PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Thursday, April 2, 2015
.
Number of inspections:
13
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC14-00852
General Inspection
4/2/2015
4/2/2015
4/2/2015 4:38:31 PM
PASS
ESC14-00824
General Inspection
4/2/2015
4/2/2015
4/2/2015 3:29:47 PM
PASS
Medical clinic is currently having exterior paving and curbing completed. The building fram is up and earth work for building is complete.
Perimeter wattles are installed. Site has construction fencing. No trackout or offsite discharges observed. Cement trucks are using concrete washout container (provided by Ecopan)
ESC13-01025
Aging Inspection
4/2/2015
4/2/2015
4/2/2015 3:01:22 PM
PASS
Landscaping in progress. Some materials allowed to be temporarily stored in roadway during active work.
Will check after work is completed that streets/sidewalks have been cleaned. If all is stabilized, will have DI bags in area removed.
ESC15-00360
Site Preparation
4/2/2015
4/2/2015
4/2/2015 2:21:59 PM
P
PASS
Brian Phone #: ###-####
Site walk through conducted with GC and RP. Initial site excavation of some boulders is permitted under grading permit. Site is large with many boulders that will remain onsite. Large acre parcel, main BMP will be maintaining the natural vegetaion as a buffer, whihc is the plan.
A common driveway will be constructed off of Ridge Point and will serve as the vehicle tracking pad/construction entrance once home building commences.
Permit is posted. Approved to begin work
ESC14-00859
General Inspection
4/2/2015
4/2/2015
4/2/2015 1:30:42 PM
PASS
WIP on basement expansion at MSTI. Permit posted. Staging area secured and good condion. No corrections required at this time.
ESC39-00001
Aging Inspection
4/2/2015
4/2/2015
4/2/2015 12:13:33 PM
CANC
test case ESC permit for module
ESC13-01026
Aging Inspection
4/2/2015
4/2/2015
4/2/2015 12:03:04 PM
PASS
ESC14-00941
General Inspection
4/2/2015
4/2/2015
4/2/2015 11:28:22 AM
PASS
Work on hangar is in progress. Site grading is complete, no stabilization has occured yet - no wind blown dust or fugitive dust has not become an issue - but will need to be considered as conditions become hotter & drier. No trackout, permit posted, silt fence perimeter installed in the direction of sheet flow and airport drainage system.
ESC14-00791
DOC - Permit Finaled
4/2/2015
4/2/2015
4/2/2015 10:53:16 AM
P
PASS
Grading for hangar is complete. Vertical construction in progress. Work now covered under ESC14-00941. Permit finaled.
ESC14-00923
Aging Inspection
4/2/2015
4/2/2015
4/2/2015 10:03:34 AM
PASS
Exterior facade remodel is complete. Construction materials removed and site has been cleaned. ESC conditions satisfied.
ESC14-00923
DOC - Permit Finaled
4/2/2015
4/2/2015
4/2/2015 10:01:47 AM
P
PASS
ESC14-00841
General Inspection
4/2/2015
4/2/2015
4/2/2015 9:11:23 AM
PASS
Near completion. Needs exterior stucco, interior finish, and landscaping. No trackout to Millet or hilliside erosion in the back yard.
ESC14-00529
General Inspection
4/2/2015
4/2/2015
4/2/2015 8:41:01 AM
PASS