ESC17-00038
| BMP Violation | 3/28/2017 | 3/30/2017 | 3/31/2017 2:43:24 PM | A | CANC |
|
|
rescheduled
|
ESC16-01489
| General Inspection | 3/30/2017 | 3/30/2017 | 3/31/2017 11:42:05 AM | P | PEND |
|
|
Some activity related to gravitiy irrigation installation for subdivision and irrigation district in their ROW. No trackout.
Wood Brothers to provide ESC permit application and SWPPP within first half of April
|
ESC16-01006
| BMP Violation | 3/30/2017 | 3/30/2017 | 3/31/2017 11:35:08 AM | P | FAIL |
|
|
Concrete washout full and is not marked so concrete trucks don't know where it is.
Need to provide new washout that is clearly marked.
Need to submit SWPPP for phase 2
|
ESC17-00127
| General Inspection | 3/28/2017 | 3/30/2017 | 3/31/2017 11:28:09 AM | P | PART |
|
|
WIP on foundation. No trackout or discharges occuring. Permit sign posted in alley. Access to site from ally.
Request to install inlet protection on north side Sloan at Utahna. Requested that site foreman Rob take the RP class.
|
ESC16-00551
| Site Final | 3/9/2017 | 3/30/2017 | 3/31/2017 9:59:30 AM | P | FAIL |
|
|
check that DI bag is removed
DI bag still installed. BLD still open and home unoccupied. Need to remove the temporary BMP. Next site final failed will result in reinspection fee.
|
ESC15-00857
| General Inspection | 3/30/2017 | 3/30/2017 | 3/30/2017 12:53:34 PM | P | PEND |
|
|
No subdivision activity in phase # 9. No significant sediment runoff from slopes and road shoulders observed in upper sections of subdivision. Will need to clean up accumulated sediment around strom drains.
Upper lot with temporary drainage trenches to stormwater swale has a lot of pooled stormwater. Swale/basin about to overflow which will require ther repair and regrading as conditions allow.
Siginificant open space buffer below this small pond.
Hydroseeded areas are vegetating well with grasses and various weeds
|
ESC16-01048
| Aging Inspection | 3/30/2017 | 3/30/2017 | 3/30/2017 12:45:10 PM | | PASS |
|
|
Demolition complete. No loose stockpiles or materials on site. Vegetating with grasses, site prepped for future SFH construction. Permit finaled.
|
ESC16-01048
| DOC - Permit Finaled | 3/30/2017 | 3/30/2017 | 3/30/2017 12:43:13 PM | P | PASS |
|
|
|
ESC16-01641
| BMP Violation | 3/30/2017 | 3/30/2017 | 3/30/2017 12:17:45 PM | P | FAIL |
|
|
No permit sign. No trash containment on site.
|
ESC17-00094
| BMP Violation | 3/30/2017 | 3/30/2017 | 3/30/2017 12:17:15 PM | P | FAIL |
|
|
No permit sign posted. No concrete washout for Millwell Park provided. No site preparation inspection request.
No trackout or discharges occuring, but need to - post permit sign - provide trash container - work with fellow builders in Millwell and developer to get a leak proof washout container or pit on site ASAP or no new sites will be approved.
RP Marty stated he will post signs and meet on site to discuss ESC conditions and BMPs on Monday 4/3
|
ESC17-00093
| BMP Violation | 3/30/2017 | 3/30/2017 | 3/30/2017 12:17:03 PM | P | FAIL |
|
|
No permit sign posted. No concrete washout for Millwell Park provided. No site preparation inspection request.
No trackout or discharges occuring, but need to - post permit sign - provide trash container - work with fellow builders in Millwell and developer to get a leak proof washout container or pit on site ASAP or no new sites will be approved.
RP Marty stated he will post signs and meet on site to discuss ESC conditions and BMPs on Monday 4/3
|
ESC16-00055
| General Inspection | 3/30/2017 | 3/30/2017 | 3/30/2017 11:57:50 AM | P | FAIL |
|
|
Landscaping in progress. Dumping dirt and material in washout area without proper clean up. No activity at time of rain, but request to Tahoe Homes to have landscaping contractor provide staging areas and haul of excess material from sub.
|
ESC16-00748
| Site Final | 3/30/2017 | 3/30/2017 | 3/30/2017 11:55:10 AM | P | PASS |
|
|
Home complete and landscaped. No ESC requests. Sediment bags in stom drains on Baron to remain till all homes on south end of Belmar sub are complete.
|
ESC16-00050
| Site Final | 3/30/2017 | 3/30/2017 | 3/30/2017 11:54:52 AM | P | PASS |
|
|
Home complete and landscaped. No ESC requests. Sediment bags in stom drains on Baron to remain till all homes on south end of Belmar sub are complete.
|
ESC16-00048
| Site Final | 3/30/2017 | 3/30/2017 | 3/30/2017 11:54:36 AM | P | PASS |
|
|
Home complete and landscaped. No ESC requests. Sediment bags in stom drains on Baron to remain till all homes on south end of Belmar sub are complete.
|
ESC16-00048
| Aging Inspection | 3/30/2017 | 3/30/2017 | 3/30/2017 11:54:20 AM | | CANC |
|
|
|
ESC16-00058
| Site Final | 3/30/2017 | 3/30/2017 | 3/30/2017 11:54:09 AM | P | PASS |
|
|
Home complete and landscaped. No ESC requests. Sediment bags in stom drains on Baron to remain till all homes on south end of Belmar sub are complete.
|
ESC16-00485
| Site Final | 3/30/2017 | 3/30/2017 | 3/30/2017 11:53:55 AM | P | PASS |
|
|
Home complete and landscaped. No ESC requests. Sediment bags in stom drains on Baron to remain till all homes on south end of Belmar sub are complete.
|
ESC16-01130
| Site Final | 3/30/2017 | 3/30/2017 | 3/30/2017 11:53:36 AM | P | PASS |
|
|
Home complete and landscaped. No ESC requests. Sediment bags in stom drains on Baron to remain till all homes on south end of Belmar sub are complete.
|
ESC16-01003
| Site Final | 3/30/2017 | 3/30/2017 | 3/30/2017 11:53:22 AM | P | PASS |
|
|
Home complete and landscaped. No ESC requests. Sediment bags in stom drains on Baron to remain till all homes on south end of Belmar sub are complete.
|
ESC16-00930
| DOC - Permit Finaled | 3/30/2017 | 3/30/2017 | 3/30/2017 11:24:16 AM | P | PASS |
|
|
|
ESC17-00223
| Site Preparation | 3/29/2017 | 3/30/2017 | 3/30/2017 11:24:06 AM | A | FAIL |
|
|
Matt Phone #: ###-####
No construction allowed till Belmar concrete washout area is cleaned up and new washout or portable containment are provided.
Need to request re-inspection when complete.
RP is closing down washout and states there has been unauthorized dumping occuring in washout adding to problem.
Will check for clean up & removal next week.
|
ESC16-00966
| General Inspection | 3/30/2017 | 3/30/2017 | 3/30/2017 10:59:38 AM | | CANC |
|
|
|
ESC16-00208
| General Inspection | 3/30/2017 | 3/30/2017 | 3/30/2017 8:01:19 AM | | CANC |
|
|
|