Inspections for the day of: Thursday, March 7, 2019.
Number of inspections: 23
Percentage of inspections complete: 87 %
Percentage of inspections not complete: 13 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-01636 BMP Violation3/7/20193/7/20193/14/2019 3:19:54 PMPCANC
ESC18-00020 General Inspection3/7/20193/7/20193/11/2019 9:15:01 AMPCANC
ESC17-01538 General Inspection3/7/20193/7/20193/8/2019 12:31:43 PM CANC
ESC18-01167 General Inspection3/7/20193/7/20193/8/2019 12:31:34 PMPCANC
ESC18-00571 Aging Inspection3/7/20193/7/20193/7/2019 3:24:32 PM CANC
ESC18-00571 DOC - Permit Finaled3/7/20193/7/20193/7/2019 3:24:26 PMPPASS
ESC18-00492 General Inspection3/7/20193/7/20193/7/2019 3:24:05 PM PASS
ESC18-00385 General Inspection3/7/20193/7/20193/7/2019 3:23:53 PM CANC
rescheduled for site final
ESC17-01491 General Inspection3/7/20193/7/20193/7/2019 3:23:17 PM PASS
ESC18-00573 Aging Inspection3/7/20193/7/20193/7/2019 3:22:56 PM PASS
Private residence pool. No issues. BLD open
ESC18-00573 DOC - Permit Finaled3/7/20193/7/20193/7/2019 3:22:27 PMPPASS
ESC17-01088 Conference3/6/20193/7/20193/7/2019 2:34:30 PMPDONE
Chad will have HOA landscapers maintain DI bags. Todd Christensen (4 lots) will provide ecopan washout for projects. Other builders to have their own washouts.

Notified them of CGP requirements for NOI and following swppp. SFHs to be permitted seperately.
ESC18-01408 Site Preparation3/6/20193/7/20193/7/2019 2:32:27 PMPCANC
rescheduled
ESC17-00774 General Inspection3/7/20193/7/20193/7/2019 11:50:36 AMPPEND
final gabion check dam north of parkcenter appears to be too high and water is not staying along the flow line and eroding the channel banks.

Will consult with engineer Dave Powell and Boise PW engineering.
ESC17-01782 General Inspection3/7/20193/7/20193/7/2019 11:33:17 AMPFAIL
Trash and dumped materials from phase 4 construction is at the south side of Old Hickory @ Parkcenter. Correction request to RP Joey to clean up by Friday 3/15. FOllow up inspection scheduled.
ESC18-00325 Aging Inspection3/7/20193/7/20193/7/2019 11:31:18 AM PASS
ESC18-00316 Aging Inspection3/7/20193/7/20193/7/2019 11:31:03 AM PASS
ESC18-01636 General Inspection3/7/20193/7/20193/7/2019 11:23:47 AMPFAIL
Dewatering with no record of turbidity or visual monitoring. Incomplete SWPPP paperwork.

Notice of discharge noted in SWPPP corrective action log was not reported to City of Boise ESC division. No ESC dewatering inspection or plan submitted.

Case pending.

Construction entrance are also not 50 ft length per ESC site plan.
ESC16-01560 General Inspection3/7/20193/7/20193/7/2019 10:28:55 AMPPASS
Stockpiling of dirt and landscaping materials and a designated concrete washout are placed within the permitted ESC area.

General maintenance request to have DI bags along BV Drive inspected and changed out as needed.
ESC17-01362 Site Final3/6/20193/7/20193/7/2019 10:27:17 AMAPASS
9:30 site walk through

All temporary BMPs onsite have been removed. Site is stabilized/landscaped, trash has been picked up around site and along Walling Creek. Onsite stormwater retention installed, consisting of permeable pavers and sand filter grassy swales.

Adjacent lot that was used for staging and dewatering system will remain an active ESC site , see ESC16-01650. Sediment filter bags along Barber Valley Drive will be inspected under this permit.

ESC permit conditions satisfied, permit finaled.
ESC17-01749 General Inspection3/7/20193/7/2019   
ESC16-00225 General Inspection3/7/20193/7/2019 P 
ESC17-00791 General Inspection3/6/20193/7/2019 P