ESC16-01401
| General Inspection | 3/6/2017 | 3/7/2017 | 3/9/2017 9:10:54 AM | P | CANC |
|
|
|
ESC16-00189
| General Inspection | 3/7/2017 | 3/7/2017 | 3/8/2017 7:45:59 AM | | CANC |
|
|
|
ESC15-00857
| General Inspection | 3/7/2017 | 3/7/2017 | 3/7/2017 5:51:48 PM | P | PEND |
|
|
No new erosion issues, no active runoff. No construction activity or sources of trackout. Slopes and ground still very muddy and soft.
Parcel above mudslide to Arrow Villa now has drainage trenches to drain water to sediment basin to the north in EC #9, away from lot from slope to the south. Plans for slope repair were mentioned to be awaiting drier ground conditions. Conditions currently very muddy to walk or get equipment on - could cause more damage.
Corrective actions: - work on re-installing compost wattle check dams along both sides of Arrrow Villa that are no longer in contact with bottom of channel. Remove sediment and mud from behind existing check dams. - considering installing channel stabilization BMP , rock or turf re-enforcement matting, another application of hyroseed
|
ESC14-01063
| General Inspection | 3/7/2017 | 3/7/2017 | 3/7/2017 5:26:21 PM | P | PEND |
|
|
No discharges, no trackout to streets. Site is currently inactive. Storm drain inlets at Goshawk and Arrow Villa have had new sediment protection installed. Some clean up still remains.
Corrections to be worked on in preparation for spring: - remove discarded BMPs and construction debris from site, including wind blown trash. Straw from wattles could potentially be salvaged for re-use as ground cover mulch for areas with no vegetation - inspect and secure existing silt fence to stakes, remove collected silt and mud from behind fence. - inspect all existing perimeter wattles and repair as necessary. Do not disturb existing vegetative buffers. - prepare for SFH construction in Spring; re-install concrete washout and clean up existing area. Will need stabilized entrance or new location - portable washout containment or offsite disposal options should be considered
|
ESC16-01006
| Conference | 3/1/2017 | 3/7/2017 | 3/7/2017 4:26:00 PM | A | PEND |
|
|
Milwell Park conference & investigation.
Wood Brothers to continue street sweeping operations. Trackout and loose debris from last week has been cleaned.
Still need to provide designated concrete washout facilitiy or have concrete trucks take back to their cement plant.
Now working with Wood River to get permit issued for Millwell Phase 2. Currently active installing new irrigation ditch piping. SWPPP is reportedly complete but has not been reviewed by ESC division.
|
ESC17-00002
| General Inspection | 3/3/2017 | 3/7/2017 | 3/7/2017 4:00:57 PM | A | PASS |
|
|
follow up on Millwell Park corrections
Permit sign posted. Street and gutter clean. Foundation installed. No new corrections.
|
ESC16-01721
| General Inspection | 3/3/2017 | 3/7/2017 | 3/7/2017 3:51:52 PM | P | PART |
|
|
Trackout was cleaned. Needs ESC permit sign to be posted.
|
ESC17-00044
| Tracking Control | 2/28/2017 | 3/7/2017 | 3/7/2017 3:33:08 PM | A | FAIL |
|
|
follow up
Trackout may have been cleaned end of last week, but continued activity has added amount of excavated dirt on sidewalk and gutter. Will allow for placement or removal of backfill
|
ESC15-00453
| General Inspection | 3/7/2017 | 3/7/2017 | 3/7/2017 3:28:00 PM | | PEND |
|
|
|
ESC16-00290
| Aging Inspection | 3/7/2017 | 3/7/2017 | 3/7/2017 10:06:23 AM | | PASS |
|
|
note - Project is at 1900 S. Philipi, not north Phillipi
|
ESC17-00072
| Site Preparation | 3/6/2017 | 3/7/2017 | 3/6/2017 3:36:12 PM | A | PASS |
|
|
Dave Phone #: ###-####
Permit sign posted. Homeowner RP. Low runoff risk, yard is vegetated. Main BMP will be house keeping
|