ESC16-01472
| General Inspection | 4/15/2019 | 4/15/2019 | 4/18/2019 11:14:39 AM | | PART |
|
|
No new discharges or breaches of perimter controls.
Correction request to install concrete washout for a cement work. And to repair wattles that current crew is in process of destroying.
|
ESC17-00190
| General Inspection | 4/15/2019 | 4/15/2019 | 4/17/2019 4:17:08 PM | | PASS |
|
|
|
ESC18-00114
| Aging Inspection | 4/15/2019 | 4/15/2019 | 4/16/2019 8:27:10 AM | | PEND |
|
|
BLD and other permits still open; DI bag stilll. Construction complete and home occupied.
|
ESC18-01244
| BMP Violation | 4/12/2019 | 4/15/2019 | 4/15/2019 4:55:59 PM | A | FAIL |
|
|
Corrections completed: -sidwalk was swept, perimeter wattles re-installed along front - gravel check bag dams were cleaned. Still some mud behind them.
Corrections not complete: - Trash not emptied or picked up - washout from stucco and other materials dumped around trash pile, front yard, next to driveway - fees/fines assessed not paid before compliance date, no request for extension from RP-GC.
Stop Work Order posted. RP notified by phone. SWO due to uncompleted corrections as listed in the NOV and previous inspection report.
|
ESC18-00020
| Conference | 4/8/2019 | 4/15/2019 | 4/15/2019 12:26:05 PM | P | CANC |
|
|
1:30 site walk through
Rescheduled per Hunter Homes
|
ESC17-00875
| Aging Inspection | 4/15/2019 | 4/15/2019 | 4/15/2019 12:25:08 PM | | CANC |
|
|
|
ESC18-01022
| Complaint Inspection | 4/15/2019 | 4/15/2019 | 4/15/2019 12:24:51 PM | P | DONE |
|
|
report of leaking pipe at entrance draining out of entrance area
Leaking pipe under HOA landscaping authority. Notified RP and HOA. Water has been turned off.
|
ESC17-01762
| General Inspection | 4/15/2019 | 4/15/2019 | 4/15/2019 12:20:55 PM | | FAIL |
|
|
|
ESC17-01761
| General Inspection | 4/15/2019 | 4/15/2019 | 4/15/2019 12:20:46 PM | | FAIL |
|
|
No construction entrance. Lots of workers and delivery services driving through mud and puddles on site. Trackout. Washing concrete washwater into the ground
Corrections: - Install construction entrance - install lined washout facility. Post washout sign - sweep Hudson, Targee, and Federal Way SE bound.
SEE ESC17-01754 for follow up inspections
|
ESC17-01760
| General Inspection | 4/15/2019 | 4/15/2019 | 4/15/2019 12:20:35 PM | | FAIL |
|
|
No construction entrance. Lots of workers and delivery services driving through mud and puddles on site. Trackout. Washing concrete washwater into the ground
Corrections: - Install construction entrance - install lined washout facility. Post washout sign - sweep Hudson, Targee, and Federal Way SE bound.
SEE ESC17-01754 for follow up inspections
|
ESC17-01759
| General Inspection | 4/15/2019 | 4/15/2019 | 4/15/2019 12:20:24 PM | | FAIL |
|
|
No construction entrance. Lots of workers and delivery services driving through mud and puddles on site. Trackout. Washing concrete washwater into the ground
Corrections: - Install construction entrance - install lined washout facility. Post washout sign - sweep Hudson, Targee, and Federal Way SE bound.
SEE ESC17-01754 for follow up inspections
|
ESC17-01758
| General Inspection | 4/15/2019 | 4/15/2019 | 4/15/2019 12:20:12 PM | | FAIL |
|
|
No construction entrance. Lots of workers and delivery services driving through mud and puddles on site. Trackout. Washing concrete washwater into the ground
Corrections: - Install construction entrance - install lined washout facility. Post washout sign - sweep Hudson, Targee, and Federal Way SE bound.
SEE ESC17-01754 for follow up inspections
|
ESC17-01763
| General Inspection | 4/15/2019 | 4/15/2019 | 4/15/2019 12:20:00 PM | | FAIL |
|
|
No construction entrance. Lots of workers and delivery services driving through mud and puddles on site. Trackout. Washing concrete washwater into the ground
Corrections: - Install construction entrance - install lined washout facility. Post washout sign - sweep Hudson, Targee, and Federal Way SE bound.
SEE ESC17-01754 for follow up inspections
|
ESC17-01754
| BMP Violation | 4/15/2019 | 4/15/2019 | 4/15/2019 12:18:53 PM | P | FAIL |
|
|
No construction entrance. Lots of workers and delivery services driving through mud and puddles on site. Trackout. Washing concrete washwater into the ground
Corrections: - Install construction entrance - install lined washout facility. Post washout sign - sweep Hudson, Targee, and Federal Way SE bound.
|
ESC19-00315
| BMP Violation | 4/15/2019 | 4/15/2019 | 4/15/2019 10:44:56 AM | P | FAIL |
|
|
Corrections needed: - clean out mud from receiving storm drain sump - clean gutters on Spaulding and Columbus - install sediment protection on stromdrain - place porta-pot on level ground and stake down - install concrete washout asap before foundations.
VM left with RP Bobby with with Wood River
|
ESC19-00316
| BMP Violation | 4/15/2019 | 4/15/2019 | 4/15/2019 10:44:35 AM | P | FAIL |
|
|
Corrections needed: - clean out mud from receiving storm drain sump - clean gutters on Spaulding and Columbus - install sediment protection on stromdrain - place porta-pot on level ground and stake down - install concrete washout asap before foundations.
VM left with RP Bobby with with Wood River
|
ESC17-01517
| Aging Inspection | 4/15/2019 | 4/15/2019 | 4/15/2019 10:24:07 AM | | PASS |
|
|
|
ESC18-01772
| Site Preparation | 4/12/2019 | 4/15/2019 | 4/15/2019 10:21:05 AM | A | PASS |
|
|
Jay Phone #: ###-####
Permit sign posted. Lined pit concrete washout installed. Using existing paved access to site.
Existing grass buffer preserved and wattle installed on east boundary to protect irrigation/drainage ditch.
Approved.
|
ESC17-00508
| Aging Inspection | 4/15/2019 | 4/15/2019 | 4/15/2019 8:26:41 AM | | PASS |
|
|
see ESC17-00508 for site inspections. Garage and home permitted seperately.
|
ESC17-00508
| DOC - Permit Finaled | 4/15/2019 | 4/15/2019 | 4/15/2019 8:26:06 AM | P | PASS |
|
|
|
ESC17-01757
| DOC - Permit Finaled | 4/15/2019 | 4/15/2019 | 4/15/2019 8:25:45 AM | P | PASS |
|
|
see ESC17-01757 for all remaining inspections. This permit finaled
|