Inspections for the day of: Friday, March 31, 2017.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-00788 General Inspection3/31/20173/31/20174/5/2017 2:32:56 PM CANC
ESC17-00107 Site Preparation3/27/20173/31/20174/5/2017 1:48:17 PMPPART
New washout pit provided, though now full of stormwater. Should be drained before use and location relocated to area that does not receive storm water run on. WIP on cleaning up sediment trapped outside of DI protection on corner.
ESC15-00509 General Inspection3/31/20173/31/20173/31/2017 5:10:27 PM PEND
ESC15-00729 General Inspection3/31/20173/31/20173/31/2017 2:44:04 PM CANC
rescheduled
ESC15-01269 Site Final3/31/20173/31/20173/31/2017 1:52:36 PMPPASS
NO earthwork observed , no disturbance outside of courtyard wall. No activity on BLD since May 2015. Permit finaled.
ESC16-00618 Random Inspection3/31/20173/31/20173/31/2017 1:51:29 PMPPASS
WIP. Permit sign posted. HOme near completion but not yet landscaped/stabilized. No sediment runoff or trackout from site.
ESC15-01420 General Inspection3/31/20173/31/20173/31/2017 1:35:01 PMPPASS
New filter mat has been installed at MS4 on west end of North Hill sub. Trash and materials are contained around sites. No trackout or discharges. Approved.

Note:
- area on west side drainage to be landscaped for upcoming Parade of Homes.
ESC16-01061 Aging Inspection3/31/20173/31/20173/31/2017 11:09:32 AM PASS
Project complete. No ESC issues. All permits finaled.
ESC16-01061 DOC - Permit Finaled3/31/20173/31/20173/31/2017 11:09:06 AMPPASS
ESC16-01095 General Inspection3/31/20173/31/20173/31/2017 10:25:57 AM CANC
ESC16-00774 DOC - Permit Finaled3/31/20173/31/20173/31/2017 10:22:58 AMPPASS
Home complete and landscaped for stabililzation. Temp BMPs to remain for new construction on adjacent empty lots.
ESC16-00823 Site Final3/31/20173/31/20173/31/2017 10:21:04 AMPPASS
Home complete and landscaped for stabililzation. Temp BMPs to remain for new construction on adjacent empty lots.
ESC16-00880 Site Final3/31/20173/31/20173/31/2017 10:20:52 AMAPASS
Home complete and landscaped for stabililzation. Temp BMPs to remain for new construction on adjacent empty lots.
ESC17-00210 Random Inspection3/31/20173/31/20173/31/2017 9:56:36 AMAPASS
WIP on foundation. Permit sign posted. No disturbance outside limits of construction, using existing common drive for access. No corrections
ESC16-01108 General Inspection3/31/20173/31/20173/31/2017 9:42:27 AMAPASS
Hayden Homes working on SFHs. Concrete washout pit provided on NW corner of Azure.. Storm drain inlets have filter bag protection. No trackout or trash violations. Will need to install inlet protection when work begins on Azure.
ESC16-01620 DOC - Permit Finaled3/31/20173/31/20173/31/2017 9:40:28 AMPPASS
Home complete, landscaped and occupied. No ESC requests. WIP on other Hayden Homes in currently in compliance. Permit finaled.
ESC16-01490 DOC - Permit Finaled3/31/20173/31/20173/31/2017 9:40:16 AMPPASS
Home complete, landscaped and occupied. No ESC requests. WIP on other Hayden Homes in currently in compliance. Permit finaled.
ESC16-00785 DOC - Permit Finaled3/31/20173/31/20173/31/2017 9:37:30 AMPPASS
ESC16-00779 General Inspection3/31/20173/31/20173/31/2017 8:36:33 AM PASS
Project complete. All permits finaled. Area around modular classrooms stablized
ESC16-00779 DOC - Permit Finaled3/31/20173/31/20173/31/2017 8:36:00 AMPPASS