ESC16-00936
| General Inspection | 4/24/2018 | 4/24/2018 | 4/27/2018 4:01:56 PM | | CANC |
|
|
|
ESC17-00535
| General Inspection | 4/24/2018 | 4/24/2018 | 4/27/2018 2:12:09 PM | | CANC |
|
|
|
ESC17-00625
| General Inspection | 4/24/2018 | 4/24/2018 | 4/27/2018 2:11:44 PM | | CANC |
|
|
rescheduled
|
MIS18-00111
| ESC-Conference | 4/24/2018 | 4/24/2018 | 4/26/2018 3:01:52 PM | P | FAIL |
|
|
No trackout or discharges. Developer has still not pulled ESC permit as requested 2 weeks. Double fee applied on permit.
|
ESC17-01648
| Complaint Inspection | 4/24/2018 | 4/24/2018 | 4/26/2018 12:27:20 PM | P | FAIL |
|
|
Concrete washout conducted on open lot across street with containment or permission to use the lot. Correction request to clean up the dried concrete to prevent further illicit washout there.
Told lot owner to post a No Dumping sign.
|
ESC16-01723
| General Inspection | 4/24/2018 | 4/24/2018 | 4/26/2018 12:05:03 PM | | PASS |
|
|
WIP on foundations. Trash contained. No trackout. Subdivsion storm drains have inlet sediment protection that have remaining capacity. Approved.
|
ESC16-01722
| General Inspection | 4/24/2018 | 4/24/2018 | 4/26/2018 12:04:37 PM | | PASS |
|
|
WIP on foundations. Trash contained. No trackout. Subdivsion storm drains have inlet sediment protection that have remaining capacity. Approved.
|
ESC17-01473
| Site Preparation | 4/24/2018 | 4/24/2018 | 4/25/2018 8:08:36 AM | P | PASS |
|
|
Zoo Boise site walk through conducted 11:30 PM 4/24 with RP & project superintendant Justin Palm with CM Company.
ESC permit sign will be posted on main job board. CGP signage info provided to RP for posting.
Site perimeter has been fenced off. Crew has worked with Forestry to mark off tree protection areas. Sediment Control wattles have been installed along the river stream. Additional stakes will be placed this week, did not trench in to protect tree roots. Vegetative buffer will be marked with construction fence. Will inspect during rain event to find discharge points.
Onsite stormwater drains that discharge to zoo river have sediment protection. They will be demolished during first phase of construction, RP will construction temporary drainage swales/basins in the interim. Need to determine re-use of the stormwater vault and cyclone filter installed, to be discussed with Public Works.
Approved for construciton, initial BMPs are ready. Follow up inspection scheduled.
|
ESC17-00618
| General Inspection | 4/24/2018 | 4/24/2018 | 4/25/2018 8:01:28 AM | | PASS |
|
|
WIP applying exterior finish. No loose dirt or debris on sidewalk or in gutter. Trash consolidated in back staging area. MS4 inlet has sediment bag protection.
SIte needs new ESC permit sign posted, will provide to RP
|
ESC18-00488
| Site Preparation | 4/24/2018 | 4/24/2018 | 4/24/2018 2:42:50 PM | P | PASS |
|
|
Pre-construction meetiong completed with PW engineering and ESC division. Approved to begin construction
|
ESC18-00440
| General Inspection | 4/24/2018 | 4/24/2018 | 4/24/2018 12:55:56 PM | P | FAIL |
|
|
Post new ESC permit sign
Clean up concrete washout that is full and wall has broken.
Verbal correction request to RP Mark.
|
ESC18-00171
| Site Preparation | 4/23/2018 | 4/24/2018 | 4/24/2018 11:09:34 AM | A | PASS |
|
|
Noah Phone #: ###-####
Permit sign posted. Rock construction entrance installed with lining. Silt fence sediment controls installed correctly around perimeter. GC to have wattles installed along contour after grading is completed. Efforts will be taken to preserve sagebrush within clearing limits. Storm drain sediment protection installed at Sherman and Mockbee, requested that this be maintained regularly and removed at end of project.
Concrete washout pan to be used for foundation work.
Approved for construction.
|
MIS18-00111
| Set Bond Amount | 4/12/2018 | 4/24/2018 | 4/24/2018 8:58:25 AM | P | CANC |
|
|
|