Inspections for the day of: Thursday, March 29, 2018.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-00774 General Inspection3/29/20183/29/20184/6/2018 1:36:47 PMPPEND
No turbidity issues observed. Grass from hydroseed is growing. Walk through scheduled for Modany 4/9
ESC18-00027 General Inspection3/29/20183/29/20184/6/2018 1:35:29 PMPPEND
ESC17-01112 General Inspection3/29/20183/29/20184/5/2018 12:45:04 PMPPASS
Pathway complete. Revegetation phase where path crosses Warm Springs Creek.
ESC18-00457 Site Preparation3/29/20183/29/20184/2/2018 10:05:05 AMPPASS
ESC17-01362 General Inspection3/28/20183/29/20183/30/2018 2:51:45 PMAPASS
check on dewatering

RP JT reviewed dewatering plans. Will hook up a series of weir tanks that will then discharge to a lined channel, flow towards green belt and sheet flow to Walling Creek.

Paper plan to be submitted Monday. Dewatering to begin Monday or Tuesday.
ESC17-00746 Aging Inspection3/29/20183/29/20183/30/2018 9:38:08 AM PASS
Project complete. No construction activity or disturbed area with runoff. ESC permit finaled.
ESC18-00302 Conference3/28/20183/29/20183/29/2018 5:09:22 PMPPASS
Eric Phone #: ###-####

Approved for construction. Permit sign posted. Reviewed ESC permit conditions. Placed rock bag gutter check dam at site.

Dirt from basement excavation has been taken to 1408 N. Garden Street, see ESC17-00949.
ESC16-01743 General Inspection3/29/20183/29/20183/29/2018 1:44:15 PM CANC
ESC17-00334 General Inspection3/29/20183/29/20183/29/2018 1:44:08 PM CANC
ESC17-00324 Aging Inspection3/29/20183/29/20183/29/2018 8:15:27 AM CANC
ESC17-00682 General Inspection3/29/20183/29/20183/29/2018 8:15:19 AM CANC
ESC17-00681 General Inspection3/29/20183/29/20183/29/2018 8:15:10 AM CANC