ESC15-01210
| Complaint Inspection | 4/12/2016 | 4/12/2016 | 4/12/2016 4:32:04 PM | P | PASS |
|
|
Dust complaint from neighbor stating dust is really bad. no water truck onsite
No significant dust at time of inspection. WIP on installing sewer and storm water retention facilities. Water truck parked in upper area but was not in use.
Issued warning/reminder to RP Pat, who was on site, to be aware of dust and to have water truck available to spray areas such as haul roads and stockpiles with dust supression water. Also stated that the disturbed hillside around the perimeter still requires either permanent or temporary stabilization ASAP. Pat said Syman Co. will
|
ESC03-00512
| DOC - Permit Finaled | 4/12/2016 | 4/12/2016 | 4/12/2016 4:20:56 PM | P | PASS |
|
|
old expired permit removed from system
|
ESC03-01055
| DOC - Permit Finaled | 4/12/2016 | 4/12/2016 | 4/12/2016 4:20:48 PM | P | PASS |
|
|
old expired permit removed from system
|
ESC04-00789
| DOC - Permit Finaled | 4/12/2016 | 4/12/2016 | 4/12/2016 4:20:41 PM | P | PASS |
|
|
old expired permit removed from system
|
ESC15-01128
| Aging Inspection | 4/12/2016 | 4/12/2016 | 4/12/2016 4:19:59 PM | | PASS |
|
|
All permits finaled. Home complete and stabilized, no sediment leaving site. ESC permit conditions met.
|
ESC15-01128
| DOC - Permit Finaled | 4/12/2016 | 4/12/2016 | 4/12/2016 4:18:37 PM | P | PASS |
|
|
|
ESC15-01100
| General Inspection | 4/12/2016 | 4/12/2016 | 4/12/2016 3:34:13 PM | | PASS |
|
|
Disturbed area for water line has been hydroseeded and grass in establishing. Not yet > 70% stabilization. Sediment control wattle is installed at toe of slope. No corrections at this time, will contiue to monitor.
|
ESC15-00831
| Aging Inspection | 4/12/2016 | 4/12/2016 | 4/12/2016 2:59:08 PM | | PASS |
|
|
No construction activity or disturbed area at site. Home is landscaped and occupied, no sediment leaving site. BLD still open, ESC permit finaled.
|
ESC15-00831
| DOC - Permit Finaled | 4/12/2016 | 4/12/2016 | 4/12/2016 2:58:20 PM | P | PASS |
|
|
|
ESC15-00422
| General Inspection | 4/12/2016 | 4/12/2016 | 4/12/2016 2:44:46 PM | | CANC |
|
|
|
ESC15-00817
| General Inspection | 4/12/2016 | 4/12/2016 | 4/12/2016 1:57:07 PM | | PASS |
|
|
|
ESC15-01579
| Complaint Inspection | 4/12/2016 | 4/12/2016 | 4/12/2016 1:31:26 PM | P | PEND |
|
|
report of dewatering, check for dewatering plan and setup...
dewatering in progress to place the first sewer connection. RP Jason was not aware of dewatering so requested he make sure that the contractor has a plan and is aware of the discharge water quality standards.
Currently a single pump is drawing water out of ground and discharging into a channel built within site. Water flow to the rest of the site that has a earthen berm perimeter. Plan is to allow water to re-infiltrate rather than disharge. Berm currently retaining water, some water is seeping through and going to the grassy park area.
Issued warning about not pumping or allowing untreated water into the Walling Creek tributary to the Boise River. Will continue to monitor. Onsite contact Kyle stated that after today, dewatering will stop for several days until plans are confirmed.
|
ESC16-00390
| Site Preparation | 4/11/2016 | 4/12/2016 | 4/12/2016 11:30:03 AM | A | PASS |
|
|
Cameron Phone #: ###-####
Permit sign posted. Sediment protection installed on receiving storm drain. Active projects are in compliance and clean. Approved for construction.
|
ESC15-01187
| DOC - Permit Finaled | 4/12/2016 | 4/12/2016 | 4/12/2016 10:25:10 AM | P | PASS |
|
|
Home complete, landscaped, and listed for sale. ESC permit conditions satisfied.
|
ESC15-01460
| DOC - Permit Finaled | 4/12/2016 | 4/12/2016 | 4/12/2016 10:23:46 AM | P | PASS |
|
|
Home complete and landscaped. No temp BMP removal required due to active construction on Woodland. Subdivision near completion. No ESC corrections needed.
|
ESC15-01330
| DOC - Permit Finaled | 4/12/2016 | 4/12/2016 | 4/12/2016 10:21:46 AM | P | PASS |
|
|
Home complete, landscaped and occupied. Some dirt in gutter from adjacent active project by same builder will be swept this week. No further inspections on this permit.
|
ESC15-00951
| Aging Inspection | 4/12/2016 | 4/12/2016 | 4/12/2016 10:19:34 AM | | PASS |
|
|
Grading, utility, and road built. Parcels ready for SFHs. No construction occuring. Sediment filter bag installed on the newly installed storm drain on Linda Vista. No violations, no corrections needed at this time.
|
ESC15-01134
| General Inspection | 4/12/2016 | 4/12/2016 | 4/12/2016 10:04:57 AM | | PASS |
|
|
Parking lot re-paving and drainage swale are complete. No construction materials or loose sediment onsite. No impact on irrigation ditch. ESC permit conditions satisfied.
|
ESC15-01134
| DOC - Permit Finaled | 4/12/2016 | 4/12/2016 | 4/12/2016 10:04:01 AM | P | PASS |
|
|
|
ESC15-01105
| General Inspection | 4/12/2016 | 4/12/2016 | 4/12/2016 9:22:42 AM | | PASS |
|
|
No construction. No remaining earth disturbance or sediment leaving cell tower area. ESC permit finaled.
|
ESC15-01105
| DOC - Permit Finaled | 4/12/2016 | 4/12/2016 | 4/12/2016 9:22:10 AM | P | PASS |
|
|
|
ESC15-00336
| General Inspection | 4/12/2016 | 4/12/2016 | 4/12/2016 8:43:39 AM | | PASS |
|
|
WIP on last building of Cordillera #2. Stormwater from area of construction drains to onsite DIs with sediment filter bags installed.
No trackout to Five Mile, no windblown trash or materials leaving project area.
Will need to do final sweep up and removal of temp BMPs to get ESC final.
Note: Andersen Construction no longer on job, now Summit Development. .
|