ESC16-00159
| BMP Violation | 3/7/2016 | 3/7/2016 | 3/7/2016 4:45:10 PM | P | PEND |
|
|
Warm Springs Creek work was uncompleted and unstabilized before re-graded channel area started to flow after weekend rains. Runoff water passing through work area picks up loose sediment and becomes turbid.
Corrections currently in progress. Looking into diversion options and more filtering check dams downstream from work area.
No sewer work requiring dewatering is approved until plan for fixing this situation is presented.
Slight plume of turbid water was visible in Boise River where Warm Springs Creek joins across for Barber Park. Viewed at approximately 11 AM 3/7/2016; investigation and corrective actions still in progress.
|
ESC16-00109
| Site Preparation | 3/7/2016 | 3/7/2016 | 3/7/2016 4:39:39 PM | P | PASS |
|
|
Brett Phone #: ###-####
|
ESC12-00403
| General Inspection | 3/7/2016 | 3/7/2016 | 3/7/2016 3:59:33 PM | | PART |
|
|
Need to clean up trackout from the southwest entrance into complex from Myrtle @ 11th. No discharges, perimeter gutters are clean. DI bags installed.
|
ESC14-01132
| DOC - Permit Finaled | 3/7/2016 | 3/7/2016 | 3/7/2016 3:46:17 PM | P | PASS |
|
|
Parking lot landscaping and tree installation complete. No loose dirt or sediment. Private storm drains have had temp BMPs removed. ESC permit conditions satisfied.
|
ESC14-00626
| Aging Inspection | 3/7/2016 | 3/7/2016 | 3/7/2016 3:39:38 PM | | PASS |
|
|
No activity. No trackout. Yard is not landscaped, but dirt is below grade of pavement/sidewalks. No corrections issued.
|
ESC15-00082
| DOC - Permit Finaled | 3/7/2016 | 3/7/2016 | 3/7/2016 3:12:37 PM | P | PASS |
|
|
All framing is complete. Landscaping and exterior painting in progress. No further ESC inspections on this permit. Main Asheville permit ESC14-01052 and for carports ESC15-01471;open for final clean up and temp BMP removal. No violations at time of inspection.
|
ESC15-00080
| DOC - Permit Finaled | 3/7/2016 | 3/7/2016 | 3/7/2016 3:12:25 PM | P | PASS |
|
|
All framing is complete. Landscaping and exterior painting in progress. No further ESC inspections on this permit. Main Asheville permit ESC14-01052 and for carports ESC15-01471;open for final clean up and temp BMP removal. No violations at time of inspection.
|
ESC15-00079
| DOC - Permit Finaled | 3/7/2016 | 3/7/2016 | 3/7/2016 3:12:17 PM | P | PASS |
|
|
All framing is complete. Landscaping and exterior painting in progress. No further ESC inspections on this permit. Main Asheville permit ESC14-01052 and for carports ESC15-01471;open for final clean up and temp BMP removal. No violations at time of inspection.
|
ESC15-00078
| DOC - Permit Finaled | 3/7/2016 | 3/7/2016 | 3/7/2016 3:12:07 PM | P | PASS |
|
|
All framing is complete. Landscaping and exterior painting in progress. No further ESC inspections on this permit. Main Asheville permit ESC14-01052 and for carports ESC15-01471;open for final clean up and temp BMP removal. No violations at time of inspection.
|
ESC15-00077
| DOC - Permit Finaled | 3/7/2016 | 3/7/2016 | 3/7/2016 3:11:58 PM | P | PASS |
|
|
All framing is complete. Landscaping and exterior painting in progress. No further ESC inspections on this permit. Main Asheville permit ESC14-01052 and for carports ESC15-01471;open for final clean up and temp BMP removal. No violations at time of inspection.
|
ESC15-00076
| DOC - Permit Finaled | 3/7/2016 | 3/7/2016 | 3/7/2016 3:11:43 PM | P | PASS |
|
|
All framing is complete. Landscaping and exterior painting in progress. No further ESC inspections on this permit. Main Asheville permit ESC14-01052 and for carports ESC15-01471;open for final clean up and temp BMP removal. No violations at time of inspection.
|
ESC15-00070
| DOC - Permit Finaled | 3/7/2016 | 3/7/2016 | 3/7/2016 3:11:34 PM | P | PASS |
|
|
All framing is complete. Landscaping and exterior painting in progress. No further ESC inspections on this permit. Main Asheville permit ESC14-01052 and for carports ESC15-01471;open for final clean up and temp BMP removal. No violations at time of inspection.
|
ESC15-00075
| General Inspection | 3/7/2016 | 3/7/2016 | 3/7/2016 3:10:23 PM | | PASS |
|
|
All framing is complete. Landscaping and exterior painting in progress. No further ESC inspections on this permit. Main Asheville permit ESC14-01052 is still open for final clean up and temp BMP removal. No violations at time of inspection.
