Inspections for the day of: Tuesday, April 21, 2020.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC19-01707 Site Final4/21/20204/21/20204/27/2020 2:42:35 PMPPASS
ESC18-01273 General Inspection4/21/20204/21/20204/23/2020 4:18:04 PM CANC
ESC17-01088 Site Final4/20/20204/21/20204/23/2020 4:06:31 PMPPASS
SWPPP sign removed as requested and broken sandbags cleaned up. DI bags left in drain for the 2-3 remaining open lots to be under construction

ESC permit finaled.
ESC19-01727 General Inspection4/7/20204/21/20204/23/2020 3:11:11 PMPPASS
Rough grading complete. NO activity at time of inspection. Still need to install utilities and infrastructure. NO trackout to Lake Hazel, no wind blown dust observed.
MIS20-00125 ESC-Conference4/21/20204/21/20204/22/2020 8:25:39 AMPCANC
no inspection per BLD inspector note
ESC19-00584 BMP Violation4/20/20204/21/20204/21/2020 5:18:03 PMADONE
investigate dumped washout.

Unable to determine who washed out at end of Hope's Well. Will continue to work with Knife River and Black Rock to enforce use of concrete washout and decrease the amount of dumping/trash storage in Parkcenter townhome allies.

ESC19-00522 General Inspection4/21/20204/21/20204/21/2020 4:49:15 PMPPASS
No trackout, dishcharges or spills. Ecopan washouts on site, storm drains around site have sediment protection
ESC20-00474 Site Preparation4/21/20204/21/20204/21/2020 4:26:01 PMPPASS
Washed out in pump truck. Site is clean.
ESC18-01191 Site Final4/21/20204/21/20204/21/2020 4:25:32 PMPPASS
HOme complete. BLD finaled. DI bag removed.
ESC18-00177 Site Final4/20/20204/21/20204/21/2020 3:52:09 PMPPASS
Homes now in progress and permitted seperately. Blackrock will remove DI bags at end of construction of townhomes

No ESC corrections. Adjacent subdivision phases have their own permits, see ESC19-00584.

This permit finaled.
ESC19-01084 General Inspection4/21/20204/21/20204/21/2020 3:50:33 PMAPASS
check on dewatering

No discharge at time of inspection. Pond did not appear muddy.

RP and excvator foreman have been taking turbidity measures every hour. Started 5 NTU this morning. The had an exceedence over the 55NTU limit at 85 NTU, but made changes on site to get back down to 35 NTU

Follow up scheduled for tomorrow. Dewatering expected to go until Thursday
ESC19-00026 Aging Inspection4/21/20204/21/20204/21/2020 3:46:15 PM CANC
ESC19-00026 Site Final4/21/20204/21/20204/21/2020 3:46:09 PMPPASS
Home complete. DI bags to remain installed for ongoing work in the phase. ESC permit finaled
ESC19-00025 Aging Inspection4/21/20204/21/20204/21/2020 3:41:34 PM CANC
ESC19-00025 Site Final4/21/20204/21/20204/21/2020 3:41:19 PMPPASS
Home complete. DI bags to remain installed for ongoing work in the phase. ESC permit finaled
ESC20-00389 Site Preparation4/21/20204/21/20204/21/2020 2:53:03 PMPPASS
Brett ###-####

Project superintendant notified that receiving storm drains will be fitted with sediment protection and that concrete washout activity will be conducted at an offsite facility.

Work to begin tomorrow. Approved for construction

Contractor will coordinate with airport facility staff on SWPPP/ESC activities.
ESC18-01191 Aging Inspection4/21/20204/21/20204/21/2020 8:42:19 AM CANC