Inspections for the day of: Wednesday, March 4, 2020.
Number of inspections: 4
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC19-00324 General Inspection3/4/20203/4/20203/5/2020 4:22:39 PM PART
Joint trenching around perimeter is still not complete and the silt fence perimeter is not installed/repair.

On the upper portion, crews are installing sidewalk and small retaining walls between lots. New top of slope berms have been installed.

Concrete washout pan is onsite.

Corrections:

- re-install perimeter silt fence ASAP
- install stormwater control berms, perimeter silt fence and implement ground stabilization for the central common area.
ESC19-00264 Aging Inspection3/4/20203/4/20203/4/2020 4:06:56 PM CANC
ESC18-01142 General Inspection3/4/20203/4/20203/4/2020 11:21:32 AM PEND
Builder to schedule conference prior to resuming activity at site.

Damion notified
ESC07-00733 DOC - Permit Finaled3/4/20203/4/20203/4/2020 9:16:26 AMPPASS
No disturbed area, excavation occured in the past and this was a re-issued permit