Inspections for the day of: Thursday, March 6, 2014.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-01045 Site Final3/6/20143/6/20143/7/2014 7:38:37 AMPCANC
data entry error. Disregard.
ESC14-00058 Site Preparation3/6/20143/6/20143/6/2014 4:25:04 PMPFAIL
No site prep called in. RP must schedule a site prep.

Permit is posted an no other violations so work may continue. Reinspection fee may apply.
ESC13-01045 BMP Violation3/6/20143/6/20143/6/2014 4:17:25 PMPFAIL
BLD already finaled but ESC conditions not satisfied.

Corrections:
1. Clean up trash and debris
2. Sweep sidewalks and street
3. Acquire permit for adjacent lot that is torn up from construction traffic. Regrade and stabilize as necessary.

If no action, all Sunrise projects will be placed on hold. Left message with RP Justin; awaiting a return call
ESC13-00806 Random Inspection3/6/20143/6/20143/6/2014 4:07:29 PMPFAIL
Corrections required:

1. Repair construction entrance
2. Sweep culdesac
3. No permit for staging area on adjacent lot

Called RP for verbal warning. Will check tomorrow.
ESC13-01148 General Inspection3/5/20143/6/20143/6/2014 4:01:20 PMPPASS
make up from 3/5

No work on the pool at this time. No violations observed.
ESC13-01173 Site Preparation3/6/20143/6/20143/6/2014 2:59:16 PMPPART
BMPs installed. Permit posted. No activity at time of inspection but issued verbal warning to RP Gordon Beck for not scheduling a site prep inspection.
ESC13-01151 General Inspection3/5/20143/6/20143/6/2014 2:54:56 PMPPASS
make up from 3/5

Permit posted. BMPS installed. No trackout from vehicles or foot traffic. No corrections required.
ESC13-01177 DOC - Permit Finaled3/6/20143/6/20143/6/2014 2:43:24 PMPPASS
Sidewalk is installed and has been cleaned. All construction materials removed from site. ESC conditions satisfied.
ESC13-01173 Site Final3/6/20143/6/20143/6/2014 11:56:00 AMPCANC
test entry, disregard
ESC13-00812 Aging Inspection3/6/20143/6/20143/6/2014 10:48:48 AM PASS
Finaled.
ESC13-00812 DOC - Permit Finaled3/6/20143/6/20143/6/2014 10:48:24 AMPPASS
Pool is complete. Yard stabilized. BLD permits finaled.
ESC14-00031 General Inspection3/6/20143/6/20143/6/2014 10:39:38 AM PASS
Parks and Rec annual permit for citywide operations excluding projects performed by contractors.
ESC13-00688 Aging Inspection3/6/20143/6/20143/6/2014 10:21:16 AM PASS
ESC13-00688 DOC - Permit Finaled3/6/20143/6/20143/6/2014 10:21:00 AMPPASS
Home is complete and construction materials removed. Yard has been graded below curbs and landscaping will be completed by the new homeowner. ESC conditions satisfied.
ESC13-00344 General Inspection3/5/20143/6/20143/6/2014 10:12:13 AMPPASS
make up from 3/5

BH #5 is holding up good through rain. Check dams at top of windsong have been maintained. No blowout. Stabilization in progress on hillsides. No corrections at this time.
ESC14-00009 General Inspection3/6/20143/6/20143/6/2014 10:10:35 AM PART
Site was cleaned after foundation work. No vehicle trackout and sidewalk was swept. No work during the mud.

1 correction:
Provide concrete and liquid waste washout and removed pile of concrete in front of house.

Discussed issues with RP who will make corrections.
ESC13-01279 Tracking Control3/6/20143/6/20143/6/2014 9:31:40 AMAPASS
Lucky Harris 13 has come back into compliance after the CN issued on 3/4.

Corrections made:
1. More rock of larger size added to construction entrance.
2. Wattles placed across Eckart to protect drainage ditch.
3. Road, gutters, and tops of curbs have been cleaned.
4. Site is on currently restricted during this week of precipitation.

The CN was removed today.
ESC14-00104 Site Preparation3/5/20143/6/20143/6/2014 9:23:12 AMAPASS
Please call with any questions. Thanks Phone #: ###-#### >> Inspection requested via web by Joshua Edwards

Site is ready for excavation. MIll District Square in good condition. Permit posted, BMPs in place. Approved. Brighton Homes now has two RPs Braxton and Josh
ESC12-00677 General Inspection3/6/20143/6/20143/6/2014 8:56:48 AM PASS
ESC12-00677 DOC - Permit Finaled3/6/20143/6/20143/6/2014 8:56:36 AMPPASS
Entire Timberside phase is developed with infrastructure and homes on individual houses. No further ESC inspections required.