Inspections for the day of: Wednesday, April 20, 2016.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-01089 Aging Inspection4/20/20164/20/20164/20/2016 4:04:40 PM PASS
Disturbed area for addition is stabilized. No sediment or other material leaving site. ESC permit finaled.
ESC15-01089 DOC - Permit Finaled4/20/20164/20/20164/20/2016 4:04:02 PMPPASS
ESC15-00857 General Inspection4/20/20164/20/20164/20/2016 3:52:53 PM PASS
No significant changes to site. Construction shall resume soon. Slopes that were hydroseeded are growing well. No new erosion or rills observed.

Note - ACHD, HOA, and developer addressing concerns on the stormwater pond that receives water from this development located on Arrow Villa & Winter Camp
ESC15-00667 General Inspection4/20/20164/20/20164/20/2016 3:25:58 PM CANC
Warm Springs by-pass has been completed and in use for several months. Permit is open while shoulders vegetate and disturbed area is stabile enough to remove temporary silt fence installations. No inspection conducted at this time. Permit shall remain open.
ESC16-00302 Site Preparation4/20/20164/20/20164/20/2016 3:24:28 PMPPASS
Subdivision BMPs installed. CBH sites in Dropzone sub are in compliance. Approved for construction.
ESC15-00922 Aging Inspection4/20/20164/20/20164/20/2016 3:23:55 PM CANC
rescheduled for site final
ESC15-00973 Aging Inspection4/20/20164/20/20164/20/2016 1:05:17 PM PASS
Patio home complete. Trailwinds sub in good conditions. All permits finaled, ESC conditions satisfied.
ESC15-00973 DOC - Permit Finaled4/20/20164/20/20164/20/2016 1:04:19 PMPPASS
ESC15-00826 DOC - Permit Finaled4/20/20164/20/20164/20/2016 1:02:37 PMPPASS
Home complete, landscaped and occupied. No ESC corrections needed to meet permit conditions. Permit finaled.
ESC16-00356 BMP Violation4/20/20164/20/20164/20/2016 12:53:48 PMPFAIL
Incomplete sweep up after foundation was poured. No concrete washout containment used.

Written CN posted:
- sweep up Holden street at both site accesses.
- clean up concrete waste
- provide stabilzed construction area or leave broom on site for daily sweeping.
ESC15-00333 Aging Inspection4/20/20164/20/20164/20/2016 12:40:23 PM PASS
Home complete.

Need to finish landscaping on all recently and soon to be finished homes at Tianna Park and remove all temp BMPs.

ESC14-00928 Random Inspection4/20/20164/20/20164/20/2016 10:52:01 AMPPASS
Building frame is complete. Site perimeter is free of trackout, loose sediment, and discharges. No corrections needed. Crew in progress of working on the exterior
ESC16-00302 Site Preparation4/19/20164/20/20164/20/2016 10:29:18 AMACANC
Tracy Phone #: ###-####

rescheduled for PM
ESC15-00938 Site Preparation4/19/20164/20/20164/20/2016 10:28:20 AMAPASS
Trevor Phone #: ###-####

Cell tower building project to start. BMPs include permit signage and clean/contained staging area. Flat area with adequate staging space. Relativly small earth disturbance.

Approved.
ESC16-00294 Site Preparation4/19/20164/20/20164/20/2016 9:27:06 AMAPASS
Robert Phone #: ###-####

Ready for construction. Staging and loading area will be through alley per Robert. Requested regular sweep up and trash containment. Two portable washouts for concrete are on site.

Permit sign posted.
ESC15-01080 Aging Inspection4/20/20164/20/20164/20/2016 9:05:33 AM PASS
Project complete. All permits finaled. No ESC corrections needed at site.
ESC15-01080 DOC - Permit Finaled4/20/20164/20/20164/20/2016 9:05:02 AMPPASS
ESC14-00432 Site Preparation4/18/20164/20/20164/19/2016 10:06:34 AMPCANC
data entry error