ESC17-00954
| General Inspection | 3/28/2019 | 3/29/2019 | 4/3/2019 2:20:58 PM | A | CANC |
|
|
|
ESC18-00652
| BMP Violation | 3/26/2019 | 3/29/2019 | 4/2/2019 4:50:29 PM | A | PASS |
|
|
trash detail
Trash picked up
|
ESC17-01196
| General Inspection | 3/29/2019 | 3/29/2019 | 4/2/2019 1:40:28 PM | | FAIL |
|
|
No corrections completed.
Corrections due end of day tomorrow or will issue SWO to site. Multiple failed inspections.
-pick up all loose trash around site and in neighbor's bushes - clean up dirt and material around storm drain. Sweep gutter around site. - install check dams or other BMP to slow down and trap water running down the uphill side (NE) of home to the steep slope. - clean up stucco debris - install silt fence or wattle rows on downhill side of project, clean up dirt that has been deposited in neighbor's yard.
Corrections sent to RP-GC via email. Follow up 4/3 PM
|
ESC18-01760
| BMP Violation | 3/28/2019 | 3/29/2019 | 4/1/2019 1:39:05 PM | A | FAIL |
|
|
Loose trash, mud in gutter. Wood scraps laying around everywhere.
Verbal correction request to Jared and Joshua with Riverwood to clean up this site. Follow up scheduled.
|
ESC18-01289
| General Inspection | 3/29/2019 | 3/29/2019 | 4/1/2019 12:51:11 PM | P | PASS |
|
|
WIP. No trackout from either entrance. No corrections at this time.
|
ESC17-01488
| General Inspection | 3/29/2019 | 3/29/2019 | 4/1/2019 12:50:05 PM | | CANC |
|
|
|
ESC18-00983
| General Inspection | 3/29/2019 | 3/29/2019 | 4/1/2019 12:40:37 PM | P | CANC |
|
|
|
ESC18-00696
| General Inspection | 3/29/2019 | 3/29/2019 | 4/1/2019 11:34:30 AM | | CANC |
|
|
rescheduled for site final.
|
ESC18-00312
| Tracking Control | 3/28/2019 | 3/29/2019 | 4/1/2019 11:31:55 AM | A | FAIL |
|
|
Trackout that was cleaned up has been replaced by more trackout and loose dirt in gutter.
2nd warning. Notified builder Doug ###-#### to stabilzed entrance, fill in area that is a mud puddle. Sweep gutter, install sediment control on receiving storm drain or gutter check bag.
GC said gutter will be swept today, entrance/driveway fixed by Thursday. Follow up scheduled.
|
ESC18-00440
| DOC - Permit Finaled | 3/29/2019 | 3/29/2019 | 3/29/2019 5:20:39 PM | P | PASS |
|
|
|
ESC18-00818
| General Inspection | 3/29/2019 | 3/29/2019 | 3/29/2019 5:19:36 PM | P | FAIL |
|
|
Corrections neeeded: - sweep gutter and remove accumulated material in front of storm drain and parked trailer - sweep sidewalk - install gutter check bags above site to trap dirt from uphill. - install sediment protection on storm drain in front of home.
Follow up scheduled
|
ESC18-01102
| General Inspection | 3/29/2019 | 3/29/2019 | 3/29/2019 5:17:37 PM | P | FAIL |
|
|
Corrections needed:
- clean up sidewalk and gutter in front of home - pick up all loose trash and placed in trash bin - pick up dumped concrete and dried slurry. - pick outpak washout left across the street - install coco mat sediment protection on the storm drain.
follow up scheduled
|
ESC18-01237
| Tracking Control | 3/28/2019 | 3/29/2019 | 3/29/2019 5:09:44 PM | A | PASS |
|
|
Trackout cleaned up. Will need to reinstall perimeter wattles and protect downhill home.
|
ESC16-01472
| General Inspection | 3/29/2019 | 3/29/2019 | 3/29/2019 5:08:50 PM | P | PASS |
|
|
Corrective actions to address the runoff from Shaw Mountain have been completed. - new sand bag diverision to prevent water from cutting over disturbed slope. - two rows of slope interupting wattles. - silt fence catchment between driveway wall and tree where runoff was traveling. - cleaned up and removed silt fence parallel to alley, replaced with new silt fence.
