Inspections for the day of: Thursday, April 16, 2020.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-01168 General Inspection4/15/20204/16/20204/21/2020 4:36:04 PMPFAIL
Corrections needed:

- sweep Bannock between 1st & 2nd
- install perimter sediment control around stockpile on north side of road; or relocate away from gutter
- install storm drain sediment bag on 2nd street, east side of street, between Bannock and Idaho.

Follow up scheduled
-
ESC19-00292 General Inspection4/16/20204/16/20204/21/2020 4:24:34 PMPFAIL
Concrete/cement spill on Myrtle gutter. Reportedly unintentional.

Notified RP. He said he will get it cleaned up before the forecasted rain tomorrow PM. Follow up scheduled
ESC19-01084 General Inspection4/15/20204/16/20204/17/2020 4:48:06 PMAFAIL
check on dewatering

Muddy water flowing into pond. Site claims to have broken a dam in their containment system earlier in afteroon.

Plume visible in pond, no stop of work or correction seems to have been completed.

Titanium Excavation did not submit a dewatering plan as promised.

No further work until a plan is approved and different system is prepared.
ESC18-00179 General Inspection4/16/20204/16/20204/17/2020 3:59:57 PM PASS
WIP. Trash fence and inlet protection installed. NO spills, discharge, washout, or trash issues obsereved
ESC19-01297 Site Final4/16/20204/16/20204/16/2020 10:10:49 AMPPASS
Demo complete. New building in progress. See ESC19-00292.
ESC19-00618 Aging Inspection4/16/20204/16/20204/16/2020 8:33:03 AM CANC
rescheduled for site final
ESC19-00370 Aging Inspection4/16/20204/16/20204/16/2020 8:21:56 AM CANC
ESC19-00398 General Inspection4/16/20204/16/20204/16/2020 8:16:28 AM CANC