|
ESC15-00075
| DOC - Permit Finaled | 3/7/2016 | 3/7/2016 | 3/7/2016 3:10:12 PM | P | PASS |
|
|
|
ESC15-00074
| General Inspection | 3/7/2016 | 3/7/2016 | 3/7/2016 3:10:03 PM | | PASS |
|
|
All framing is complete. Landscaping and exterior painting in progress. No further ESC inspections on this permit. Main Asheville permit ESC14-01052 is still open for final clean up and temp BMP removal. No violations at time of inspection.
|
ESC15-00074
| DOC - Permit Finaled | 3/7/2016 | 3/7/2016 | 3/7/2016 3:09:53 PM | P | PASS |
|
|
|
ESC15-00073
| General Inspection | 3/7/2016 | 3/7/2016 | 3/7/2016 3:09:44 PM | | PASS |
|
|
All framing is complete. Landscaping and exterior painting in progress. No further ESC inspections on this permit. Main Asheville permit ESC14-01052 is still open for final clean up and temp BMP removal. No violations at time of inspection.
|
ESC15-00073
| DOC - Permit Finaled | 3/7/2016 | 3/7/2016 | 3/7/2016 3:09:34 PM | P | PASS |
|
|
|
ESC15-00072
| General Inspection | 3/7/2016 | 3/7/2016 | 3/7/2016 3:09:26 PM | | PASS |
|
|
All framing is complete. Landscaping and exterior painting in progress. No further ESC inspections on this permit. Main Asheville permit ESC14-01052 is still open for final clean up and temp BMP removal. No violations at time of inspection.
|
ESC15-00072
| DOC - Permit Finaled | 3/7/2016 | 3/7/2016 | 3/7/2016 3:09:15 PM | P | PASS |
|
|
|
ESC15-00071
| General Inspection | 3/7/2016 | 3/7/2016 | 3/7/2016 3:08:58 PM | | PASS |
|
|
All framing is complete. Landscaping and exterior painting in progress. No further ESC inspections on this permit. Main Asheville permit ESC14-01052 is still open for final clean up and temp BMP removal. No violations at time of inspection.
|
ESC15-00071
| DOC - Permit Finaled | 3/7/2016 | 3/7/2016 | 3/7/2016 3:06:48 PM | P | PASS |
|
|
|
ESC15-01103
| BMP Violation | 3/4/2016 | 3/7/2016 | 3/7/2016 3:02:22 PM | A | PASS |
|
|
check for sweep up of gutter and street
Some sweep up has occured. Now sidewalk is being removed for utilities so will need to swept again when complete,. No trackout extending down street from Darigold. Approved for now but will need sweeping several times this week
|
ESC16-00159
| Tracking Control | 3/4/2016 | 3/7/2016 | 3/7/2016 11:48:54 AM | A | PART |
|
|
Trackout being cleaned up and entrance is blocked during the muddy condtions....
|
ESC15-00729
| Tracking Control | 3/7/2016 | 3/7/2016 | 3/7/2016 10:51:24 AM | P | FAIL |
|
|
Significant trackout on Council Springs observed at 10:30 AM.
Construction entrance needs angular rock, geotextile base and should be extended as opposed to sweeping only.
Notified RP, will check back for clean up tomorrow.
|
ESC15-00023
| General Inspection | 3/7/2016 | 3/7/2016 | 3/7/2016 10:37:32 AM | | PART |
|
|
No sediment runoff. Home now complete and landscaped.
Correction: - remove DI bag in front of home now that work is complete.
|
ESC16-00119
| Site Preparation | 3/4/2016 | 3/7/2016 | 3/7/2016 10:29:39 AM | A | PASS |
|
|
Clint Phone #: ###-####
Designated lined washout installed as requested for new home in the newly active phase of East Vallley. Permit sign posted. DIs have sediment protection. RP on duty. Approved.
|
ESC16-00118
| Site Preparation | 3/4/2016 | 3/7/2016 | 3/7/2016 10:29:17 AM | A | PASS |
|
|
Clint Phone #: ###-####
Designated lined washout installed as requested for new home in the newly active phase of East Vallley. Permit sign posted. DIs have sediment protection. RP on duty. Approved.
|
ESC14-00989
| General Inspection | 3/7/2016 | 3/7/2016 | 3/7/2016 10:24:33 AM | | PASS |
|
|
No activity at site. No violations, clean site with fenced perimeter and sediment controls.
|
ESC15-00898
| DOC - Permit Finaled | 3/7/2016 | 3/7/2016 | 3/7/2016 10:15:52 AM | P | PASS |
|
|
Townhome complete. Temp BMPs for Barber Valley installed for remaining construction. No further ESC inspections on this permit. No violations observed, no corrections requested.