These are temporary controls until landscaping, driveway, and additional site grading can be completed. Working with ACHD and Boise PW on status of the Logan alley .
|
ESC18-01163
| Complaint Inspection | 3/29/2019 | 3/29/2019 | 3/29/2019 3:22:49 PM | P | DONE |
|
|
trash along Bogus Basin road?
RP to pick up trash visible for BB road in the landscaped portion of the subdivision.
|
ESC18-01447
| Site Preparation | 3/28/2019 | 3/29/2019 | 3/29/2019 12:52:21 PM | A | DONE |
|
|
9 AM w/ Jason
Pre-con only. No BMPs yet. Reviewed site. Potential changes to grading and draiange deferred to PW hillside.
Request for beefy long construciton entrance and leak proof washout solution.
|
ESC18-01167
| Tracking Control | 3/29/2019 | 3/29/2019 | 3/29/2019 11:50:36 AM | A | PASS |
|
|
Streeet sweeper onsite sweeping 1st, State, and Fort, but still quite a bit of loose dirt.
Request to refresh entrance was completed during inspection.
Brian with Layton informed that tomorrow a vac truck will get all the material out of gutters and along perimeter fence.
Response was very prompt and worked to beef up entrance to scrape mud.
|
ESC16-01472
| Conference | 3/28/2019 | 3/29/2019 | 3/29/2019 10:56:00 AM | P | PEND |
|
|
Sheet flow from Shaw Mtn crossing over disturbed area has caused issues.
RP-GC has crew on way to do maintenance on silt fence, repair rills/channels on slope of Shaw Mtn, install slope interupting wattles, and additial silt fence between driveway wall and tree/alley.
Will follow up to check on work. Will need to clean up any dirt that passed over wattles and silt fence.
PW investigating alley construction as well as ACHD.
|
ESC18-00637
| Aging Inspection | 3/29/2019 | 3/29/2019 | 3/29/2019 8:28:50 AM | | CANC |
|
|
|
ESC18-00637
| DOC - Permit Finaled | 3/29/2019 | 3/29/2019 | 3/29/2019 8:28:35 AM | P | PASS |
|
|
|
ESC18-00637
| DOC - Permit Finaled | 3/29/2019 | 3/29/2019 | 3/29/2019 8:28:13 AM | P | PASS |
|
|
|
ESC18-00647
| Aging Inspection | 3/29/2019 | 3/29/2019 | 3/29/2019 8:27:36 AM | | CANC |
|
|
|
ESC18-00687
| General Inspection | 3/29/2019 | 3/29/2019 | 3/29/2019 8:26:42 AM | | CANC |
|
|
|
ESC18-00670
| General Inspection | 3/29/2019 | 3/29/2019 | 3/29/2019 8:23:18 AM | | CANC |
|
|
|
ESC17-01776
| Aging Inspection | 3/29/2019 | 3/29/2019 | 3/29/2019 8:21:24 AM | | CANC |
|
|
|
ESC18-00643
| Aging Inspection | 3/29/2019 | 3/29/2019 | 3/29/2019 8:20:48 AM | | CANC |
|
|
|
ESC18-00643
| DOC - Permit Finaled | 3/29/2019 | 3/29/2019 | 3/29/2019 8:20:43 AM | P | PASS |
|
|
|
ESC18-01286
| Site Preparation | 3/19/2019 | 3/29/2019 | 3/28/2019 3:43:55 PM | A | FAIL |
|
|
check on site status, RP was to call for site prep
Site prep completed previously. NO new work has occured, but no new construction entrance as requested.
|