PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Tuesday, April 10, 2018
.
Number of inspections:
14
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC17-01600
Site Preparation
4/10/2018
4/10/2018
4/12/2018 2:53:08 PM
P
PEND
Site check for drainage concerns Phone #: ###-####
Luann - ###-#### adjacent property owner
Need to install roof drains
ESC17-00692
General Inspection
4/6/2018
4/10/2018
4/12/2018 8:17:46 AM
A
CANC
ESC18-00521
General Inspection
4/3/2018
4/10/2018
4/12/2018 8:13:11 AM
P
CANC
ESC16-00489
General Inspection
4/10/2018
4/10/2018
4/12/2018 8:12:22 AM
CANC
ESC17-00063
General Inspection
4/10/2018
4/10/2018
4/12/2018 8:12:10 AM
CANC
ESC16-01232
General Inspection
4/10/2018
4/10/2018
4/11/2018 4:04:02 PM
PEND
revegetation still occuring @ back side along Shaw Mtn Road.
ESC18-00440
BMP Violation
4/9/2018
4/10/2018
4/10/2018 4:35:06 PM
A
PEND
Onsite conference to reveiew ESC permit conditions and request installation of wattle below the stockpile. Stockpile is to be removed this week or next. Will be responsible for any post construction stabilization.
ESC18-00264
General Inspection
3/29/2018
4/10/2018
4/10/2018 4:34:00 PM
P
PASS
WIP on hillside erosion controls. Check dams installed along unfinished driveway. DI bags down hill removed to capture all runoff from site in Sherman Hollow stormwater system.
ESC17-00072
Aging Inspection
4/10/2018
4/10/2018
4/10/2018 10:58:34 AM
PASS
ESC17-01701
General Inspection
4/10/2018
4/10/2018
4/10/2018 10:28:08 AM
A
CANC
duplicate entry
ESC17-01701
General Inspection
4/10/2018
4/10/2018
4/10/2018 10:27:34 AM
P
PASS
WIP on Franklin Park. Sidwalk being poured, road is partially excavated for resurfacing. Concrete washout pan onsite and being used. No trackout or discharges observed.
ESC17-00842
Conference
4/10/2018
4/10/2018
4/10/2018 8:26:25 AM
P
DONE
Site walk through with RP and Syman Company completed @ 2 PM Monday 4/9 to discuss corrective actions to prevent further sediment runoff and slow down runoff velocity. BMPs to be installed Tuesday PM and hydroseed on Wednesday.
ESC17-00591
General Inspection
4/10/2018
4/10/2018
4/10/2018 8:08:40 AM
CANC
ESC17-00779
Aging Inspection
4/10/2018
4/10/2018
4/10/2018 8:08:03 AM
CANC