Inspections for the day of: Thursday, March 30, 2017.
Number of inspections: 24
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-00038 BMP Violation3/28/20173/30/20173/31/2017 2:43:24 PMACANC
rescheduled
ESC16-01489 General Inspection3/30/20173/30/20173/31/2017 11:42:05 AMPPEND
Some activity related to gravitiy irrigation installation for subdivision and irrigation district in their ROW. No trackout.

Wood Brothers to provide ESC permit application and SWPPP within first half of April
ESC16-01006 BMP Violation3/30/20173/30/20173/31/2017 11:35:08 AMPFAIL
Concrete washout full and is not marked so concrete trucks don't know where it is.

Need to provide new washout that is clearly marked.

Need to submit SWPPP for phase 2
ESC17-00127 General Inspection3/28/20173/30/20173/31/2017 11:28:09 AMPPART
WIP on foundation. No trackout or discharges occuring. Permit sign posted in alley. Access to site from ally.

Request to install inlet protection on north side Sloan at Utahna. Requested that site foreman Rob take the RP class.
ESC16-00551 Site Final3/9/20173/30/20173/31/2017 9:59:30 AMPFAIL
check that DI bag is removed

DI bag still installed. BLD still open and home unoccupied. Need to remove the temporary BMP. Next site final failed will result in reinspection fee.
ESC15-00857 General Inspection3/30/20173/30/20173/30/2017 12:53:34 PMPPEND
No subdivision activity in phase # 9. No significant sediment runoff from slopes and road shoulders observed in upper sections of subdivision. Will need to clean up accumulated sediment around strom drains.

Upper lot with temporary drainage trenches to stormwater swale has a lot of pooled stormwater. Swale/basin about to overflow which will require ther repair and regrading as conditions allow.

Siginificant open space buffer below this small pond.

Hydroseeded areas are vegetating well with grasses and various weeds
ESC16-01048 Aging Inspection3/30/20173/30/20173/30/2017 12:45:10 PM PASS
Demolition complete. No loose stockpiles or materials on site. Vegetating with grasses, site prepped for future SFH construction. Permit finaled.
ESC16-01048 DOC - Permit Finaled3/30/20173/30/20173/30/2017 12:43:13 PMPPASS
ESC16-01641 BMP Violation3/30/20173/30/20173/30/2017 12:17:45 PMPFAIL
No permit sign. No trash containment on site.
ESC17-00094 BMP Violation3/30/20173/30/20173/30/2017 12:17:15 PMPFAIL
No permit sign posted. No concrete washout for Millwell Park provided. No site preparation inspection request.

No trackout or discharges occuring, but need to
- post permit sign
- provide trash container
- work with fellow builders in Millwell and developer to get a leak proof washout container or pit on site ASAP or no new sites will be approved.

RP Marty stated he will post signs and meet on site to discuss ESC conditions and BMPs on Monday 4/3
ESC17-00093 BMP Violation3/30/20173/30/20173/30/2017 12:17:03 PMPFAIL
No permit sign posted. No concrete washout for Millwell Park provided. No site preparation inspection request.

No trackout or discharges occuring, but need to
- post permit sign
- provide trash container
- work with fellow builders in Millwell and developer to get a leak proof washout container or pit on site ASAP or no new sites will be approved.

RP Marty stated he will post signs and meet on site to discuss ESC conditions and BMPs on Monday 4/3
ESC16-00055 General Inspection3/30/20173/30/20173/30/2017 11:57:50 AMPFAIL
Landscaping in progress. Dumping dirt and material in washout area without proper clean up. No activity at time of rain, but request to Tahoe Homes to have landscaping contractor provide staging areas and haul of excess material from sub.
ESC16-00748 Site Final3/30/20173/30/20173/30/2017 11:55:10 AMPPASS
Home complete and landscaped. No ESC requests. Sediment bags in stom drains on Baron to remain till all homes on south end of Belmar sub are complete.
ESC16-00050 Site Final3/30/20173/30/20173/30/2017 11:54:52 AMPPASS
Home complete and landscaped. No ESC requests. Sediment bags in stom drains on Baron to remain till all homes on south end of Belmar sub are complete.
ESC16-00048 Site Final3/30/20173/30/20173/30/2017 11:54:36 AMPPASS
Home complete and landscaped. No ESC requests. Sediment bags in stom drains on Baron to remain till all homes on south end of Belmar sub are complete.
ESC16-00048 Aging Inspection3/30/20173/30/20173/30/2017 11:54:20 AM CANC
ESC16-00058 Site Final3/30/20173/30/20173/30/2017 11:54:09 AMPPASS
Home complete and landscaped. No ESC requests. Sediment bags in stom drains on Baron to remain till all homes on south end of Belmar sub are complete.
ESC16-00485 Site Final3/30/20173/30/20173/30/2017 11:53:55 AMPPASS
Home complete and landscaped. No ESC requests. Sediment bags in stom drains on Baron to remain till all homes on south end of Belmar sub are complete.
ESC16-01130 Site Final3/30/20173/30/20173/30/2017 11:53:36 AMPPASS
Home complete and landscaped. No ESC requests. Sediment bags in stom drains on Baron to remain till all homes on south end of Belmar sub are complete.
ESC16-01003 Site Final3/30/20173/30/20173/30/2017 11:53:22 AMPPASS
Home complete and landscaped. No ESC requests. Sediment bags in stom drains on Baron to remain till all homes on south end of Belmar sub are complete.
ESC16-00930 DOC - Permit Finaled3/30/20173/30/20173/30/2017 11:24:16 AMPPASS
ESC17-00223 Site Preparation3/29/20173/30/20173/30/2017 11:24:06 AMAFAIL
Matt Phone #: ###-####

No construction allowed till Belmar concrete washout area is cleaned up and new washout or portable containment are provided.

Need to request re-inspection when complete.

RP is closing down washout and states there has been unauthorized dumping occuring in washout adding to problem.

Will check for clean up & removal next week.
ESC16-00966 General Inspection3/30/20173/30/20173/30/2017 10:59:38 AM CANC
ESC16-00208 General Inspection3/30/20173/30/20173/30/2017 8:01:19 AM CANC