Inspections for the day of: Thursday, April 2, 2020.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC20-00002 BMP Violation3/25/20204/2/20204/7/2020 12:06:21 PMADONE
Follow up inspection to correction requests

completed by MPZ, violations addressed.

Still need to pay fine for dumped washout
ESC19-01727 Site Preparation3/30/20204/2/20204/7/2020 12:05:14 PMPPASS
ESC19-00624 Site Final3/27/20204/2/20204/7/2020 11:54:40 AMPPASS
ESC16-00406 General Inspection4/2/20204/2/20204/6/2020 3:27:14 PM PART
DI bags on Broadstone have not been maintained/replaced as requests.

No other issues. Provided reminder to RP to have them serviced.
ESC18-00498 General Inspection4/2/20204/2/20204/6/2020 3:25:43 PM PASS
BMPs installed. No slope erosion observed. Still some work remaining on the pond common area. No spills, discharges or issues.
ESC19-00626 Aging Inspection4/2/20204/2/20204/2/2020 4:55:14 PM CANC
rescheduled for site final
ESC19-00077 Site Final4/1/20204/2/20204/2/2020 4:03:11 PMPPASS
No disturbed area, no temporary BMPs, no construction. ESC permit finaled
ESC19-00557 General Inspection4/2/20204/2/20204/2/2020 4:02:18 PM PASS
WIP in backyard. Concrete washout container staged onsite. No discharges or trackout
ESC19-00679 Aging Inspection4/2/20204/2/20204/2/2020 9:15:49 AM CANC
rescheduled for site final
ESC19-00674 Aging Inspection4/2/20204/2/20204/2/2020 9:15:19 AM CANC
rescheduled for site final
ESC18-01121 General Inspection4/2/20204/2/20204/2/2020 8:18:21 AM CANC