Inspections for the day of: Friday, March 30, 2018.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-00078 General Inspection3/30/20183/30/20184/5/2018 12:45:33 PM PASS
No trackout, dust, or discharges. Roads not yet paved.
ESC16-00225 Conference3/29/20183/30/20184/3/2018 4:26:45 PMACANC
rescheduled
ESC17-00641 General Inspection3/30/20183/30/20184/2/2018 4:04:11 PM CANC
ESC17-01491 BMP Violation3/30/20183/30/20183/30/2018 3:05:04 PMPPEND
Turbidity samples of Walling Creek at first downstream pedestrian bridge were 190 NTU and 168 NTU. Well above the permissable +50 NTU over background level.

Plume had not reached east Parkcenter Bridge as of 12 PM. River is reading 13.9 NTU at Walling Creek confluence.


Crews moved dewatering hose to the basin between Greenbelt and Warm Springs bypass. Initial location where hose was moved too was found to have and outlet back to creek. This outlet now has additional controls should there be any overflow of first basin area.

2 hour investigation fee charged. Request to complete corrective action report and monitor until dewatering is complete, which is supposed to be today.

Discharge to waterway was stopped with 90 minutes of arriving at site.

Initial inspection, turbidity sampling, and investigation from 9:45-12 PM
ESC15-01579 General Inspection3/30/20183/30/20183/30/2018 2:54:33 PMPPART
Only some bits and peices of trash found around Greenbelt and Walling Creek. Stucco is now complete with scaffolding and plastic sheeting gone.

Perimeter sediment controls installed on unfinished landscaped areas.

Correction requests:
- pick up trash across street in employee parking area
- clean up stucco piles below building #3 and that staging area.
ESC17-00949 Conference3/29/20183/30/20183/30/2018 2:39:57 PMADONE
change RP and project description due to next phase.
ESC18-00071 Site Preparation3/30/20183/30/20183/30/2018 2:05:24 PMPCANC
Late after - Jeremy Phone #: ###-####

Intended for foundation inspection
ESC18-00072 Site Preparation3/30/20183/30/20183/30/2018 2:05:03 PMPCANC
Jeremy Phone #: ###-####

intended for foundation inspection
ESC17-00634 Aging Inspection3/30/20183/30/20183/30/2018 1:21:21 PM CANC
ESC16-00329 General Inspection3/30/20183/30/20183/30/2018 1:20:49 PM CANC
ESC17-01491 Random Inspection3/30/20183/30/20183/30/2018 10:41:20 AMPFAIL
Crews dismantling settling structure while also pumping dirty water into system. Silt fence has lifted up and muddy water flowing down Walling Creek.

Immediate request to extend hose and land apply to the NW between greenbelt and Warm Springs bypass.. Do not want to flood excavation area so cannot shut down pump.

Notified RP and Syman to respond
ESC17-00746 DOC - Permit Finaled3/30/20183/30/20183/30/2018 9:37:15 AMPPASS