ESC15-00142
| General Inspection | 4/14/2016 | 4/14/2016 | 4/15/2016 4:23:44 PM | | PASS |
|
|
|
ESC15-00916
| General Inspection | 4/14/2016 | 4/14/2016 | 4/15/2016 2:54:07 PM | P | PASS |
|
|
Landscaping road & sidewalk medians currently. Open lots have volunteer plants growing well and stabilizing dirt. No windblown dust, no trackout. No sfh construction yet. No corrections at this time.
|
ESC15-00261
| Site Final | 4/14/2016 | 4/14/2016 | 4/15/2016 1:21:45 PM | P | NR |
|
|
Need to stabilize disturbed shoulder area and sweep bike lane...
No sediment leaving site, all other permits finaled.
|
ESC15-01116
| Aging Inspection | 4/14/2016 | 4/14/2016 | 4/15/2016 1:07:49 PM | | PASS |
|
|
In process of being landscaped and will need final sidewalk cleanup. BLD already finaled, will check back next week for Final.
|
ESC15-01115
| Aging Inspection | 4/14/2016 | 4/14/2016 | 4/15/2016 1:07:39 PM | | PASS |
|
|
In process of being landscaped and will need final sidewalk cleanup. BLD already finaled, will check back next week for Final.
|
ESC15-01032
| Aging Inspection | 4/14/2016 | 4/14/2016 | 4/15/2016 1:07:19 PM | | PASS |
|
|
In process of being landscaped and will need final sidewalk cleanup. BLD already finaled, will check back next week for Final.
|
ESC15-00950
| Site Final | 4/14/2016 | 4/14/2016 | 4/15/2016 7:07:48 AM | P | CANC |
|
|
rescheduled
|
ESC16-00161
| Site Preparation | 4/14/2016 | 4/14/2016 | 4/14/2016 4:22:52 PM | P | PASS |
|
|
WIP on frame. Permit sign posted. No trackout or sediment runoff. Approved.
|
ESC13-00443
| DOC - Permit Finaled | 4/14/2016 | 4/14/2016 | 4/14/2016 4:21:51 PM | P | PASS |
|
|
Parcel is cleared of stockpiles and is stabilized. Ready for future construction. No activity or associated BLD
|
ESC15-01150
| Aging Inspection | 4/14/2016 | 4/14/2016 | 4/14/2016 4:20:58 PM | | PASS |
|
|
Foundation is poured. Open parcel between project and Hilton has vegetated. Site is in compliance
|
ESC16-00159
| General Inspection | 4/14/2016 | 4/14/2016 | 4/14/2016 2:14:57 PM | P | PART |
|
|
Sewer and storm water infrastructure installed. Warm Springs Creek coffer dam and hardpipe is still installed to convey water over the recently widened creek. The creek bed has been hydroseeded to establish vegetation.
Minimal activity occuring at time of inspection, no trackout or discharges observed. No fugitive dust.
Need to work with Tahoe Homes and Hunter Homes to get windblown trash out of the creek area.
|
ESC14-00657
| General Inspection | 4/14/2016 | 4/14/2016 | 4/14/2016 1:54:59 PM | | PASS |
|
|
|
ESC13-00793
| Site Final | 4/14/2016 | 4/14/2016 | 4/14/2016 12:24:04 PM | P | PASS |
|
|
All equipment materials and other items have been demobilized. No sediment leaving site.
Petra has turned land back to Riverstone School. No further ESC inspections needed.
|
ESC15-00257
| DOC - Permit Finaled | 4/14/2016 | 4/14/2016 | 4/14/2016 12:12:21 PM | P | PASS |
|
|
Home complete, landscaped, and cleaned. Temp BMPs on Brookridge at Wolf Tree shall remain untill at Hunter Homes on block are complete. No violations. All permits finaled.
|
ESC15-01331
| DOC - Permit Finaled | 4/14/2016 | 4/14/2016 | 4/14/2016 12:11:29 PM | P | PASS |
|
|
Home complete, landscaped, and cleaned. Temp BMPs on Brookridge at Wolf Tree shall remain untill at Hunter Homes on block are complete. No violations. All permits finaled.
|
ESC15-01329
| DOC - Permit Finaled | 4/14/2016 | 4/14/2016 | 4/14/2016 12:10:46 PM | P | PASS |
|
|
Home complete, landscaped, and cleaned. Temp BMPs on Brookridge at Wolf Tree shall remain untill at Hunter Homes on block are complete. No violations. All permits finaled.
|
ESC15-01328
| DOC - Permit Finaled | 4/14/2016 | 4/14/2016 | 4/14/2016 12:10:19 PM | P | PASS |
|
|
Home complete, landscaped, and cleaned. Temp BMPs on Brookridge at Wolf Tree shall remain untill at Hunter Homes on block are complete. No violations. All permits finaled.
|
ESC15-01040
| Site Preparation | 4/13/2016 | 4/14/2016 | 4/14/2016 12:08:11 PM | A | PASS |
|
|
Clint Phone #: ###-####
Permit sign posted. Active construction on both sides of lot. Subdivision BMPs are installed, including inlet protection, lined washout pit, and regular house keeping/RP supervision. Approved.
|
ESC15-01579
| General Inspection | 4/14/2016 | 4/14/2016 | 4/14/2016 12:02:49 PM | P | PASS |
|
|
Dewatering for sewer installation is in progress. Water from initial pumping has stayed on site within the bermed area and appears to be infiltrating at a decent rate.
There is a slight flow through vegetated strip, silt fence, and across the Greenbelt path. The water looks clear and does not appeart to be reaching Walling Creek. I recommended that water be directed instead to the large grassy area to the south of the site in between project and River. Jim with Cougar agreed and will work on that.
|
ESC14-01083
| Conference | 4/14/2016 | 4/14/2016 | 4/14/2016 11:56:47 AM | P | PASS |
|
|
Review of dewatering plan implementation and continuation of the Barber Valley townhomes subdivision.
Dewatering by one pump to connect to exsiting sewer is occuring. Water flows into conveyance trench approx. 120 meters into a serious of 3 lined settling ponds. The system can overflow to a bermed flat area to the west of site. If it does not infiltrate the water will pass through some vegetation and straw wattle to reach the swale in the park.
Set up looks good, Brown Construction is monitoring flows. Plan approved by ESC divsion office and associated fees were paid.
|
ESC15-00360
| General Inspection | 4/14/2016 | 4/14/2016 | 4/14/2016 10:55:30 AM | | PEND |
|
|
Home complete. Site is over 70% vegetated. No sediment leaving site.
Hillside bond issued for stabilzation/ revegetation. Small rill from rooftop runoff should be addressed to prevent future discharges or sediment runoff to Wind Dancer.
|
ESC15-00221
| General Inspection | 4/14/2016 | 4/14/2016 | 4/14/2016 10:12:38 AM | | PASS |
|
|
Near completion, final touches and landscaping in progress. No violations.
|
ESC15-00210
| General Inspection | 4/14/2016 | 4/14/2016 | 4/14/2016 9:29:36 AM | | PASS |
|
|
Home complete, landscaped, and occupied. Hillside banks around yard have been hydroseeded. No loose sediment or materials on site. ESC permit satisfied
|
ESC15-00210
| DOC - Permit Finaled | 4/14/2016 | 4/14/2016 | 4/14/2016 9:28:45 AM | P | PASS |
|
|
|