Inspections for the day of: Monday, April 18, 2016.
Number of inspections: 32
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-00147 Aging Inspection4/18/20164/18/20164/18/2016 4:20:11 PM PASS
Home complete. Yard not yet landscaped but homeowner working on irrigatin system. No trackout or discharges. Low risk; street was swept. All permits finaled.
ESC15-00147 DOC - Permit Finaled4/18/20164/18/20164/18/2016 4:19:15 PMPPASS
ESC15-00541 General Inspection4/18/20164/18/20164/18/2016 3:55:10 PM PASS
ESC14-00296 General Inspection4/18/20164/18/20164/18/2016 3:38:41 PM PASS
Perimeter of site has been swept recently, limited amount of sediment and sand on surrounding streets/gutters. All receiving DIs have inlet protection. No trackout, spills or discharges observed.
ESC14-01173 General Inspection4/18/20164/18/20164/18/2016 3:24:53 PM PASS
WiP on remodel/ renovation. No trackout or discharges to Harrison or Bethel.
ESC15-00543 General Inspection4/18/20164/18/20164/18/2016 3:15:23 PM PASS
ESC14-01063 General Inspection4/15/20164/18/20164/18/2016 2:49:41 PMPPASS
No activity or recent changes at site. Slopes of phase 8 and 9 that were hydroseeded are growing well.

Developer still needs to obtain ESC permit for any construction related activity that occurs at the parcel at Eyrie Way and Villa Ridge as requested and agreed upon in March.
ESC14-00983 General Inspection4/18/20164/18/20164/18/2016 2:24:36 PM PASS
Vertical construction now in progress. Parkling lot asphalt has been installed.

No trackout, trash containers provided, and MS4 on Opohonga has inlet protection. No corrections requested
ESC14-00694 Aging Inspection4/18/20164/18/20164/18/2016 2:00:27 PM PASS
No activitiy on BLD permit since July 2015. No oustanding ESC issues. Site retains & receives stormwater runoff. ESC permit expired and inspections no longer necessary.
ESC14-00694 DOC - Permit Finaled4/18/20164/18/20164/18/2016 1:59:13 PMPPASS
ESC15-00555 Aging Inspection4/18/20164/18/20164/18/2016 1:50:23 PM PASS
No activity on BLD since August 2015. No trackout or discharges. Addition appears complete, no earthwork, no stockpiles remaining.. Homeowner RP. No further ESC inspections necessary. Permit closed.
ESC15-00555 DOC - Permit Finaled4/18/20164/18/20164/18/2016 1:44:20 PMPPASS
ESC15-01640 Site Final4/18/20164/18/20164/18/2016 1:39:23 PMPPASS
Call me 30 minutes prior if you would like me to meet you there. Phone #: ###-#### Inspection requested via web by Eldon Oyadomari

Trench for undergound electrical line has been patched over and loose sediment swept up. No materials, temp BMPs, or loose dirt on site. Permit conditions satisfied.
ESC15-01639 DOC - Permit Finaled4/18/20164/18/20164/18/2016 1:28:00 PMPPASS
TI complete. ESC conditions satisfied. All permits finaled.
ESC15-01446 Site Final4/18/20164/18/20164/18/2016 1:11:44 PMPPASS
No active construciton or materials observed at site. Industrial area with no MS4. ESC permit finaled.
ESC16-00268 General Inspection4/18/20164/18/20164/18/2016 1:03:28 PMPPASS
WIP. on carwash improvements. Construction materials and loose sediment constained on site. No discharges or spills. Approved.
ESC15-00463 General Inspection4/18/20164/18/20164/18/2016 12:49:46 PM CANC
ESC16-00242 General Inspection4/18/20164/18/20164/18/2016 12:48:51 PMPPASS
WIP at Micron. No discharges off site, no trackout, no issues or changes to SWPPP reported. Permit posted at Gate C. No fugitive dust observed in the area.

No corrections requested.
ESC15-01621 DOC - Permit Finaled4/18/20164/18/20164/18/2016 12:46:24 PMPPASS
permit voided. See ESC16-00242
ESC14-00432 General Inspection4/18/20164/18/20164/18/2016 12:11:14 PM CANC
rescheduled
ESC16-00439 Site Preparation4/15/20164/18/20164/18/2016 12:10:10 PMAPASS
After 10 // Jill Phone #: ###-####

New subdivision development in Columbia. Flat site, desert locale.

Construction entrance is installed & SWPPP infor and permit posted.

Flat site, no perimeter BMPs - will preserve vegetation around clearing limits. No dewatering anticipated. Will need to use dust control when grubbing/grading

Approved.
ESC16-00360 Site Preparation4/15/20164/18/20164/18/2016 11:37:43 AMAPASS
Inspection requested via web by Kyle BuzzellPark Place subdivision BMPs installed. Active townhome construction in compliance. Trash and materials are contained, DIs have sediment protection, and RP is on site.

Approved for construction.

ESC16-00374 Site Preparation4/15/20164/18/20164/18/2016 11:37:18 AMAPASS
Inspection requested via web by Kyle Buzzell

Park Place subdivision BMPs installed. Active townhome construction in compliance. Trash and materials are contained, DIs have sediment protection, and RP is on site.

Approved for construction.
ESC16-00373 Site Preparation4/15/20164/18/20164/18/2016 11:36:20 AMAPASS
Inspection requested via web by Kyle Buzzell

Park Place subdivision BMPs installed. Active townhome construction in compliance. Trash and materials are contained, DIs have sediment protection, and RP is on site.

Approved for construction.
ESC13-00702 Aging Inspection4/18/20164/18/20164/18/2016 11:17:06 AM PASS
No construction activity on permit, all trades bt BLD are closed. No sediment leaving site. No further ESC inspections necessary.
ESC13-00702 DOC - Permit Finaled4/18/20164/18/20164/18/2016 11:16:27 AMPPASS
ESC16-00314 Site Preparation4/15/20164/18/20164/18/2016 10:44:55 AMAPASS
Gene Phone #: ###-####

Permit sign posted on temp power pole, flat lot with low runoff potential. Two SFHs adjacent to each other. No earthwork at time of inspection.

BMPs needed as project
- trackout controls/sweeping as needed
- trash container for BLD materials
- contain concrete washout
- make sure sub-contractor controls concrete cutting dust and slurry if applicable
- watch storm drain 1 block south at 32nd & Gavin, may require sediment bag
ESC16-00313 Site Preparation4/15/20164/18/20164/18/2016 10:44:34 AMAPASS
Gene Phone #: ###-####

Permit sign posted on temp power pole, flat lot with low runoff potential. Two SFHs adjacent to each other. No earthwork at time of inspection.

BMPs needed as project
- trackout controls/sweeping as needed
- trash container for BLD materials
- contain concrete washout
- make sure sub-contractor controls concrete cutting dust and slurry if applicable
- watch storm drain 1 block south at 32nd & Gavin, may require sediment bag
ESC15-00509 General Inspection4/18/20164/18/20164/18/2016 9:29:44 AM PASS
WIP. Hillside home near completion. Will need landscaping/stabilization and culdesac clean up for ESC final.
ESC15-00311 Aging Inspection4/18/20164/18/20164/18/2016 9:28:47 AM CANC
ESC15-00627 General Inspection4/18/20164/18/20164/18/2016 8:40:23 AM PASS
ESC03-01065 DOC - Permit Finaled4/18/20164/18/20164/18/2016 8:39:57 AMPPASS
expired permit removed from database