11:42 AM | | CANC |
|
|
|
ESC17-00149
| Conference | 3/28/2018 | 3/28/2018 | 3/28/2018 11:03:54 AM | P | CANC |
|
|
|
ESC17-00149
| Conference | 3/28/2018 | 3/28/2018 | 3/28/2018 10:54:32 AM | P | PEND |
|
|
Request to stabilize adjacent lot and pull 1st down stream DI bag from site. Notified that ESC permit is still open and needs site final.
|
ESC17-01527
| BMP Violation | 3/27/2018 | 3/28/2018 | 3/28/2018 10:44:56 AM | A | PEND |
|
|
Correction request left on RP voicemail to post ESC permit signs on Core Building sites in Millwell.
|
ESC17-00383
| General Inspection | 3/28/2018 | 3/28/2018 | 3/28/2018 10:10:54 AM | | PASS |
|
|
Construction complete, BLD finaled. No ESC issues. Permit finaled.
|
ESC17-00383