ESC18-00184
| General Inspection | 4/19/2019 | 4/22/2019 | 4/26/2019 2:53:04 PM | P | PEND |
|
|
Not yet stabilized. ECB installed on backyard is not trenched in. No activity at site. Large gully on common area of sub has not been fixed.
|
ESC18-00617
| Site Final | 4/19/2019 | 4/22/2019 | 4/26/2019 2:52:00 PM | P | PASS |
|
|
Home landscaped. Site cleaned up. Subdivsion BMPs to remain installed for ongoing construction. ESC permit conditions satisfied.
|
ESC17-01196
| General Inspection | 4/19/2019 | 4/22/2019 | 4/23/2019 1:19:34 PM | A | PEND |
|
|
WIP installing rockery walls, which will also help with erosion. Follow up on trash pick up. Culdesac and storm drains were cleaned and are still in good condition.
|
ESC18-01576
| Site Preparation | 4/22/2019 | 4/22/2019 | 4/22/2019 5:14:19 PM | P | PASS |
|
|
No excavation has started. WIP on interior remodel of home and demolition of certain areas. Existing driveway and frontage landscaping preserved.
No corrections. Need to post ESC permit sign.
|
ESC19-00091
| Site Preparation | 4/22/2019 | 4/22/2019 | 4/22/2019 5:13:11 PM | P | PASS |
|
|
Silt fence perimeter installed down slope of excavation. Storm drain in front of site has sediment protection. RP onsite. Noah with RCH will also be on site. Vegetation below project is preserved.
|
ESC17-00452
| General Inspection | 4/22/2019 | 4/22/2019 | 4/22/2019 5:11:20 PM | | CANC |
|
|
|
ESC17-00452
| Site Final | 4/22/2019 | 4/22/2019 | 4/22/2019 5:10:36 PM | P | PASS |
|
|
Work complete. RP Bob with Russel Corp is still onsite on Gratz for the jaguar remodel, see ESC18-01529.
|
ESC17-00585
| Site Final | 4/22/2019 | 4/22/2019 | 4/22/2019 5:10:25 PM | P | PASS |
|
|
Work complete. RP Bob with Russel Corp is still onsite on Gratz for the jaguar remodel, see ESC18-01529.
|
ESC19-00206
| Conference | 4/22/2019 | 4/22/2019 | 4/22/2019 3:20:57 PM | P | PASS |
|
|
2 PM
New RP and company on site to finish job that was started and abandoned. New contact is Toby Hanus w BAK enterprises. Has RP training.
Will use concrete washout, will not access site from below and will use yard and driveway for staging. Needs to remove dirt left at end of road by previous crew.
RP to finish wall installation and will then put jute matting and seed down on the disturbed hillside below. Below the disturbed area exisiting vegetation is preserved.
|
ESC17-00078
| General Inspection | 4/22/2019 | 4/22/2019 | 4/22/2019 12:54:40 PM | | PASS |
|
|
BMPs installed. Trash controlled. Lined washout provided for site. No corrections requested at this time.
|
ESC16-01561
| General Inspection | 4/22/2019 | 4/22/2019 | 4/22/2019 12:45:45 PM | | PASS |
|
|
Project near completion. Finishing up units along Barber Valley Drive.
Temporary BMPs still installed will need to be removed upon completion in addition to a Walling Creek trash search and pickup: - silt fence barrier along Walling Creek - DI bags withing phases 4-5 - remove and clean up area where concrete washout bin was located in the staging area down the street.
No violations observed. -
|
ESC17-01372
| General Inspection | 4/22/2019 | 4/22/2019 | 4/22/2019 12:30:20 PM | | PASS |
|
|
|
ESC18-01411
| General Inspection | 4/22/2019 | 4/22/2019 | 4/22/2019 11:17:51 AM | P | PASS |
|
|
WIP on installing site retaining wall along the north perimeter. Vegetated buffer between work area and NY Canal easement. Fence is open in the NW corner, once wall work is down it will be closed and vehicle tracks repaired.
Site has lined concrete washouts, permit sign posted, RP on site, inspection log in binder.
Verbal correction request to sweep up minor trackout and refresh construction entrance.
|
ESC18-00900
| Site Preparation | 4/22/2019 | 4/22/2019 | 4/22/2019 8:32:39 AM | P | CANC |
|
|
|
ESC39-00001
| Aging Inspection | 4/22/2019 | 4/22/2019 | 4/22/2019 8:24:39 AM | | CANC |
|
|
|