Inspections for the day of: Tuesday, March 29, 2016.
Number of inspections: 23
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-00276 General Inspection3/21/20163/29/20163/30/2016 4:39:59 PMAPASS
Road base area and parcels have been rough graded. No activity at time of inspection. Irrigation ditch tile and culvert is complete and ready for flow.

BMPs include permit signage, heavy construction entrance, and perimeter wattles on the north border of development.

No violations observed.
ESC15-00586 General Inspection3/29/20163/29/20163/30/2016 3:22:13 PM PEND
No activity on parcel. Plans currently under review...No issues observed at site.
ESC15-01170 Aging Inspection3/29/20163/29/20163/30/2016 2:13:57 PM PASS
Garage addition complete except finishing touches. No sediment leaving site, no disturbed area or building materials outside. ESC permit conditions satisfied.
ESC13-00193 General Inspection3/29/20163/29/20163/29/2016 4:39:07 PM PASS
ESC16-00175 General Inspection3/29/20163/29/20163/29/2016 4:21:13 PMPPASS
Re-grading and distribution of the stockpile at Boise Hills Park is now complete. No activity at time of inspection but project is not yet complete.

No trackout or discharges, permit sign posted, and BMPs installed. No corrections needed.
ESC11-00192 General Inspection3/29/20163/29/20163/29/2016 4:17:21 PM PASS
No subdivision or SFH work occuring in Somerset Ridge. No loose sediment leaving the undeveloped parcels. Storm drains have filter bags installed.
ESC15-01518 General Inspection3/29/20163/29/20163/29/2016 4:16:07 PMPPART
Sweep up and DI bag maintenance request to RP-GC Rod. Some loose sediment is in the gutter down from Alturas sites in RH#5.
Also reminded Alturas Construction to be sure to remove the DI bag on Basin Falls once all projects are complete. Rod stated they plan to be done by August....
ESC16-00168 General Inspection3/29/20163/29/20163/29/2016 4:04:22 PMPCANC
Site prep scheduled for tomorrow 11 AM. Syman Co. on site installing BMPs...no inspection conducted at this time.
ESC15-01216 DOC - Permit Finaled3/29/20163/29/20163/29/2016 12:10:17 PMPPASS
No disturbed area or loose sedment/construction related materials at site. TI complete, business is open. All project permts finaled..
ESC16-00134 Site Preparation3/28/20163/29/20163/29/2016 11:56:17 AMAPASS
Brett Phone #: ###-####

Perrmit sign posted. RP stated the old concrete washout is being removed and concrete chunks hauled away this afternoon

New lined washout will be located on Hiawatha..
ESC16-00410 Site Preparation3/28/20163/29/20163/29/2016 11:18:43 AMAPASS
Zack Phone #: ###-####

Project area within vegetated backyard. Main BMP will be end of day sweeping of the driveway area. Permit sign to be posted on contractor's trailer. Approved to continue construction..
ESC16-00225 General Inspection3/29/20163/29/20163/29/2016 10:47:31 AMPPASS
Initial rough grading and road cutting has started on new phase of Boulder Heights. Permit sign posted at the staging area located at east end of Trent Point. Trackout and sediment controls installed at entrance area. No access to site off Windsong. Approved for construcction. Will check for perimeter control needs once the distrubed area footprint is established.
ESC16-00329 General Inspection3/14/20163/29/20163/29/2016 10:39:23 AMPPASS
WIP on addition. No trackout or loose sediment leaving site. Disturbed area drains to vegetated back yard. Clean site. No corrections needed.
ESC14-00809 General Inspection3/29/20163/29/20163/29/2016 10:33:20 AM PASS
ESC15-00282 DOC - Permit Finaled3/29/20163/29/20163/29/2016 10:25:08 AMPPASS
ESC15-00867 Aging Inspection3/29/20163/29/20163/29/2016 10:21:08 AM PASS
Home complete. Not yet landscaped. Being used by Brighton Homes as a "welcome center" for RH#6.

No violations observed.
ESC15-00556 General Inspection3/29/20163/29/20163/29/2016 10:15:47 AM PASS
No subdivision work occuring at this time for next EV phase. No wind-blown dust or erosion issues observed. No corrections at this time.
ESC15-00850 Aging Inspection3/29/20163/29/20163/29/2016 10:07:44 AM PASS
Home complete and landscaped. ESC permit finaled. Pool permit on parcel issued seperately and still in progress.

Alturas Construction still in progress on two SFHs on Grand Prairie, at that time DI bags on River Basin need to be removed and gutters/sidewalks well swept. Correction requested on ESC15-01518
ESC15-00815 Aging Inspection3/29/20163/29/20163/29/2016 10:06:57 AM PASS
Home complete and landscaped. ESC permit finaled.

Alturas Construction still in progress on two SFHs on Grand Prairie, at that time DI bags on River Basin need to be removed and gutters/sidewalks well swept. Correction requested on ESC15-01518
ESC15-00815 DOC - Permit Finaled3/29/20163/29/20163/29/2016 10:05:18 AMPPASS
ESC15-00789 BMP Violation3/25/20163/29/20163/29/2016 9:31:01 AMAPASS
check on construction entrance...requested maintenance or new rock on Friday 3/25

New rock construction was installed as requesed. 9th, River, and 8th Street were swept and the 3 DI bags installed around the perimeter were maintained and then re-installed.

No trackout or discharges. Site is in compliance.
ESC16-00201 Site Preparation3/29/20163/29/20163/29/2016 9:19:47 AMPPASS
Platt Gardens @ 9 AM

Site walk-through inspection conduct with RP and PD

Perimter wattles and construction fencing installed per ESC plan. New sidewalk will be installed around the norther loop of the park next to Capitol Blvd. DI filers bags properly instsalled.

Equipment staging and washout facility to located in the dirt parking lot to the west of the Depot.

Wattles are not yet staked because today the existing grass is going to be stripped.

Approved for construction.
ESC15-00891 General Inspection3/29/20163/29/20163/29/2016 8:20:10 AM PASS