|
ESC15-00899
| DOC - Permit Finaled | 3/7/2016 | 3/7/2016 | 3/7/2016 10:15:31 AM | P | PASS |
|
|
Townhome complete. Temp BMPs for Barber Valley installed for remaining construction. No further ESC inspections on this permit. No violations observed, no corrections requested.
|
ESC15-01048
| DOC - Permit Finaled | 3/7/2016 | 3/7/2016 | 3/7/2016 10:15:09 AM | P | PASS |
|
|
Townhome complete. Temp BMPs for Barber Valley installed for remaining construction. No further ESC inspections on this permit. No violations observed, no corrections requested.
|
ESC15-01047
| DOC - Permit Finaled | 3/7/2016 | 3/7/2016 | 3/7/2016 10:14:24 AM | P | PASS |
|
|
Townhome complete. Temp BMPs for Barber Valley installed for remaining construction. No further ESC inspections on this permit. No violations observed, no corrections requested.
|
ESC16-00012
| Site Preparation | 3/7/2016 | 3/7/2016 | 3/7/2016 10:08:15 AM | A | PASS |
|
|
Inspection requested via web by Kyle Buzzell
RP on site. No trackout from construciton area and no discahrges. DI bags and lined concrete washout being maintained. Approved.
|
ESC16-00064
| Site Preparation | 3/7/2016 | 3/7/2016 | 3/7/2016 10:07:56 AM | A | PASS |
|
|
Inspection requested via web by Kyle Buzzell
RP on site. No trackout from construciton area and no discahrges. DI bags and lined concrete washout being maintained. Approved.
|
ESC16-00065
| Site Preparation | 3/7/2016 | 3/7/2016 | 3/7/2016 10:07:36 AM | A | PASS |
|
|
Inspection requested via web by Kyle Buzzell
RP on site. No trackout from construciton area and no discahrges. DI bags and lined concrete washout being maintained. Approved.
|
ESC16-00063
| Site Preparation | 3/7/2016 | 3/7/2016 | 3/7/2016 10:07:11 AM | A | PASS |
|
|
Inspection requested via web by Kyle Buzzell
RP on site. No trackout from construciton area and no discahrges. DI bags and lined concrete washout being maintained. Approved.
|
ESC14-00594
| Aging Inspection | 3/7/2016 | 3/7/2016 | 3/7/2016 9:43:15 AM | | PASS |
|
|
WIP on vertical framing and interior work at the District. Rock construction entrance and rumble bars installed; apron to Parkcenter was swept last week. No trackout at time of inspection. No dewatering or irrigation water flowing through site currently.
Correction request for this week: - turn over rock entrance to shake off dirt that is packed in. More rock may be necessary. - have street sweeper hit the sand & dirt in gutters.
|
ESC14-00593
| Aging Inspection | 3/7/2016 | 3/7/2016 | 3/7/2016 9:43:03 AM | | PASS |
|
|
WIP on vertical framing and interior work at the District. Rock construction entrance and rumble bars installed; apron to Parkcenter was swept last week. No trackout at time of inspection. No dewatering or irrigation water flowing through site currently.
Correction request for this week: - turn over rock entrance to shake off dirt that is packed in. More rock may be necessary. - have street sweeper hit the sand & dirt in gutters.
|
ESC14-00592
| Aging Inspection | 3/7/2016 | 3/7/2016 | 3/7/2016 9:42:50 AM | | PASS |
|
|
WIP on vertical framing and interior work at the District. Rock construction entrance and rumble bars installed; apron to Parkcenter was swept last week. No trackout at time of inspection. No dewatering or irrigation water flowing through site currently.
Correction request for this week: - turn over rock entrance to shake off dirt that is packed in. More rock may be necessary. - have street sweeper hit the sand & dirt in gutters.
|
ESC14-00591
| Aging Inspection | 3/7/2016 | 3/7/2016 | 3/7/2016 9:42:35 AM | | PASS |
|
|
WIP on vertical framing and interior work at the District. Rock construction entrance and rumble bars installed; apron to Parkcenter was swept last week. No trackout at time of inspection. No dewatering or irrigation water flowing through site currently.
Correction request for this week: - turn over rock entrance to shake off dirt that is packed in. More rock may be necessary. - have street sweeper hit the sand & dirt in gutters.
|
ESC15-01552
| Random Inspection | 3/7/2016 | 3/7/2016 | 3/7/2016 9:38:52 AM | P | PASS |
|
|
WIP. No trackout, construction entrance installed. MS4 on River has inlet bag protection. Clean site, good waste management and housekeeping.
|
ESC14-01132
| General Inspection | 3/7/2016 | 3/7/2016 | 3/7/2016 8:54:17 AM | | PASS |
|
|
|