PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Thursday, March 8, 2018
.
Number of inspections:
16
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC18-00349
General Inspection
3/6/2018
3/8/2018
3/12/2018 4:23:54 PM
A
PEND
check on status of dewatering plan
ESC17-01088
General Inspection
2/27/2018
3/8/2018
3/12/2018 11:11:33 AM
P
PASS
WIP to complete paving. No trackout or sediment runoff to Cloverdale. No fugitive dust observed
ESC17-00618
General Inspection
3/8/2018
3/8/2018
3/9/2018 4:17:28 PM
PASS
No trackout from site. Storm drains on 15th have inlet protection. Permit sign posted of fence. No loose trash or debris leaving site.
ESC15-00504
General Inspection
3/8/2018
3/8/2018
3/9/2018 4:16:32 PM
CANC
rescheduled for Site Final
ESC17-00218
Aging Inspection
3/8/2018
3/8/2018
3/9/2018 4:15:52 PM
CANC
ESC17-01465
General Inspection
3/7/2018
3/8/2018
3/9/2018 10:44:46 AM
P
PASS
No activity on parking lot. No trackout or runoff from site.
ESC15-01579
General Inspection
3/8/2018
3/8/2018
3/8/2018 4:45:25 PM
A
FAIL
Site walk around inspection conducted:
- loose construction trash visible around perimeter of site in vegetation along Walling Creek. Some foam board pieces observed in creek.
- loose trash blown under Parkcenter Bridge in MA Williams Park.
- signifcant amout of dog poop along pathway (presumably from new Arboretum tennants). Will give notice to facility managment.
- trash log sheet that was required due to previous issues at site had not been signed since the week of Feb. 11-17th
No trackout or runoff observed from site.
Verbal Correction to project manager Sean and Pentalon crew member Jeff to immediately have trash pick up walk around the site and along the banks and to remember to complete trash log sign off sheet.
ESC16-00936
General Inspection
3/8/2018
3/8/2018
3/8/2018 4:26:50 PM
PART
Trash contained, no trackout, no new hillside or slope erosion observed.
Correction request to install perimeter wattle on the disturbed yard above to prevent muddy runoff down driveway to Skylark
ESC17-00663
Aging Inspection
3/8/2018
3/8/2018
3/8/2018 10:45:39 AM
PEND
no new activity
ESC17-00499
Aging Inspection
3/8/2018
3/8/2018
3/8/2018 10:45:01 AM
PASS
Home completed in Sept. CBH to remove any temporary BMPs in subdivision upon completion of all parcels
ESC17-00499
DOC - Permit Finaled
3/8/2018
3/8/2018
3/8/2018 10:44:06 AM
P
PASS
ESC17-01694
BMP Violation
3/7/2018
3/8/2018
3/8/2018 10:43:46 AM
P
PEND
RP called to inform that corrections are now in progress:
- picking up trash and debris
- broom sweep sidewalk and gutter
- DI bag within subdivision has been emptied and reinstalled.
- street sweeper scheduled for this evening
- ESC permit signs to be posted
- concrete washout to be installed
- new gravel turnaround area to reduce tracking
Compliance conference scheduled for 10 AM Friday
ESC03-00692
DOC - Permit Finaled
3/8/2018
3/8/2018
3/8/2018 9:56:51 AM
P
PASS
ESC04-00369
DOC - Permit Finaled
3/8/2018
3/8/2018
3/8/2018 9:56:46 AM
P
PASS
ESC04-00344
DOC - Permit Finaled
3/8/2018
3/8/2018
3/8/2018 9:56:26 AM
P
PASS
ESC04-00653
DOC - Permit Finaled
3/8/2018
3/8/2018
3/8/2018 9:55:35 AM
P
PASS