PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Tuesday, April 21, 2020
.
Number of inspections:
17
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC19-01707
Site Final
4/21/2020
4/21/2020
4/27/2020 2:42:35 PM
P
PASS
ESC18-01273
General Inspection
4/21/2020
4/21/2020
4/23/2020 4:18:04 PM
CANC
ESC17-01088
Site Final
4/20/2020
4/21/2020
4/23/2020 4:06:31 PM
P
PASS
SWPPP sign removed as requested and broken sandbags cleaned up. DI bags left in drain for the 2-3 remaining open lots to be under construction
ESC permit finaled.
ESC19-01727
General Inspection
4/7/2020
4/21/2020
4/23/2020 3:11:11 PM
P
PASS
Rough grading complete. NO activity at time of inspection. Still need to install utilities and infrastructure. NO trackout to Lake Hazel, no wind blown dust observed.
MIS20-00125
ESC-Conference
4/21/2020
4/21/2020
4/22/2020 8:25:39 AM
P
CANC
no inspection per BLD inspector note
ESC19-00584
BMP Violation
4/20/2020
4/21/2020
4/21/2020 5:18:03 PM
A
DONE
investigate dumped washout.
Unable to determine who washed out at end of Hope's Well. Will continue to work with Knife River and Black Rock to enforce use of concrete washout and decrease the amount of dumping/trash storage in Parkcenter townhome allies.
ESC19-00522
General Inspection
4/21/2020
4/21/2020
4/21/2020 4:49:15 PM
P
PASS
No trackout, dishcharges or spills. Ecopan washouts on site, storm drains around site have sediment protection
ESC20-00474
Site Preparation
4/21/2020
4/21/2020
4/21/2020 4:26:01 PM
P
PASS
Washed out in pump truck. Site is clean.
ESC18-01191
Site Final
4/21/2020
4/21/2020
4/21/2020 4:25:32 PM
P
PASS
HOme complete. BLD finaled. DI bag removed.
ESC18-00177
Site Final
4/20/2020
4/21/2020
4/21/2020 3:52:09 PM
P
PASS
Homes now in progress and permitted seperately. Blackrock will remove DI bags at end of construction of townhomes
No ESC corrections. Adjacent subdivision phases have their own permits, see ESC19-00584.
This permit finaled.
ESC19-01084
General Inspection
4/21/2020
4/21/2020
4/21/2020 3:50:33 PM
A
PASS
check on dewatering
No discharge at time of inspection. Pond did not appear muddy.
RP and excvator foreman have been taking turbidity measures every hour. Started 5 NTU this morning. The had an exceedence over the 55NTU limit at 85 NTU, but made changes on site to get back down to 35 NTU
Follow up scheduled for tomorrow. Dewatering expected to go until Thursday
ESC19-00026
Aging Inspection
4/21/2020
4/21/2020
4/21/2020 3:46:15 PM
CANC
ESC19-00026
Site Final
4/21/2020
4/21/2020
4/21/2020 3:46:09 PM
P
PASS
Home complete. DI bags to remain installed for ongoing work in the phase. ESC permit finaled
ESC19-00025
Aging Inspection
4/21/2020
4/21/2020
4/21/2020 3:41:34 PM
CANC
ESC19-00025
Site Final
4/21/2020
4/21/2020
4/21/2020 3:41:19 PM
P
PASS
Home complete. DI bags to remain installed for ongoing work in the phase. ESC permit finaled
ESC20-00389
Site Preparation
4/21/2020
4/21/2020
4/21/2020 2:53:03 PM
P
PASS
Brett ###-####
Project superintendant notified that receiving storm drains will be fitted with sediment protection and that concrete washout activity will be conducted at an offsite facility.
Work to begin tomorrow. Approved for construction
Contractor will coordinate with airport facility staff on SWPPP/ESC activities.
ESC18-01191
Aging Inspection
4/21/2020
4/21/2020
4/21/2020 8:42:19 AM
CANC