Inspections for the day of: Thursday, April 14, 2016.
Number of inspections: 24
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-00142 General Inspection4/14/20164/14/20164/15/2016 4:23:44 PM PASS
ESC15-00916 General Inspection4/14/20164/14/20164/15/2016 2:54:07 PMPPASS
Landscaping road & sidewalk medians currently. Open lots have volunteer plants growing well and stabilizing dirt. No windblown dust, no trackout. No sfh construction yet. No corrections at this time.
ESC15-00261 Site Final4/14/20164/14/20164/15/2016 1:21:45 PMPNR
Need to stabilize disturbed shoulder area and sweep bike lane...

No sediment leaving site, all other permits finaled.
ESC15-01116 Aging Inspection4/14/20164/14/20164/15/2016 1:07:49 PM PASS
In process of being landscaped and will need final sidewalk cleanup. BLD already finaled, will check back next week for Final.
ESC15-01115 Aging Inspection4/14/20164/14/20164/15/2016 1:07:39 PM PASS
In process of being landscaped and will need final sidewalk cleanup. BLD already finaled, will check back next week for Final.
ESC15-01032 Aging Inspection4/14/20164/14/20164/15/2016 1:07:19 PM PASS
In process of being landscaped and will need final sidewalk cleanup. BLD already finaled, will check back next week for Final.
ESC15-00950 Site Final4/14/20164/14/20164/15/2016 7:07:48 AMPCANC
rescheduled
ESC16-00161 Site Preparation4/14/20164/14/20164/14/2016 4:22:52 PMPPASS
WIP on frame. Permit sign posted. No trackout or sediment runoff. Approved.
ESC13-00443 DOC - Permit Finaled4/14/20164/14/20164/14/2016 4:21:51 PMPPASS
Parcel is cleared of stockpiles and is stabilized. Ready for future construction. No activity or associated BLD
ESC15-01150 Aging Inspection4/14/20164/14/20164/14/2016 4:20:58 PM PASS
Foundation is poured. Open parcel between project and Hilton has vegetated. Site is in compliance
ESC16-00159 General Inspection4/14/20164/14/20164/14/2016 2:14:57 PMPPART
Sewer and storm water infrastructure installed. Warm Springs Creek coffer dam and hardpipe is still installed to convey water over the recently widened creek. The creek bed has been hydroseeded to establish vegetation.

Minimal activity occuring at time of inspection, no trackout or discharges observed. No fugitive dust.

Need to work with Tahoe Homes and Hunter Homes to get windblown trash out of the creek area.

ESC14-00657 General Inspection4/14/20164/14/20164/14/2016 1:54:59 PM PASS
ESC13-00793 Site Final4/14/20164/14/20164/14/2016 12:24:04 PMPPASS
All equipment materials and other items have been demobilized. No sediment leaving site.

Petra has turned land back to Riverstone School. No further ESC inspections needed.
ESC15-00257 DOC - Permit Finaled4/14/20164/14/20164/14/2016 12:12:21 PMPPASS
Home complete, landscaped, and cleaned. Temp BMPs on Brookridge at Wolf Tree shall remain untill at Hunter Homes on block are complete. No violations. All permits finaled.
ESC15-01331 DOC - Permit Finaled4/14/20164/14/20164/14/2016 12:11:29 PMPPASS
Home complete, landscaped, and cleaned. Temp BMPs on Brookridge at Wolf Tree shall remain untill at Hunter Homes on block are complete. No violations. All permits finaled.
ESC15-01329 DOC - Permit Finaled4/14/20164/14/20164/14/2016 12:10:46 PMPPASS
Home complete, landscaped, and cleaned. Temp BMPs on Brookridge at Wolf Tree shall remain untill at Hunter Homes on block are complete. No violations. All permits finaled.
ESC15-01328 DOC - Permit Finaled4/14/20164/14/20164/14/2016 12:10:19 PMPPASS
Home complete, landscaped, and cleaned. Temp BMPs on Brookridge at Wolf Tree shall remain untill at Hunter Homes on block are complete. No violations. All permits finaled.
ESC15-01040 Site Preparation4/13/20164/14/20164/14/2016 12:08:11 PMAPASS
Clint Phone #: ###-####

Permit sign posted. Active construction on both sides of lot. Subdivision BMPs are installed, including inlet protection, lined washout pit, and regular house keeping/RP supervision. Approved.
ESC15-01579 General Inspection4/14/20164/14/20164/14/2016 12:02:49 PMPPASS
Dewatering for sewer installation is in progress. Water from initial pumping has stayed on site within the bermed area and appears to be infiltrating at a decent rate.

There is a slight flow through vegetated strip, silt fence, and across the Greenbelt path. The water looks clear and does not appeart to be reaching Walling Creek. I recommended that water be directed instead to the large grassy area to the south of the site in between project and River. Jim with Cougar agreed and will work on that.
ESC14-01083 Conference4/14/20164/14/20164/14/2016 11:56:47 AMPPASS
Review of dewatering plan implementation and continuation of the Barber Valley townhomes subdivision.

Dewatering by one pump to connect to exsiting sewer is occuring. Water flows into conveyance trench approx. 120 meters into a serious of 3 lined settling ponds. The system can overflow to a bermed flat area to the west of site. If it does not infiltrate the water will pass through some vegetation and straw wattle to reach the swale in the park.

Set up looks good, Brown Construction is monitoring flows. Plan approved by ESC divsion office and associated fees were paid.
ESC15-00360 General Inspection4/14/20164/14/20164/14/2016 10:55:30 AM PEND
Home complete. Site is over 70% vegetated. No sediment leaving site.

Hillside bond issued for stabilzation/ revegetation. Small rill from rooftop runoff should be addressed to prevent future discharges or sediment runoff to Wind Dancer.

ESC15-00221 General Inspection4/14/20164/14/20164/14/2016 10:12:38 AM PASS
Near completion, final touches and landscaping in progress. No violations.
ESC15-00210 General Inspection4/14/20164/14/20164/14/2016 9:29:36 AM PASS
Home complete, landscaped, and occupied. Hillside banks around yard have been hydroseeded. No loose sediment or materials on site. ESC permit satisfied
ESC15-00210 DOC - Permit Finaled4/14/20164/14/20164/14/2016 9:28:45 AMPPASS