ESC18-01244
| Site Final | 4/23/2020 | 4/23/2020 | 4/29/2020 1:48:22 PM | P | PASS |
|
|
Site is landscaped. No ESC requests. ESC permit finaled.
|
ESC19-00909
| General Inspection | 4/23/2020 | 4/23/2020 | 4/23/2020 5:29:24 PM | | PASS |
|
|
BLD open and actvie. NO disturbed area or construction observed.
|
ESC19-00116
| General Inspection | 4/23/2020 | 4/23/2020 | 4/23/2020 4:59:32 PM | | CANC |
|
|
|
ESC19-00866
| Aging Inspection | 4/23/2020 | 4/23/2020 | 4/23/2020 4:59:17 PM | | PASS |
|
|
|
ESC19-00866
| Site Final | 4/23/2020 | 4/23/2020 | 4/23/2020 4:59:03 PM | P | PASS |
|
|
Home complete. No temp BMPs or loose material on site. ESC permit finaled
|
ESC19-00205
| Aging Inspection | 4/23/2020 | 4/23/2020 | 4/23/2020 4:57:59 PM | | FAIL |
|
|
Trackout. No construction entrance.
Notified RP. Follow up scheduled
|
ESC19-00916
| General Inspection | 4/23/2020 | 4/23/2020 | 4/23/2020 4:29:46 PM | | PASS |
|
|
No activity. No ESC issues. BLD open. Unclear if project is complete.
|
ESC19-01767
| Site Preparation | 4/23/2020 | 4/23/2020 | 4/23/2020 4:19:36 PM | P | PASS |
|
|
WIP on foundation. Concrete washout pan on site. No loose trash. No trackout. No crew onsite. Will post ESC permit sign next inspection.
|
ESC18-01273
| Site Final | 4/23/2020 | 4/23/2020 | 4/23/2020 4:16:44 PM | P | PASS |
|
|
Project complete. Some contained within site need more vegetation, but no runoff issues are occuring. Second phase of project now in progress to the east, see ESC19-01767
|
ESC19-01774
| General Inspection | 4/23/2020 | 4/23/2020 | 4/23/2020 4:01:57 PM | P | PASS |
|
|
Clean site. Permit posted, trash contained. No loose material or dirt leaving site.
|
ESC20-00002
| General Inspection | 4/23/2020 | 4/23/2020 | 4/23/2020 3:47:14 PM | P | PASS |
|
|
WIP on grading and infrastrucuture construction. No fugitive dust or trackout. Approved.
|
ESC19-01518
| General Inspection | 4/23/2020 | 4/23/2020 | 4/23/2020 3:47:00 PM | P | PASS |
|
|
WIP on grading and infrastrucuture construction. No fugitive dust or trackout. Approved.
|
ESC19-00304
| General Inspection | 4/23/2020 | 4/23/2020 | 4/23/2020 3:46:06 PM | P | PASS |
|
|
WIP on homes on Silver Spur and Corona. Washout pan onsite next to job trailer. Storm drains have sediment bags installed.
Notified RP Allen from Hayden to have washout pan service requested for tomorrow.
|
ESC20-00143
| General Inspection | 4/23/2020 | 4/23/2020 | 4/23/2020 3:44:44 PM | P | PASS |
|
|
Trash contained. Sub has washout pan. Posted permit sign for project
|
ESC19-00303
| General Inspection | 4/23/2020 | 4/23/2020 | 4/23/2020 3:34:30 PM | P | PASS |
|
|
WIP putting in subdivision fence. No violations observed. Storm drains have sediment protection.
|
ESC19-00893
| Site Final | 4/23/2020 | 4/23/2020 | 4/23/2020 3:19:48 PM | P | PASS |
|
|
Home complete, landscaped, and DI bags have been removed on Sturgeon.
|
ESC19-00936
| Site Final | 4/23/2020 | 4/23/2020 | 4/23/2020 3:19:36 PM | P | PASS |
|
|
Home complete, landscaped, and DI bags have been removed on Sturgeon.
|
ESC19-00858
| Site Final | 4/23/2020 | 4/23/2020 | 4/23/2020 3:19:23 PM | P | PASS |
|
|
Home complete, landscaped, and DI bags have been removed on Sturgeon.
|
ESC19-00201
| Aging Inspection | 4/23/2020 | 4/23/2020 | 4/23/2020 2:56:11 PM | | PASS |
|
|
WIP. Not yet landscaped. DI bag installed at corner of Spaulding and Eagleson
|
ESC19-00480
| Site Final | 4/23/2020 | 4/23/2020 | 4/23/2020 2:49:56 PM | P | NR |
|
|
Near completion. Yard is landscaped. Notified RP to remove DI bag installed on Eagleson south of site.
|
ESC18-01170
| Site Final | 4/23/2020 | 4/23/2020 | 4/23/2020 2:47:58 PM | P | PASS |
|
|
Home complete and landscaped. No ESC requests.
|
ESC19-01079
| Site Final | 4/22/2020 | 4/23/2020 | 4/23/2020 2:44:46 PM | P | PASS |
|
|
Home complete, DI bag removed on receiving stormdrain. No ESC requests.
|
ESC19-00910
| General Inspection | 4/23/2020 | 4/23/2020 | 4/23/2020 2:34:21 PM | | PART |
|
|
Some trackout occuring due to the recent rain and concurrent haul in of material for parking lot. Construction entrance installed.
Follow up tracking control inspection scheduled
|
ESC19-00862
| Aging Inspection | 4/23/2020 | 4/23/2020 | 4/23/2020 2:27:06 PM | | PASS |
|
|
Home renovation/addition complete. No disturbed area or temp. BMPs. BLD still open. ESC permit finaled
|
ESC19-00862
| DOC - Permit Finaled | 4/23/2020 | 4/23/2020 | 4/23/2020 2:26:25 PM | P | PASS |
|
|
|
ESC06-01306
| General Inspection | 4/23/2020 | 4/23/2020 | 4/23/2020 9:28:53 AM | | CANC |
|
|
|
ESC18-01433
| General Inspection | 4/23/2020 | 4/23/2020 | 4/23/2020 9:20:10 AM | | CANC |
|
|
|