PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Friday, March 30, 2018
.
Number of inspections:
12
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC17-00078
General Inspection
3/30/2018
3/30/2018
4/5/2018 12:45:33 PM
PASS
No trackout, dust, or discharges. Roads not yet paved.
ESC16-00225
Conference
3/29/2018
3/30/2018
4/3/2018 4:26:45 PM
A
CANC
rescheduled
ESC17-00641
General Inspection
3/30/2018
3/30/2018
4/2/2018 4:04:11 PM
CANC
ESC17-01491
BMP Violation
3/30/2018
3/30/2018
3/30/2018 3:05:04 PM
P
PEND
Turbidity samples of Walling Creek at first downstream pedestrian bridge were 190 NTU and 168 NTU. Well above the permissable +50 NTU over background level.
Plume had not reached east Parkcenter Bridge as of 12 PM. River is reading 13.9 NTU at Walling Creek confluence.
Crews moved dewatering hose to the basin between Greenbelt and Warm Springs bypass. Initial location where hose was moved too was found to have and outlet back to creek. This outlet now has additional controls should there be any overflow of first basin area.
2 hour investigation fee charged. Request to complete corrective action report and monitor until dewatering is complete, which is supposed to be today.
Discharge to waterway was stopped with 90 minutes of arriving at site.
Initial inspection, turbidity sampling, and investigation from 9:45-12 PM
ESC15-01579
General Inspection
3/30/2018
3/30/2018
3/30/2018 2:54:33 PM
P
PART
Only some bits and peices of trash found around Greenbelt and Walling Creek. Stucco is now complete with scaffolding and plastic sheeting gone.
Perimeter sediment controls installed on unfinished landscaped areas.
Correction requests:
- pick up trash across street in employee parking area
- clean up stucco piles below building #3 and that staging area.
ESC17-00949
Conference
3/29/2018
3/30/2018
3/30/2018 2:39:57 PM
A
DONE
change RP and project description due to next phase.
ESC18-00071
Site Preparation
3/30/2018
3/30/2018
3/30/2018 2:05:24 PM
P
CANC
Late after - Jeremy Phone #: ###-####
Intended for foundation inspection
ESC18-00072
Site Preparation
3/30/2018
3/30/2018
3/30/2018 2:05:03 PM
P
CANC
Jeremy Phone #: ###-####
intended for foundation inspection
ESC17-00634
Aging Inspection
3/30/2018
3/30/2018
3/30/2018 1:21:21 PM
CANC
ESC16-00329
General Inspection
3/30/2018
3/30/2018
3/30/2018 1:20:49 PM
CANC
ESC17-01491
Random Inspection
3/30/2018
3/30/2018
3/30/2018 10:41:20 AM
P
FAIL
Crews dismantling settling structure while also pumping dirty water into system. Silt fence has lifted up and muddy water flowing down Walling Creek.
Immediate request to extend hose and land apply to the NW between greenbelt and Warm Springs bypass.. Do not want to flood excavation area so cannot shut down pump.
Notified RP and Syman to respond
ESC17-00746
DOC - Permit Finaled
3/30/2018
3/30/2018
3/30/2018 9:37:15 AM
P
PASS