ESC17-01754
| BMP Violation | 4/15/2019 | 4/16/2019 | 4/19/2019 3:16:22 PM | P | PART |
|
|
follow up
Ecopan washouts installed and used. Request for empty service, new pans coming on Monday.
Rock for construction entrance not yet installed, but is staged on site. Excavator has reportedly quit.
Follow next week. No trackout to federal way, no complaints received.
|
ESC18-00073
| General Inspection | 4/16/2019 | 4/16/2019 | 4/17/2019 3:17:26 PM | | PASS |
|
|
see ESC15-00853 for remaining inspections at North HIll sub. Site is in compliance. Storm drains have sediment protection, trash containment on site, trained excavator and on site RP. Approved.
|
ESC18-00020
| Conference | 4/15/2019 | 4/16/2019 | 4/17/2019 3:17:08 PM | A | PASS |
|
|
11 AM
Corrections discussed:
- install upslope erosion and water control BMPs to minimize amount of water running down rill at center of slope on Trapper bend. - using shovels and hand held equimpment, fix rills below the Trapper rip rap and install TRM on steep slope . Maintain wattles or install check dams in drainage channel that leads down to Council Springs at the access road. - maintain wattles and BMPs from the unfinished upper section at Barber and Trapper. - check all DI bags for maintenance.
Corrections discussed with Syman Co and Hunter Homes stormwater team. Follow up in two weeks.
|
ESC18-00072
| Site Final | 4/16/2019 | 4/16/2019 | 4/17/2019 3:12:54 PM | P | PASS |
|
|
see ESC15-00853 for remaining inspections at North HIll sub. Site is in compliance. Storm drains have sediment protection, trash containment on site, trained excavator and on site RP. Approved.
|
ESC18-00071
| Site Final | 4/16/2019 | 4/16/2019 | 4/17/2019 3:12:38 PM | P | PASS |
|
|
see ESC15-00853 for remaining inspections at North HIll sub. Site is in compliance. Storm drains have sediment protection, trash containment on site, trained excavator and on site RP. Approved.
|
ESC18-01593
| General Inspection | 4/15/2019 | 4/16/2019 | 4/17/2019 2:30:53 PM | A | PASS |
|
|
project already started. No site prep requested.
BMPs installed. RP also in charge at Hawthorne and we reviewed ESC site preparation requirements.
|
ESC19-00315
| BMP Violation | 4/15/2019 | 4/16/2019 | 4/17/2019 2:28:28 PM | P | PEND |
|
|
RP called to notify he will work on corrections and install sediment protection on drain after cleaining out the inlet sump. Follow up scheduled
|
ESC17-01126
| General Inspection | 4/16/2019 | 4/16/2019 | 4/17/2019 2:18:36 PM | | PASS |
|
|
|
ESC19-00089
| General Inspection | 4/16/2019 | 4/16/2019 | 4/17/2019 8:21:17 AM | P | CANC |
|
|
|
ESC18-01091
| BMP Violation | 4/15/2019 | 4/16/2019 | 4/17/2019 8:19:33 AM | A | PEND |
|
|
Home occupied. Walkway gate is down, fence behind yard undamaged. Home ready for site final.
|
ESC19-00289
| Site Preparation | 4/16/2019 | 4/16/2019 | 4/17/2019 8:00:17 AM | P | PASS |
|
|
MS4 inlets have sediment protection installed. Permit sign posted. Excavation/earth work to begin shortly when ground has dried out enough.
Crew is too install heavy duty rock construction entrance. Approved for construction and staging. Follow up scheduled.
|
ESC18-00417
| Aging Inspection | 4/16/2019 | 4/16/2019 | 4/16/2019 8:34:03 AM | | PASS |
|
|
No ESC issues. Other trade permits still open. ESC permit finaled.
|
ESC18-00417
| DOC - Permit Finaled | 4/16/2019 | 4/16/2019 | 4/16/2019 8:33:40 AM | P | PASS |
|
|
|
ESC18-00071
| General Inspection | 4/16/2019 | 4/16/2019 | 4/16/2019 8:32:41 AM | | CANC |
|
|
|
ESC18-00072
| General Inspection | 4/16/2019 | 4/16/2019 | 4/16/2019 8:32:17 AM | | CANC |
|
|
|
ESC17-01157
| General Inspection | 4/16/2019 | 4/16/2019 | 4/16/2019 8:28:08 AM | | CANC |
|
|
|
ESC18-00075
| General Inspection | 4/16/2019 | 4/16/2019 | 4/16/2019 8:25:47 AM | | CANC |
|
|
|