ESC16-01459
| Site Preparation | 2/27/2017 | 3/6/2017 | 3/8/2017 7:45:46 AM | A | CANC |
|
|
Follow up concrete washout/slurry
|
ESC16-00096
| General Inspection | 3/6/2017 | 3/6/2017 | 3/8/2017 7:45:17 AM | | CANC |
|
|
|
ESC16-01645
| Site Preparation | 3/3/2017 | 3/6/2017 | 3/7/2017 5:04:16 PM | P | CANC |
|
|
|
ESC16-01487
| General Inspection | 3/1/2017 | 3/6/2017 | 3/7/2017 4:38:08 PM | A | PEND |
|
|
milwell phase 2 - this is the ESC permit for the previous home demolitiion by same developer.
Trackout to Saxton has been cleaned.
Corrections still needed:
- submit SWPPP for review and get ESC permit issued for prep and irrigation pipe installation. - post CGP tracking # and info
|
ESC16-00168
| General Inspection | 3/6/2017 | 3/6/2017 | 3/7/2017 8:00:51 AM | | CANC |
|
|
No activity at site. Wetland area relocation complete, will check for re-establishment next inspection. No issues reported at site.
|
ESC16-00276
| General Inspection | 3/6/2017 | 3/6/2017 | 3/6/2017 3:46:04 PM | | PEND |
|
|
Working on corrections with SFH builder Eagle Energy Concepts and Wood Bros. excavation to get regular sweeping schedule on Tahiti. Subdivision development complete.
|
ESC15-01218
| Aging Inspection | 3/6/2017 | 3/6/2017 | 3/6/2017 3:43:22 PM | | PASS |
|
|
|
ESC17-00018
| General Inspection | 3/6/2017 | 3/6/2017 | 3/6/2017 2:56:15 PM | P | PASS |
|
|
Dewatering system for installation of stormwater ponds is now turned off. Remaining water draining into Walling Creek is clear. WIP by Higrade, who is dewatering into stormwater ponds with no offsite discharge. No violations observed, no corrections requested at this time.
|
ESC16-01561
| General Inspection | 3/6/2017 | 3/6/2017 | 3/6/2017 2:49:21 PM | P | FAIL |
|
|
Dewatering check up...
Dewatering stopped over weekend and has resumed today. Extra water onsite continues to overwhelm the land application & infliltration area. 3 discharges points occuring, the discharge outlet closest to construction area and away from Parkcenter Bridge has a turbid discharge with visible flume in Walling Creek wetland.
Notified RP to come onsite to superivise corrections. Notified Brown Consruction foreman of issue and requested to close off this outlet with issues and/or install extra filtering & damming BMPs . Brown stated turbidity samples were taken this morning...
Investigation and corrective actions in progress.
|
ESC16-01401
| BMP Violation | 3/6/2017 | 3/6/2017 | 3/6/2017 1:50:34 PM | P | FAIL |
|
|
Corrections needed:
- re-install perimeter sediment control - clean loose dirt and mud accumulated in gutter and storm drain filter mat - re-install sediment protection on storm drains - sweep sidewalks & service trash receptacle.
|
ESC15-00977
| Aging Inspection | 3/6/2017 | 3/6/2017 | 3/6/2017 1:39:27 PM | | CANC |
|
|
|
ESC16-00945
| General Inspection | 3/6/2017 | 3/6/2017 | 3/6/2017 12:19:30 PM | A | PASS |
|
|
Site currently inactive to allow drying out. Retaining wall, stormwater facility and sewer installed. No roads or gutters. Silt fence perimeter is containing loose dirt and protecting properties below site. Wire back sitl fence was good choice. Lined concrete washout on site, permit sign posted on job trailer. No trackout or discharges. No corrections at this time.
|
ESC15-00306
| General Inspection | 3/6/2017 | 3/6/2017 | 3/6/2017 9:03:39 AM | | PASS |
|
|
No construction activity occuring. Unfinished area along river bank currently submerged due to high river levels.
|
ESC16-00522
| General Inspection | 3/6/2017 | 3/6/2017 | 3/6/2017 8:09:22 AM | | CANC |
|
|
rescheduled for site final
|