ESC13-00710
| General Inspection | 3/4/2014 | 3/4/2014 | 3/4/2014 5:07:32 PM | | CANC |
|
|
rescheduled for 3/5. Unable to reach due to makeup inspections from last week's absence.
|
ESC14-00142
| Site Preparation | 3/4/2014 | 3/4/2014 | 3/4/2014 5:05:49 PM | P | PASS |
|
|
Homeowner RP. Discussed permit conditions and expectations. Low risk site, building a garage behind house, surrounded by vegetative buffer. Permit is posted. Approved for construction.
|
ESC12-01189
| DOC - Permit Finaled | 3/4/2014 | 3/4/2014 | 3/4/2014 4:35:48 PM | P | PASS |
|
|
House complete and landscaped. BMPs and construction materials have been removed. No outstanding violations or corrections. BLD permit is finaled.
|
ESC13-00806
| General Inspection | 3/4/2014 | 3/4/2014 | 3/4/2014 4:32:48 PM | | PASS |
|
|
BMPs in place. Minimal trackout. Site is in compliance.
|
ESC13-01040
| General Inspection | 3/4/2014 | 3/4/2014 | 3/4/2014 4:27:01 PM | | PART |
|
|
No trackout or other significant violations, but no permit visibly posted at site. Left new permit onsite with permit details.
|
ESC13-01132
| General Inspection | 3/4/2014 | 3/4/2014 | 3/4/2014 4:15:40 PM | | PASS |
|
|
Permit posted on trash receptacle. No trackout or sediment leaving site. Project near completion. No corrections required.
|
ESC13-01279
| Tracking Control | 3/4/2014 | 3/4/2014 | 3/4/2014 10:54:08 AM | A | FAIL |
|
|
Correction notice posted:
1. Replenish construction entrance. Place geo-textile down to prevent mud from seeping up from pressure of dump trucks. 2. Install BMP on east side of Eckart to the south of the constrution entrance. Water and sediment flows to drainage ditch and river. 3. Continue daily sweeping as necessary.
Photos of violations have been taken. Written CN posted.
|
ESC11-00176
| DOC - Permit Finaled | 3/4/2014 | 3/4/2014 | 3/4/2014 10:49:07 AM | P | PASS |
|
|
Subdivision site development is complete, some construction on-going on remaining individual sites in Solaire #2 with active ESC permits. BLD permit for grading/development is already finaled. Big Springs construction will remove non-temporary BMPs once their homesites are complete.
|
ESC13-01002
| General Inspection | 3/4/2014 | 3/4/2014 | 3/4/2014 9:28:30 AM | | PASS |
|
|
Permit posted, BMPs installed.. Still on seasonal shut down. No corrections at this time.
|
ESC13-00951
| General Inspection | 3/4/2014 | 3/4/2014 | 3/4/2014 9:24:19 AM | | PASS |
|
|
No activity. Triplett Ranch BMPs in place. No corrections at this time.
|
ESC13-01134
| DOC - Permit Finaled | 3/4/2014 | 3/4/2014 | 3/4/2014 9:12:36 AM | P | PASS |
|
|
TI on existing commercial building is complete. No construction materials or activity observed. ESC conditions have been satisfied.
|
ESC13-00549
| Site Preparation | 3/3/2014 | 3/4/2014 | 3/4/2014 8:59:24 AM | A | PASS |
|
|
Dan Appel Phone #: ###-#### >> Inspection requested via web by Daniel Appel
Site is ready for excavation. Temporary power pole now installed so Dan is posting permit. Subdivision is clean, no grade, downstream DI has protection. Informed Dan that is the open lot down the street is to be used for staging or stockpiling, a general ESC permit will need to be acquired. Approved.
|