Inspections for the day of: Thursday, March 28, 2019.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-00971 Site Final3/27/20193/28/20193/29/2019 5:10:04 PMANR
Not fullty landscaped.
ESC17-01057 General Inspection3/28/20193/28/20193/29/2019 12:41:25 PM PASS
Last section of slope revegetating. Construction is complete. Should be ready for final in April/May
ESC18-01119 Stop Work Order3/28/20193/28/20193/28/2019 5:03:37 PMPFAIL
SWO posted on door.

-pick up all loose trash
- sweep gutter
- prohibit access to desert by closing open fence section.
- pay re-inspection fee to PDS Permit Desk
- schedule for inspection once all corrections complete.
ESC18-01119 BMP Violation3/28/20193/28/20193/28/2019 4:19:25 PMPFAIL
- Loose trash and debris blowing around site.
- fence to desert open space is open, evidence of damage to vegetation and dirt dumping.
- Dirt in gutter.

Site under an NOV.

Stop Work Order issued.
ESC18-00242 Site Final3/28/20193/28/20193/28/2019 3:52:31 PMPPASS
ESC18-00004 Site Final3/28/20193/28/20193/28/2019 3:52:14 PMPPASS
ESC17-01429 DOC - Permit Finaled3/28/20193/28/20193/28/2019 3:51:16 PMPPASS
ESC18-00291 DOC - Permit Finaled3/28/20193/28/20193/28/2019 3:51:07 PMPPASS
ESC18-00243 DOC - Permit Finaled3/28/20193/28/20193/28/2019 3:50:12 PMPPASS
ESC18-00558 General Inspection3/28/20193/28/20193/28/2019 3:32:32 PM PASS
ESC16-01472 General Inspection3/28/20193/28/20193/28/2019 3:31:32 PMPFAIL
Post rainfall inspection.

Lack of erosion BMPs on cut slope caused significant erosion. Too much water from Shaw Mtn allowed to come across disturbed areas of lot. Silt fence installed saved site from flooding neighbors home again.

Call placed to RP-GC to schedule onsite meeting to review corrective actions needed.
ESC18-01237 Complaint Inspection3/27/20193/28/20193/28/2019 3:28:39 PMAFAIL
Extreme trackout and muddy sidewalk, perimeter controls damanged, no stabilized access.

Verbal correction request to clean up and repair BMPs to Canyon Crest RP Dave. Follow up scheduled.
ESC18-00666 General Inspection3/28/20193/28/20193/28/2019 12:00:23 PM PASS
ESC18-00666 DOC - Permit Finaled3/28/20193/28/20193/28/2019 12:00:11 PMPPASS
ESC18-01615 Site Final3/26/20193/28/20193/28/2019 8:24:54 AMPNR
not stabilized. Will check to see when next development starts.
ESC18-00636 Aging Inspection3/28/20193/28/20193/28/2019 8:24:09 AM CANC
ESC18-00636 DOC - Permit Finaled3/28/20193/28/20193/28/2019 8:24:02 AMPPASS
ESC17-01104 General Inspection3/28/20193/28/20193/28/2019 8:21:02 AM CANC
ESC18-00192 Aging Inspection3/28/20193/28/20193/28/2019 8:07:28 AM CANC