PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Friday, April 19, 2019
.
Number of inspections:
18
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC18-01197
BMP Violation
4/17/2019
4/19/2019
4/22/2019 12:31:24 PM
A
PEND
Still storing material in street and lots not belonging to Riverwood.
Dry conditions. Appears trash at all sites has been serviced.
ESC18-01515
BMP Violation
4/18/2019
4/19/2019
4/19/2019 4:47:17 PM
P
PASS
Site cleaned up. Sidewalks and gutters swept, trash removed. Will need to properly contain all new trash generated.
ESC19-00144
Tracking Control
4/19/2019
4/19/2019
4/19/2019 3:48:44 PM
P
FAIL
Excessive trackout from excavation and concrete prep crew. Crew did not cleanup or prevent trackout.
Harris North already warned for trackout control, special investigation fee assessed.
ESC19-00315
BMP Violation
4/17/2019
4/19/2019
4/19/2019 3:27:01 PM
P
PASS
WIP on foundation. RP installed sediment protection and cleaned up gutter on Spaulding.
Concrete pump truck at site at time of inspection. NW pumping services has been directed to washout offsite at Sunroc yard.
ESC18-01326
DOC - Permit Finaled
4/19/2019
4/19/2019
4/19/2019 2:53:20 PM
P
PASS
ESC18-01373
DOC - Permit Finaled
4/19/2019
4/19/2019
4/19/2019 2:52:11 PM
P
PASS
ESC18-01368
DOC - Permit Finaled
4/19/2019
4/19/2019
4/19/2019 2:51:22 PM
P
PASS
ESC18-01396
DOC - Permit Finaled
4/19/2019
4/19/2019
4/19/2019 2:51:11 PM
P
PASS
ESC18-01348
DOC - Permit Finaled
4/19/2019
4/19/2019
4/19/2019 2:51:03 PM
P
PASS
ESC18-01370
Site Final
4/19/2019
4/19/2019
4/19/2019 2:50:48 PM
P
PASS
BLD permit finaled. Site cleaned up and landscaped. ESC permit finaled.
ESC17-01196
General Inspection
4/19/2019
4/19/2019
4/19/2019 2:26:14 PM
CANC
ESC19-00076
Site Preparation
4/19/2019
4/19/2019
4/19/2019 2:25:12 PM
P
PASS
ESC plan and SWPPP book onsite for review. BMPs installed include:
- storm drain sediment protection installed on Pierce Park street
- perimeter wattles installed west of clearing limits
- dewatering for sewer connection infiltration basin has been excavated
- existing grass has been vegetated.
BMPs not yet installed:
- construction entrance (next week)
- concrete washout (Ecopan listed on ESC site map.
Approved for construction.
ESC18-00777
Aging Inspection
4/19/2019
4/19/2019
4/19/2019 2:21:08 PM
CANC
permit expired.
ESC18-00777
DOC - Permit Finaled
4/19/2019
4/19/2019
4/19/2019 2:20:53 PM
P
PASS
ESC17-01479
General Inspection
4/19/2019
4/19/2019
4/19/2019 2:15:48 PM
PASS
SFHs in progress. No dumped washout, trackout, or other issues observed. Couple open lots left.
ESC18-00006
General Inspection
4/19/2019
4/19/2019
4/19/2019 8:18:07 AM
CANC
RP to schedule site final within next couple weeks.
ESC18-00774
Aging Inspection
4/19/2019
4/19/2019
4/19/2019 8:17:23 AM
CANC
ESC18-01244
Stop Work Order
4/17/2019
4/19/2019
4/17/2019 4:43:28 PM
A
PASS
per Andy- stop work, please contact Andy
SWO corrections complete. Parcel hold removed.