Inspections for the day of: Thursday, March 3, 2016.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-00159 Tracking Control3/2/20163/3/20163/4/2016 2:25:07 PMPCANC
rescheduled
ESC15-00857 Conference3/3/20163/3/20163/4/2016 8:05:44 AMPDONE
Emailed letter outlining steps required to be completed to remove SWO. Letter was received by Jill and Colin 3/3
ESC15-01041 Aging Inspection3/3/20163/3/20163/3/2016 4:24:45 PM PASS
ESC15-01039 Aging Inspection3/3/20163/3/20163/3/2016 4:24:31 PM PASS
ESC15-01040 Aging Inspection3/3/20163/3/20163/3/2016 4:24:21 PM PASS
ESC15-01038 Aging Inspection3/3/20163/3/20163/3/2016 4:24:12 PM PASS
ESC15-00894 Tracking Control2/23/20163/3/20163/3/2016 3:11:30 PMAPASS
Roads were swept. No new trackout. No corrections issued.
ESC15-00893 Tracking Control2/23/20163/3/20163/3/2016 2:58:10 PMAPASS
Sweeping was performed as requested. No trackout, discharges, or fugitive dust observed. Still need to continue weekly sweeping.
ESC15-00857 Complaint Inspection3/3/20163/3/20163/3/2016 2:32:38 PMPDONE
Hydro-seeeding subcontractor was approved to be onsite to apply seed to the slopes and shoulder areas in phase 8 & 9. Prior to VSI (seeding company) coming on site, the developer filled in some gullies in the slopes and bermed some lots to control runoff locations.
This recent grading work has not been formerly reviewed or detailed in a grading or SWPPP plan.

Requested that all work completed this week be documented on the new SWPPP map that is required to be submitted in order to remove the SWO.

No other work not related to repairing erosion or installing BMPs (this includes the hydroseeding) is to be allowed until SWO is formerly lifted.

It was observed that water is being pumped out of Stewart Gulch creek for use in hydroseeding truck. It is unclear if this is a common or prohibited practice. There was no damage in the creek area observed, the truck is parking on the street and filling up with a hose & pump system
ESC14-01063 Complaint Inspection3/3/20163/3/20163/3/2016 2:31:52 PMPDONE
Hydro-seeeding subcontractor was approved to be onsite to apply seed to the slopes and shoulder areas in phase 8 & 9. Prior to VSI (seeding company) coming on site, the developer filled in some gullies in the slopes and bermed some lots to control runoff locations.
This recent grading work has not been formerly reviewed or detailed in a grading or SWPPP plan.

Requested that all work completed this week be documented on the new SWPPP map that is required to be submitted in order to remove the SWO.

No other work not related to repairing erosion or installing BMPs (this includes the hydroseeding) is to be allowed until SWO is formerly lifted.

It was observed that water is being pumped out of Stewart Gulch creek for use in hydroseeding truck. It is unclear if this is a common or prohibited practice. There was no damage in the creek area observed, the truck is parking on the street and filling up with a hose & pump system.
ESC15-01513 BMP Violation3/1/20163/3/20163/3/2016 2:20:43 PMPPART
followup

Street and gutter were swept but street is still fairly dirty. Needs futher sweeping and will need to remove the stockpile place in the parking spot.

Does not appear the storm drain at end of the street was cleaned or DI bag changed.

No spills or active discharges. Trash and other materials are contained.

GC needs to continue to work on house keeping.
ESC15-00794 General Inspection3/3/20163/3/20163/3/2016 12:15:18 PM PASS
WIP. No violations. Need to landscaped around the addition.
ESC16-00136 General Inspection3/2/20163/3/20163/3/2016 11:37:49 AMAPASS
Permit sign posted. Storm drain has maintained DI bag installed.
ESC15-01104 DOC - Permit Finaled3/3/20163/3/20163/3/2016 11:31:08 AMPPASS
ESC16-00121 DOC - Permit Finaled3/3/20163/3/20163/3/2016 11:17:31 AMPPASS
Sign installed. Area of disturbance cleaned and landscaped.
ESC15-01103 General Inspection3/3/20163/3/20163/3/2016 11:01:20 AMPPART
No significant trackout or discharges observed. Lots of unswept sediment and gravel

Correction request:

Sweep street around the inlet in front of the plant.
ESC15-00667 General Inspection3/3/20163/3/20163/3/2016 10:00:56 AM PASS
Shoulder revegetation in progress. Silt fences (temporary) still installed till final stabilization.
ESC15-00006 General Inspection3/3/20163/3/20163/3/2016 9:21:29 AM PASS
ESC13-01279 General Inspection3/3/20163/3/20163/3/2016 8:51:03 AM PASS